John Hill
PO Box ***, Hughes Springs, Texas *****
Contact: 903-***-****
Email: ***************@*****.***
Objective To obtain a rewarding position that will fulfill both the goals of my company and family
Summary Of Qualifications
Great American Coil – White Oak, Texas 2010 2012
Production Supervisor: Provide supervision and technical support to sheet metal department for small HVAC
coil manufacture. Department manufactures bent sheet metal components for HVAC coils using CNC hole
punching equipment and both NC and manual brake press equipment. Direct supervision of five day shift and
three evening shift hourly employees.
Specialty Coils LLC Longview, Texas 2009 2010
Operations Manager: Provide technical support for small OEM coil manufacturing company. UL certification,
computer and LAN management, coil design, customer service, sales support, setup and attend ASHRAE
show, quality control, purchasing and inventory management, quickbooks enterprise setup and
implementation, develop part number system.
PPC Industries Longview, Texas 2007 2008
Drafting & Design: Provide commercial architectural drawings for construction of large scale industrial process
control chemical/biological filtration equipment “Bio Filter” used in the wood products industry. Search for
contractors to complete construction of projects from 250 450K. Send out bid packages for detailed projects,
follow up with technical help for selected contractors and local building authorities. Aid in design & drafting of
air ventilation stacks, safety platforms. Use Solidworks 2008 to design model and create production drawings
for new dry electrostatic precipitator model for shipment to overseas projects. (dry ESP scrubber) Provide
detailed structural colums, beams, panels and mechanical support systems. high voltage housings to 75KV,
bus ducts, access ladders, safety railing and platforms.
Big Tex Trailers Mount Pleasant, Texas 2006 2007
Drafting & Design: Modify existing drawings and develop new production drawings for major commercial
trailer manufacturer. Solidworks and Autocad used to design 3D components and assemblies for production
drawings and BOM’s. Worked on gooseneck, dump trailers and standard utility trailer. Edit and provide
graphic support for safety brochure.
Fedders Unitary Products Longview, Texas 2005 2006
Mechanical HVAC Design & Drafting: Modify drawings and develop new production drawings for water ground
source heat pumps using Autocad and Pro Engineer. Provide design, cost improvements to existing Addison
Products rooftop units. Review existing components to meet design requirements. Coil selection, line sizing,
compressor review, TXV sizing, Design sheet metal components for 16 36 ton rooftop unit.
1 Page
GB Coil Longview, Texas 2003 2005
Mechanical HVAC Design & Drafting : Design and develop finned tube heat exchangers for commercial and
residential HVAC and refrigeration applications. Provide price quotations and engineering support for
customers technical questions. Procurement of aluminum and copper, includes setup and negotiating
purchase price. Travel to customer job site to select replacement coils, unit evaluation. Attend ASHRAE show.
Troubleshoot production equipment (presses, dies, expanders, turret presses, compressors, dryers etc.) for
mechanical, electrical, hydraulic faults. Travel to machine tool manufactures location and review equipment
specifications. Installation of fin press and tube bender at Heat Pipe Technology, Florida. Autocad 2000,
Autolisp.
Satterwhite Log Homes Longview, Texas 1999 2002
Architectural Drafter/ Designer: Work between sales staff and customer conceptual ideas to develop building
floor plans for construction from both stock and custom plans. Work included evaluating customer ideas,
offering design options and improvements based on structural, cost, aesthetic and ergonomic space planning
analysis. Autocad 2000, Autolisp, Microstation, Chief Architect.
Eubank Manufacturing Longview, Texas 1999
Lab Technician: Design, setup and test wall mounted air conditioning units using indoor and outdoor simulated
conditioning chambers with PID controllers. Charge, evacuation, reclaim refrigerants in units. Brazing welding.
Electrical motor testing. Fan blower capacity testing. Sheet metal fabrication.
Delta Fabrication – Daingerfield, Texas 1998
Structural Detailer: Design and detail structural connections for industrial buildings from engineered drawings
using AutoCad R14 for production. Network Cad computers and printers together.
Krack Inc. Addison, Illinois 1996 1997
Manufacturing Engineer: Responsible for providing the most efficient cost effective methods of product
manufacturing through identification of cost savings in both labor and equipment. Involved with operations
planning and special projects. Worked with product engineering to improve both current and new product
designs. Provided alternate designs to help improve production speed and efficiency.
Computer: Autocad R13/14, MS Office, Powerpoint, Visio, MicroTek CAM, various DOS applications.
Specific Projects: Installation of automated electrical panel testing equipment through terminal block
connection. Design and layout of new product manufacturing line. Purchase material handling equipment and
associated products for line. (conveyors, racks, jib cranes) Design and specify associated hand tools, fixtures.
Design and oversee installation of line power sources (electrical, pneumatic). Designed and installed
Gas/Oxygen braze welding system. Specify all products equipment purchase specifications. Interfaced
automated product run test equipment with IBM AS/400 using DOS Client Server applications. Installed IBM
PC computer stations through LAN connection. Installed Intertec remote bar code printers and identification
system to monitor products in production. Designed and installed automated moisture testing equipment.
Age Industries Inc. Cleburne, Texas 1996
General Manager: Responsible for managing operations of small 700K manufacturing facility with 25
employees. Products included finned tube heat exchangers, radiators and automotive evaporators.
CP/AAON Inc. Longview, Texas 1992 1996
2 Page
R&D Engineering: Obtained ARI coil certification on and 5/8 tube coil lines. Worked extensively with
customers to design coils for specific applications using AcadR12. Supervise UL Certification and Follow Up
procedures. Specific fields dealing with thermodynamics and heat transfer engineering in HVAC applications.
Quality Manager / Applications Engineer: Responsible for all aspects of product quality management and
continual development and implementation of quality programs. Reviewed, analyzed and prepared quality
reports for management team. Identified problem areas in manufacturing then developed and implemented
programs to correct problems. Developed and managed customer RMA program. Worked with management
team on fiscal year budgeting and development of operational plans. Redesigned the layout and location of
plant operations. Purchased manufacturing equipment and provided product specifications to purchasing.
Administrative Maintenance Supervisor, Packing and Shipping Supervisor : Oversee maintenance department.
Worked with maintenance supervisor to coordinate scheduled and emergency machine shutdowns. Reviewed
major equipment purchases. Responsible for managing packaging and shipping departmental supervisors.
Coils Plus Inc. Longview, Texas 1988 1992
Fin Press Operator / Diesetter: Setup and operation of 5/16, 3/8,, 5/8 progressive fin dies. Responsible for
the operation of fin stamping equipment including Oak, Hidaka and Komatsu. Tube Expander Operator: Setup
and operation of tube expansion machines both mechanical and HydroCNC Programmer / Operator:
Program, setup and operation of CNC hole punching machines using Fanuc GN6 controllers including
machine programming using G Code. Used sheet metal fabricating equipment, including shears form
presses. Setup and installed forming dies in brake presses.
Design Engineer: Worked with customer specifications to design heat exchangers for various process
applications. Used Autocad R10 to design heat exchangers. Developed and implemented coil selection
program. Developed and implemented computer generated parametric design drawing program. Aided in
setup and implementation of CAD/CAM system.
Safety Manager / Quality Control Manager: Assumed additional responsibilities for safety and quality control.
Worked extensively with OSHA inspections. Accident prevention, continued maintenance of safety programs.
Implemented quality control program. Supervised 5 quality assurance inspectors. Traveled with sales to
provide engineering and quality support.
Other Skills: Extensive computer repair & troubleshooting. Experience with a wide variety of computer
applications and operating systems, including MS Word, Excel, Powerpoint, Access, Windows Operating
Systems, MS Dos, LAN’s, TCP/IP setup, Visual Basic, 3D Modeling using 3D Studio, Autocad 3D and 2D
experience, SolidWorks, Pro/E, Some Solidedge R&R Supply (Farr)
Education
Pine Tree High School Longview, Texas Graduate 1979 1983
Kilgore Junior College Kilgore, Texas Attended 1987 1988
References Available On Request
3 Page