[pic][pic][pic][pic]
Abdul Hakim Al Khalil
Projects Manager
Personal Information [pic]
Marital Status:
Married
Nationality:
Syrian
Resident of:
United Arab Emirates - Abu Dhabi
Mobile
050 -9076754
Email :
********@*****.***
Objective [pic]
To share my experience for the betterment of the organization for managing and
controlling
overall project constraints to meet targets on time and within budget
Professional Skills [pic]
Supervision of high rise Building extensive design & detailing.
Take responsibility for quality and work compliance to the specified standard and
specifications.
Extensive experience in project management and execution of construction.
Project management, supervising and coordinating the work of others including
Client interaction and meetings.
Planning, resourcing, monitoring of external contracts.
Project and organization setup, chairing internal and client meetings.
Tender assessment and evaluation both technically and commercially.
Setting up Contract details with external sub-contractors and consulting
engineering firms.
Building refurbishment and maintenance.
Preparation of design shop drawings, including review and approval of design
details and technical submittals of civil and electromechanical works.
Approval and supervision of steel structure and foundation construction.
Vendor and supplier technical and commercial bid evaluation related to project
material specifications and approval of procurement order.
Contractor cost analysis including the continuous project risk management.
Management of Change and assessment of variations and claims.
Development of project execution plan (PEP) and Document tracking and logging
systems.
Development of communication and interface management procedures.
Work Experience [pic]
Hannover Consulting Engineer
June 2007 to the present
Projects Manager
Managing and controlling overall projects ( high rise building, Multi-storey
Buildings, Industrial Building,. est.)
Some of building I led with:
- Sheikh seif building, 3Baisement+Gf+mizzanin+20 typical ( 365000 million)
- Sheikh Fatima Bint Mubarak Building 3Basements+GF+Mezz+12typical (72000000)
- Sheikha wadima Bint Zayed Building 3 Basements +GF+Mezz+20 typical(190000000)
- Sheikh Sultan Bin Tahnoon Building 3 Basements +Gf+Mezz+20typical (190000000)
- Manaa Seif Khouri Building 3 basements + GF+ Mezz + 20 typical (55000000)
- Moh Sultan Al Mansouri Apartments hotel 3 Basements+Mezz + 12 Typical (
7000000)
- Ali Rashid Musabah Al Dhahiri Apartments Hotel 3 Basement + Mezz + 12 Typical
67000000
- Sheikh Sultan Bin Tahnoun 72 Villas ( 142000000)
Top Building General Contracting Co. April 2005 to May
2007
Manager. (My Own company)
Several of commercial and private villas in Abu Dhabi.
Next Consulting Engineer Al- Ain Office
February 2004 up to April 2005
Branch Manager:
Responsible for managing and designing all aspects of the construction of
commercial, residential and utility building
Projects Description :
Top foam (Car service and several shops) 14 million Dhs .
Top foam (Car service and several shops) 35 million Dhs .
Villas
PROJACS (Project Management and Control Co) Construction Manager
March 2003 to January 2004
Projects Description :
Shooting Range Club - Al Samaliya Island, Abu Dhabi (Client: Work Department)
Awkaf Residential Building - (Client: General endowment Authority)
Education zone ( Client: Educational ministry )
CPPM, Abu Dhabi
March 1995 - March 2003
Projects Manager:
Responsible for the management of all building projects both in UAE and overseas.
This includes provision of engineering services to projects and liaison with other
departments. Some of the main projects that I led include
Projects Description :
His Highness's Royal Palace in Jabal Hafit, and its attachments.
This included 5 No. of chalets, a separate professional kitchen, other utilities
and plant units. This involved a detailed in-house design and supervision of
construction sub-contractors works. It also involved developing the project design
brief and all relevant specifications for a state of the art completion.
300 beds Hospital in Quita Pakistan. .
This involved similar activities to those detailed above including the direct
supervision of all design activities by the consultants, and the control and
planning of site construction and cost assessment.
Breading and Farming of Falcons facilities in Al Ain, Abu Dhabi and Damascus.
Supervision of the design and construction of the centre and its related utilities
and personnel accommodation and facilities..
UAE Embassy building of Turkmenistan.
Design supervision and review for all project related activities. This includes
the main Embassy building as well as the required accommodation for the ambassador
and staff.
Renewal and upgrading of the airport runway for Mari Airport in Turkmenistan.
This also included the introduction of a new Approach Glide Landing (AGL) and
Instrument Landing System (ILS) system.
Supervision of the detailed design and execution for HH Palace in Rabat Morocco.
Responsible for the management of all project activities including lengthy
secondments in Morocco, and the provision of engineering services to the project
and liaison with contractors.
Supervision of the detailed design for HH Palace in Mahi Seychelles Island. This
included direct supervision of project construction in Seychelles Island until
handover by the contractors.
Furthermore, a large number of medium projects were completed under my direct
management
Conser Consulting Engineers. Al Ain
December 1989 - March 1995
United Arab Emirates
Construction Manager
Responsibility
I was in charge of managing and designing all aspects of the construction of
commercial, residential and utility buildings. The projects that I was involved in
the capacity of lead design and project manager include:
Projects Description:
Coca Cola Factory in Al Ain. My role was to supervise all construction activities
including design of the main steel hangars, civil foundation, cladding, and all
associated piping and plumbing fittings.
General and individual design of villas.
Ahmad Al Sharif commercial offices building block in Al Ain.
Project execution for a large number of individual residential buildings in Al Ain
Al Nasiri family complex. This included design review by the consultant and a
direct project execution. The complex consists of a number of villas, a number of
Majlis, kitchens and service and utility buildings, including all required
infrastructures.
Al Ain cooperative superstores. 4 Nos. This included a preparation of all required
bid input that was awarded to the firm. It also involved direct detailed design
and construction with all related procurement activities and evaluations.
Syrian Arab Construction Company.
August 1982 - December 1989
Project Manager.
Project Description :
Managed a number of projects including College of Higher National Diploma for
Electromechanical Technicians, Aleppo. This involved the design activities for the
main building including a lecture theatre, workshops and all other laboratories,
warehouses, clinic and the relevant infrastructure
Languages [pic]
Language
Level
English
Very good
Arabic
Mother Tongue
Education [pic]
B.Sc.: Architecture Aleppo University -Syria 1982
PMP certificate from (SDSU) San Diego State University U.S.A
Member of Institution of engineers - Syria (CEng)
Member of the Arbitration Committee - Abu Dhabi Chamber of Commerce
ISO: 2008 standards &Internal Auditor Training Course.
Bottom of Form