Post Job Free
Sign in

Project Manager Management

Location:
Duluth, GA
Posted:
April 09, 2013

Contact this candidate

Resume:

RICHARD S. HUTCHINSON

Estimator / Project Manager

Highly motivated, energetic results oriented professional, offering 35

years of successful experience in both new build and construction

renovations.

3912 Whitney Place . Duluth, Georgia 30096 . 770-***-**** .

**********@*****.***

Professional Profile

. 35 YEARS ESTIMATING / PROJECT MANAGEMENT EXPERIENCE, COMPLETING

GROUND UP AND RENOVATIONS OF HOTELS, SCHOOLS, RETAIL CENTERS,

CHURCHES, MUNICIPAL, MILITARY (INCLUDING CORPS OF ENGINEERS).

. 20 + years Hard Bid experience.

. Experienced Construction Analyst for the United States of America

SBA disaster program.

. Credentialed SBA - FIT program Construction Analyst.

. Credentialed FEMA Project Specialist

. Timberline trained, comfortable with all MS Office programs.

Career Accomplishments

JADE GROUP INC, DULUTH GEORGIA 2012-2013

Sr. Estimator

. Development and management of project budgets, estimates, and

project schedules, and management of Owner, Operator and

Consultants to achieve timely decisions on scope, budget, schedule

and design.

. Initiate, monitor and manage cost management and/or accounting

procedures, monthly draw and project cost reports.

. Develop cost estimates from low order of magnitude, to detailed

conceptual budgets for multimillion dollar hotel renovation and new

build projects, using both negotiated as well as hard bid

processes.

. Complete full PIP and PCA assessments including arranging and

managing consultants and contractors from selection thru hard bid

THE JOHN HARDY GROUP, ATLANTA GEORGIA 2005-2009

Project Manager, 2008 -2009

Project Director, 2007-2008

Sr. Estimator, 2006-2007

Consultant, 2005

. Responsible for project management, leadership and JHG performance

for all types of projects and services.

. Implementation of the overall plan of the Sr. Projector in

establishing project goals and needs as well as the development and

management of project scope and cost alternatives.

. Development and management of project budgets, estimates, and

project schedules, and management of Owner, Operator and

Consultants to achieve timely decisions on scope, budget, schedule

and design.

.

. Initiate, monitor and manage cost management and/or accounting

procedures, monthly draw and project cost reports.

. Preparing schedules, reviewing and advising ownership on consulting

contracts and assembling contract forms, insurance requirements,

etc.

. Management of JHG field staff for project support

. Representation of lenders and owners on multimillion dollar

projects, both new build and renovations. Monitor progress, and

attend monthly project meetings. Report on status of projects as

well as concerns with processes and workmanship.

. Develop cost estimates from low order of magnitude, to detailed

conceptual budgets for multimillion dollar hotel renovation and new

build projects, using both negotiated as well as hard bid

processes.

. Complete full PIP and PCA assessments including arranging and

managing consultants and contractors from selection thru hard bid.

. Analyze the damages to Lindy Boggs Memorial Hospital and two other

minor feeder hospitals in New Orleans after Hurricane Katrina.

Selected Projects Representative:

Gavensroot Hoel Miami Florida

Sr Estimator

Doral Country Club Miami Florida Sr Estimator

Washington, DC Project Manager

A-Loft at National Harbor

Marriott Logan Airport Boston, MA Project Director

Conversion

Palomar Hotel Atlanta, GA Project Director

Hyatt Regency St Louis St Louis, MO Project Director

Riverfront

Adams Mark Hotel Conversions 5 Cities Sr. Estimator

Le Royal Meridien Hotel Toronto Canada Sr. Estimator

Campanile Paris, France Sr. Estimator

Hyatt Fairfax Fairfax, VA Sr. Estimator

Capital Bricknell Miami, FL Sr. Estimator

Doral Resort Palm Springs, CA Sr. Estimator

W Hotel Fit and Finish Starwood Hotels Sr. Estimator

W Hotel Clarendon, VA Sr. Estimator

Sheraton Four Points Tempe AZ Sr. Estimator

Hotel Washington Washington, DC Sr. Estimator

Chateau lan Braselton, GA Sr. Estimator

Hyatt Regency Houston, TX Sr. Estimator

Chicago City Center Chicago, IL Sr. Estimator

Omni Hotel Fort Worth, TX Sr. Estimator

America's Mart 4 Atlanta, GA Sr. Estimator

Lindy Boggs Memorial New Orleans, LA Sr. Estimator

Hospital

The United States of America 2004 - Current

Construction Analyst ~ Loss verifier ~ Surveyor

. Responsible for surveying and construction analysis of Disaster

sites after four major hurricanes.

. Quantify losses to residential and small businesses, and monitor

progress of re-construction. Approval of draw requests for

reconstruction.

. 2004-2005 Active as a loss verifier on the Ohio River and Tennessee

River after Francis, Ivan, and to a small extent Ivan, caused

severe flooding.

. In spring of 2005 we surveyed the White River after the winter

severe storms.

. In the fall of 2005 I was called by Dale Stagner, to report to New

Orleans, after Katrina. The same day, I was called by the John

Hardy Group, and advised that they

had secured an assignment with Crawford and Company to assess the

damages to Lindy Boggs Hospital, one of the 3 main hospitals in the

area. I accepted the offer, and spent 4 months with the team,

assessing, room by room, this hospital, (estimating via Timberline

and Marshall and Swift) and 3 smaller feeder hospitals.

. 2009 ~ Atlanta Georgia quantify losses after major flooding.

. 2010 Chicago Illinois ~ quantify losses after major flooding.

Gwinett realty associates 1996 - 2004

Broker

. Wholly owned Commercial and Residential real estate investments and

brokerage.

. State licensed Real Estate Broker

R.S. Hutchinson and Company, Inc 1986 - 1996

. President Managing and directing a specialized (municipal, military

and school) general contracting firm.

Education

. SOUTHERN TECHNICAL INSTITUTE ~ ARCHITECTURAL ENGINEERING TECHNOLOGY

Marietta, Ga.

INDUSTRY SERVICE

. ASSOCIATED BUILDERS AND CONTRACTORS OF GEORGIA

o Board of Directors 1980 - 1992

o Represented the ABC in the transfer of the Building

Construction program from Georgia Institute of Technology to

Southern Technical Institute

o Builder's Cup Recipient 1986

. Associated General Contractors of America

In addition to my professional life, I have participated in and led

multiple Mission trips internationally, building and renovating homes

and churches in Honduras, Costa Rica, El Salvador, and Russia for the

past 15 years.

MILITARY

US ARMY ~ 1967-1968

DEMOLITION SPECIALIST

DONG TAM VIET NAM

30% DISABILITY AWARDED

REFERENCES:

Mr. Randy Ruth

Dir. of Operations

JADE GROUP INC.

404-***-****

Mr. Ed Hulsey

Project Manager, Sr. Estimator

The John Hardy Group

678-***-****

Mr. Jack Fuller

(Former) Director of Estimating

The John Hardy Group

770-***-****

Mrs. Sylvia Bates

770-***-****



Contact this candidate