Post Job Free
Sign in

Project Construction

Location:
Franklin, NC, 28904
Salary:
115000.00
Posted:
April 10, 2013

Contact this candidate

Resume:

PROJECT LEAD – PROJECT DIRECTION – LEADERSHIP – HONOR AND INTEGRITY –

PROFESSIONALISM – WINNER – FAMILY - SAFETY - QUALITY

Mark C. Pope

SENIOR CONSTRUCTION PROFESSIONAL - 15 YEARS EXPERIENCED

Able to cover and work 2 States (Florida and North Carolina)

Consultant or Direct Hire Opportunities Desired

Highlights

Strong Experience in the area of Directing, Supervising and Managing Large and Intricate Heavy

Civil Safety, Commercial and Residential projects

Effectively maintained all Federal, State and Local Safety procedures

Experience maintaining corporate management standards - Expertise in EHS management systems

(ISO 9001, 14001/OHSAS 18001)

Highly Competent in PSM and BHB – Safety Protocols for Plant Environments

Strong competency in Intricate Heavy Civil, Commercial and Residential Safety in a Marine

Environment

Implemented effective strategies & safety measures to increase safety & reduce risk exposures to

employees and contracting companies along with working directly with Contractors Insurance

and Risk Managers to lower insurance premiums

Successfully planned the handling of specific DFOW’s for USACE, Commercial Projects

Extremely knowledgeable of NAVFAC/USACE safety procedures to include (OSHA 29 C FR 1910

and 1926 standards).

EXPERIENCED IN CONSTRUCTION MANAGEMENT, USACE CORPS APP/EPP REQUIRMENTS, CQM CERTIFIED, CIVIL

CONSTRUCTION METHODOLOGIES, BEHAVIORAL BASED SAFETY PROGRAMS and PROCESS SAFETY

MANAGEMENT ORIENTED

128 Pinners Point Hayesville, NC 28904

PO BOX 1367 Hayesville, NC 28904-1367

850-***-**** Cell

Email: **********@*****.***

PROJECT LEAD – PROJECT DIRECTION – LEADERSHIP – HONOR AND INTEGRITY –

PROFESSIONALISM – WINNER – FAMILY - SAFETY - QUALITY

Work Experience – COMMERCIAL, FEDERAL, STATE, LIGHT INDUSTRIAL

2012 - 2013

Level VI – SSHO (McCarthy Builders Inc.) Texarkana, Texas for Design Build USACE – Red River Army

Depot “Maneuver Systems Sustainment Center Ft. Worth District. Contract #W9126G -12-C-0015. Project

disposition is for new construction of a 3 story facility for US Army to include facilities, Tilt -Wall Panels

during construction, installation of all utilities to include “Gas -Water-Sewer-Comm Lines-Power,

Foundation (Site Preparation), Form and Pour Concrete on Sub Grade/Beams and Concrete Slab o n Grade.

Worked as Primary Safety Officer and Alternate Superintendent in a “JV” Joint-Venture capacity for

McCarthy and GCC Enterprises. Project duration is 19 months and cost is 49.5 million. My duties currently

include Coordination Meeting, Sub-Contractor evaluation and orientation process, coordination of all site

access privileges with Base Access/Control, coordination of Haul routes and management of internal base

access for all material entering or leaving site with base personnel. Coordination with EMS, Fire,

Police/MP's on the Post. Duties also include working with all subs coordinating needs to include

streamlining the approaches for submittal process for the GDA and getting those assets approved and on -

site more quickly. Liaison for contractor with GDA on all Safety Related Items, coordinate and review AHA

submittal process to include all Critical Lift Plans, Concrete and Sub Grade related task.

03/2011 till 09/2012

Level VI – SSHO/Alt Superintendent – National Safety Consulting Partnership with (HW Pence

Construction/Russell Construction) for USACE Rock Island District for Lockport Lock/Dam Pool

Rehabilitation Project USACE Contract Number W912QR -09-D-0017-CD01 Lockport, Illinois Stage II

Controlling Works.

Working with USACE and Metropolitan Water Reclamation District (MWRD) Chicago on the Chicago

Sanitary Discharge Canal. Project duration 18 mos., revamp – refit 7 sluice gates, demolish and rebuild 7

piers, engineer and build 2 180,000 pound cofferdams and place from land in canal to provide pr otection

of all below water piers (demo and replace limestone, capping, granite sub structure) Transfer from land

to barges Lieberr 1300 Crane to Barges after placement of cofferdam and continue process from canal on

other 7 piers. Place/Erect Porta-Dam and Dewater pool areas associated with work plan. Coordinated all

meetings with USACE and Prime/prime Sub, Manage and Oversee prime and Prime Sub personnel during

dive operations to include process of the following: placement of cofferdams, dewatering, insid e/outside

cofferdam dive inspections, oversee lockout/tagout process of sluice gates for dewatering operations,

inspect and oversee scaffolding inspections and erection operations for pier demo and replacement.

128 Pinners Point Hayesville, NC 28904

PO BOX 1367 Hayesville, NC 28904-1367

850-***-**** Cell

Email: **********@*****.***

PROJECT LEAD – PROJECT DIRECTION – LEADERSHIP – HONOR AND INTEGRITY –

PROFESSIONALISM – WINNER – FAMILY - SAFETY - QUALITY

Level VI – SSHO/Quality Control Officer – USACE Chicago District for Levee Construction (Little Calumet

Flood Control Project Stage VII) 15.9 Million 17 mos. Install Sheet Pile and supervise/oversee cast in place

concrete flood wall, drainage improvements to local storm and sanitary to include ret rofit River Drive

Pump Station 72”, 54” 36” pipes. Construct cofferdam to extend footprint of pump station to USACE

Specifications. Worked over 127,000 man-hours with No Loss Time or Recordable Injuries, over 6 trades

involved in project working 6/10 hour days at times. Project scope included working with 2 (City/Local)

districts and mutual coordination with State DEP, Indiana Dept. of Environmental Management, USACE

QA/QC personnel, Hammond and Munster Indiana Civil Engineers, Local fire and EMS/Police to

coordinate equipment and road blocking operations. Aug 9, 2009 – February 22, 2011 Ceres

Environmental Services Inc.

Level VI – SSHO/QCM – USACE Rock Island District for Levee Construction (Birdland Levee Project) 11.8

Million 11 mos. The flood damage reduction features consist of constructing 7,700 feet of levee and 440

feet of retaining wall with one closure structure phase 2 – was constructing 5,900 feet of levee generally

along and extending the existing non -Federal Central Place levee; and modifying t hree existing pump

stations. The recommended plan also included modification to nineteen closure structures in the existing

Federal downtown levee system including permanently closing 7 levee closures, reducing the size of 11

levee closures, and installing gates at existing pedestrian walkway closures. The recreation features

include installation of 5,100 feet of recreational trail along the Birdland Park levee with access to

Riverview Park and landscaping along the levee crossing. Work consisted of excavat ion, trenching, rip rap

installation, coffer dam installation, installing rebar and concrete pours to accomplish DFOW’s for corps.

March 2010 to February 22, 2011 Ceres Environmental Services Inc.

Level VI – Safety Officer/ QC for USACE - Contract Disaster Recovery Operations/Blue Roof program.

Oversaw over 100 Subs to include Equipment Safety Inspections, Daily Tool Box Talks, performed initial

Contractor Orientations and field follow-ups to all USACE QA – near miss incidents and complaints.

Coordinated City and State agencies for several FEMA/USACE Demolition programs on severely damaged

commercial and residential structures in Louisiana. Worked in Louisiana and Texas in 2008, where 36,235

temporary roofs were installed as a result of Hurricanes Gustav and Ike.

Level V – SSHO/Superintendent. for USACE - Jefferson Parish, Louisiana Project Description: Project

consisted of selective demolition, 54” force main, steel pipe pile, pump station cofferdam, complete pump

station, excavation, embankment, granul ar material, bedding material, 3700 linear of flume concrete

structure, temporary retaining structures, utilities relocation, drainage, de-watering, and other related

work. Owner/Agency: Jefferson Parish Department of Public Works

128 Pinners Point Hayesville, NC 28904

PO BOX 1367 Hayesville, NC 28904-1367

850-***-**** Cell

Email: **********@*****.***

PROJECT LEAD – PROJECT DIRECTION – LEADERSHIP – HONOR AND INTEGRITY –

PROFESSIONALISM – WINNER – FAMILY - SAFETY - QUALITY

Level V – SSHO/Superintendent for USACE - Pearl River Country, Mississippi & St. Tammany Parish, and

Louisiana Project Description: The work consisted of constructing five closures with rip -rap and stone,

one sheet pile weir, excavating a pilot channel of the Pearl River, erosion control, clearing & snagging for

channel excavation. Contract Value: $3, 8 Mil Owner/Agency: Corps of Engineers, Vicksburg District

Level V – SSHO/QCM Pearl River Country, Mississippi & St. Tammany Parish, Louisiana Project

Description: The work consisted of constructing weir, closure repair, earth work, engineering fabric, stone

protection, cofferdam, and erosion control. Owner/Agency: Corps of Engineers, Vicksburg District

Contract Value: $2, 7 Mil

Level IV – SSHO/Supt. Jefferson Parish, LA Project Description: Project consisted of demolition, earth

work, steel sheet pile placement, timber and concrete pile driving, concrete work, embankment, asphalt

pavement, grass seeding, traffic control, sewer force main relocation, water main relocation, concrete b ox

culvert, concrete flume, granular embankment, bedding material and other incidental work.

Owner/Agency: Corps of Engineers, New Orleans District Contract Value: $9, 1 Mil

Level IV – SSHO St. Mary Parish, Louisiana Project Description: Project consisted of clearing & grubbing,

84,000 (CY) of levee embankment, 38,000 CY of levee embankment, 140,000 CY clay liner embankment,

314,141 (sy) of geo-textile, 155,100 sy of geo-net, 58,000 sy of geo-rid Owner/Agency: St. Mary Parish

Contract Value: $2, 7 Mil

Level IV – SSHO/Alt. QCM Pumping Station: Bonnet Carré Spillway, Louisiana

.Contract amount: $6,9 Mil Completed: January 1999 The work consisted of clearing and grubbing;

channel, canal, borrow pit and structural excavation; cofferdam installation, levee cons truction; placing

structural back-fill, bedding and riprap; furnishing and driving pre-stressed concrete piles and steel sheet

piling; placing reinforced concrete; installing precast concrete bridge deck units; installing staff gauges;

installing a 60-foot by 30-foot pre-engineered metal building; furnishing and installing structural steel

form suction intakes, trash racks and bulkheads; installing and removing a bypass road; utility

installation; modifications and relocation; fertilizing and seeding; and f urnishing and installing pumps,

motors and appurtenant mechanical and electrical equipment

128 Pinners Point Hayesville, NC 28904

PO BOX 1367 Hayesville, NC 28904-1367

850-***-**** Cell

Email: **********@*****.***

PROJECT LEAD – PROJECT DIRECTION – LEADERSHIP – HONOR AND INTEGRITY –

PROFESSIONALISM – WINNER – FAMILY - SAFETY - QUALITY

Additional Commercial, Light Industrial, Heavy Civil work related projects

My Vertical construction projects range from 3.4 Mil to 23.5 Mil they include SSHO an d QCM

responsibilities for installation of (Parking Garages, Youth Centers, Fire Stations, Fitness Center Bulk Fuel

Storage Farms - Eglin AFB, Jacksonville NAS Mayport, Construction of Heavy Brigade Combat Team (BCT)

complexes, Infantry Brigade Combat Teams, Combat Aviation Brigade Headquarters addition, Information

Technology Switch Building, Military Operations on Urban Terrain (MOUT) Range, To date I have worked

on military construction programs to include 19 projects involving 145 buildings.

My “Horizontal Construction” projects (Approach Lights and Taxiway, Fencing and Walls, Tractor Trailer

Parking, Infra-Structure for Roads and Parking, Decks and Bridges, Utility installation (water mains,

sanitary and storm sewer mains), Coal Fired Electrical Facili ties West Coast (Electrical and Mechanical

Shut-Downs and Retrofit), Natural gas mains, duct bank, copper conductor for electricity and

communications as Superintendent and Quality Control. Nearly 70 million cubic yards of dirt moved

safely, 8,050 miles of pipe has been laid safely, 8,200,000 cubic yards of concrete is in place safely, and

completed three major infrastructure projects in the Southeast and Midwest for USACE and DOT, DOE

agencies 1995-1999

Over 8.1 Million Man-Hours worked without a loss time incident. Mod Rates with companies associated

with are less than the USACE/NAVFAC required rate of 1.0, my avg. calculated rate for construction

projects run (.67) or 33% less than industry standards for heavy civil Construction.

EDUCATIONAL QUALIFICATION:

Biology Major ‘Florida State University” BS. 86’

PROFESSIONAL QUALIFICATION: (IN SAFETY)

Level VI Certified Construction Site Safety Officer, 15 + years’ experience in underground construction

working on water/wastewater, pipeline & pump station and/or underground utilities projects, with 5

years of recent and related military heavy-civil construction project experience.

128 Pinners Point Hayesville, NC 28904

PO BOX 1367 Hayesville, NC 28904-1367

850-***-**** Cell

Email: **********@*****.***

PROJECT LEAD – PROJECT DIRECTION – LEADERSHIP – HONOR AND INTEGRITY –

PROFESSIONALISM – WINNER – FAMILY - SAFETY - QUALITY

Certification

Level VI – SSHO USACE-NAVFAC-AIR FORCE

Construction Quality Control Management (CQCM) USACE-NAVFAC

Certified Asbestos Abatement Supervisor and Contractor

Certified First Aid and CPR w/AED

US Navy Superintendents Leadership School

OSHA 500, 501, 502

OSHA 30/10

OSHA 5600 (Disaster Site Trainer)

Construction Safety Hazard Awareness Course 40 Hrs. for Federal/Government Contractors

Compliant with USACE/NAVFAC (CEU’s) – Training requirements past 16 years. Competent Person Rated

in the following: Excavation, Scaffolding, Fall Protection, Hazardous Energy, Confined Space, Health Hazard

Recognition, Evaluation and Control of chemical, physical and biological agents, Personal Protective Equipment

and Clothing to include selection, use and maintenance.

Military Service

USMC – 1984-1993

CAPT O-3

Additional Info

My additional service included a personally developed Oil Spill Re sponse Plan for

several companies contracted to work for BP Oil Company during the recent Deep

Water Horizon Oil Spill. Also under my guidance as a Safety Director, I developed a

formal Health and Safety Plan for the Government of Haiti. This plan was in r esponse to

several large contracts initiated through the World Bank for site stabilization disaster

recovery operations to support (Green) Operations for the Haitian authorities .

128 Pinners Point Hayesville, NC 28904

PO BOX 1367 Hayesville, NC 28904-1367

850-***-**** Cell

Email: **********@*****.***



Contact this candidate