Post Job Free
Sign in

Project Manager Construction

Location:
San Diego, CA, 92110
Posted:
April 09, 2013

Contact this candidate

Resume:

[pic][pic][pic][pic]

Abdul Hakim Al Khalil

Projects Manager

Personal Information [pic]

Marital Status:

Married

Nationality:

Syrian

Resident of:

United Arab Emirates - Abu Dhabi

Mobile

050 -9076754

Email :

abq1of@r.postjobfree.com

Objective [pic]

To share my experience for the betterment of the organization for managing and

controlling

overall project constraints to meet targets on time and within budget

Professional Skills [pic]

Supervision of high rise Building extensive design & detailing.

Take responsibility for quality and work compliance to the specified standard and

specifications.

Extensive experience in project management and execution of construction.

Project management, supervising and coordinating the work of others including

Client interaction and meetings.

Planning, resourcing, monitoring of external contracts.

Project and organization setup, chairing internal and client meetings.

Tender assessment and evaluation both technically and commercially.

Setting up Contract details with external sub-contractors and consulting

engineering firms.

Building refurbishment and maintenance.

Preparation of design shop drawings, including review and approval of design

details and technical submittals of civil and electromechanical works.

Approval and supervision of steel structure and foundation construction.

Vendor and supplier technical and commercial bid evaluation related to project

material specifications and approval of procurement order.

Contractor cost analysis including the continuous project risk management.

Management of Change and assessment of variations and claims.

Development of project execution plan (PEP) and Document tracking and logging

systems.

Development of communication and interface management procedures.

Work Experience [pic]

Hannover Consulting Engineer

June 2007 to the present

Projects Manager

Managing and controlling overall projects ( high rise building, Multi-storey

Buildings, Industrial Building,. est.)

Some of building I led with:

- Sheikh seif building, 3Baisement+Gf+mizzanin+20 typical ( 365000 million)

- Sheikh Fatima Bint Mubarak Building 3Basements+GF+Mezz+12typical (72000000)

- Sheikha wadima Bint Zayed Building 3 Basements +GF+Mezz+20 typical(190000000)

- Sheikh Sultan Bin Tahnoon Building 3 Basements +Gf+Mezz+20typical (190000000)

- Manaa Seif Khouri Building 3 basements + GF+ Mezz + 20 typical (55000000)

- Moh Sultan Al Mansouri Apartments hotel 3 Basements+Mezz + 12 Typical (

7000000)

- Ali Rashid Musabah Al Dhahiri Apartments Hotel 3 Basement + Mezz + 12 Typical

67000000

- Sheikh Sultan Bin Tahnoun 72 Villas ( 142000000)

Top Building General Contracting Co. April 2005 to May

2007

Manager. (My Own company)

Several of commercial and private villas in Abu Dhabi.

Next Consulting Engineer Al- Ain Office

February 2004 up to April 2005

Branch Manager:

Responsible for managing and designing all aspects of the construction of

commercial, residential and utility building

Projects Description :

Top foam (Car service and several shops) 14 million Dhs .

Top foam (Car service and several shops) 35 million Dhs .

Villas

PROJACS (Project Management and Control Co) Construction Manager

March 2003 to January 2004

Projects Description :

Shooting Range Club - Al Samaliya Island, Abu Dhabi (Client: Work Department)

Awkaf Residential Building - (Client: General endowment Authority)

Education zone ( Client: Educational ministry )

CPPM, Abu Dhabi

March 1995 - March 2003

Projects Manager:

Responsible for the management of all building projects both in UAE and overseas.

This includes provision of engineering services to projects and liaison with other

departments. Some of the main projects that I led include

Projects Description :

His Highness's Royal Palace in Jabal Hafit, and its attachments.

This included 5 No. of chalets, a separate professional kitchen, other utilities

and plant units. This involved a detailed in-house design and supervision of

construction sub-contractors works. It also involved developing the project design

brief and all relevant specifications for a state of the art completion.

300 beds Hospital in Quita Pakistan. .

This involved similar activities to those detailed above including the direct

supervision of all design activities by the consultants, and the control and

planning of site construction and cost assessment.

Breading and Farming of Falcons facilities in Al Ain, Abu Dhabi and Damascus.

Supervision of the design and construction of the centre and its related utilities

and personnel accommodation and facilities..

UAE Embassy building of Turkmenistan.

Design supervision and review for all project related activities. This includes

the main Embassy building as well as the required accommodation for the ambassador

and staff.

Renewal and upgrading of the airport runway for Mari Airport in Turkmenistan.

This also included the introduction of a new Approach Glide Landing (AGL) and

Instrument Landing System (ILS) system.

Supervision of the detailed design and execution for HH Palace in Rabat Morocco.

Responsible for the management of all project activities including lengthy

secondments in Morocco, and the provision of engineering services to the project

and liaison with contractors.

Supervision of the detailed design for HH Palace in Mahi Seychelles Island. This

included direct supervision of project construction in Seychelles Island until

handover by the contractors.

Furthermore, a large number of medium projects were completed under my direct

management

Conser Consulting Engineers. Al Ain

December 1989 - March 1995

United Arab Emirates

Construction Manager

Responsibility

I was in charge of managing and designing all aspects of the construction of

commercial, residential and utility buildings. The projects that I was involved in

the capacity of lead design and project manager include:

Projects Description:

Coca Cola Factory in Al Ain. My role was to supervise all construction activities

including design of the main steel hangars, civil foundation, cladding, and all

associated piping and plumbing fittings.

General and individual design of villas.

Ahmad Al Sharif commercial offices building block in Al Ain.

Project execution for a large number of individual residential buildings in Al Ain

Al Nasiri family complex. This included design review by the consultant and a

direct project execution. The complex consists of a number of villas, a number of

Majlis, kitchens and service and utility buildings, including all required

infrastructures.

Al Ain cooperative superstores. 4 Nos. This included a preparation of all required

bid input that was awarded to the firm. It also involved direct detailed design

and construction with all related procurement activities and evaluations.

Syrian Arab Construction Company.

August 1982 - December 1989

Project Manager.

Project Description :

Managed a number of projects including College of Higher National Diploma for

Electromechanical Technicians, Aleppo. This involved the design activities for the

main building including a lecture theatre, workshops and all other laboratories,

warehouses, clinic and the relevant infrastructure

Languages [pic]

Language

Level

English

Very good

Arabic

Mother Tongue

Education [pic]

B.Sc.: Architecture Aleppo University -Syria 1982

PMP certificate from (SDSU) San Diego State University U.S.A

Member of Institution of engineers - Syria (CEng)

Member of the Arbitration Committee - Abu Dhabi Chamber of Commerce

ISO: 2008 standards &Internal Auditor Training Course.

Bottom of Form



Contact this candidate