Mengmeng Zhu
**** **** ****, ******, ******* Mobile: 732-***-****
Email: *********@*****.***
SUMMARY
Industrial & Systems Engineering major over two years working experience in process improvement, production
cost and quality control, data collection and analysis, manpower scheduling, assembly line balancing, layout planning,
production capacities estimation, six sigma training, lean manufacturing, preventive maintenance and inspection,
warranty modeling and simulation, statistical analysis, market forecasting, and customer communication. Strong project
management, team building, and leadership skills.
EDUCATION
Rutgers University, New Brunswick, New Jersey
MS in Industrial and Systems Engineering, GPA 3.64, Sep 2011 - present
Rochester Institute of Technology, Rochester, New York
Complete coursework in Industrial and Systems Engineering, GPA 3.67, Sep 2010-May 2011
Nanjing University of Technology (NJUT), Nanjing, China
B.S. in Industrial Engineering, GPA 86/100 (Rank 1/72), June 2008
WORK EXPERIENCE
Xueda (Nanjing) Information Technology Co., Ltd
Consultant, November 2009 - August 2010
Analyze feedback data from media platforms, do quantitative analysis to model customer feedback, and assign
advertising appropriation to each media placement in the next quarter.
Forecast customer demands with cooperation of marketing department based on previous database and align the
work with goals and strategies of the organization.
Participate into individualized planning based on customer's requirement and ensure alignment of other departments.
Allocate monthly assignments to other team members based on their skills and competency.
HannStar Display (Nanjing) Corp, Greater China
Industrial Engineer, July 2008 - November 2009
Use standard cost control method to compare monthly input-output situation of material cost difference, manpower
cost difference, and variable manufacturing overhead, and maintain SAP data to ensure on schedule delivery and
standard material usage.
Estimate production capacities of each model based on standard cycle time and analyze inventory capacity to ensure
safety stock.
Determine necessary manpower requirements based on production capacities and revise when necessary.
Use CAD to plan the layout of the fabrication that includes equipment, materials, and work force flow.
Identify, analyze and continuous improve bottleneck units, which include standard Operating Procedure (SOP)
assembly line balancing rate, productivity improvement, materials delivery and path, equipment layout planning,
manpower allocation, waste reduction, downtime reduction and coordinate with other departments to resolve
bottlenecks.
Evaluate value of losses, which mainly includes materials and utilities, and ask for compensation from supplier or
related departments.
Cooperate with quality, materials and manufacturing department to ensure implementations of production process,
and apply statistical quality control method to control manufacturing process.
Track and summarize KPI from each department, and work out with related departments to ascertain reasons if
actual values have not achieved goal values.
Provide the technical support to the implementation of new model.
Assess potential risk of each production line, use FMEA method to find effects based on failures and get optimized
solutions to potential risks.
Nanjing Pudi Building Materials Industrial Sensing Co., Ltd
Engineering Intern, January 2007 - January 2008
Liaise and participate work with suppliers and technical translation and interpretation for the western engineers.
Report daily and monthly productivity performance, identify and report the risk of current process to the manager.
Track daily commodity cost, currency, and compare with the previous cost to align with cost reduction.
METRO Supermarket (Nanjing) Logistics Distribution Centre
Supply chain summer Intern, June 2006 - August 2006
Coordinate communications between distribution center, suppliers and other departments.
Summarize the monthly performance of suppliers and report to manager.
Mengmeng Zhu
8303 Hana Road, Edison, NJ08817 Mobile: 732-***-****
Email: *********@*****.***
Ensure accuracies of daily input and output data of warehouse.
RELEVANT COURSES
System Reliability Engineering I & II Design and Analysis of Experiments
Statistical Quality control Quality Management
Linear Programming Nonlinear & Integer Programming
Production Analysis Life data Analysis
PROJECTS
Optimization of virtual drilling function of Scapula(by VTK, ITK and FLTK), 12/2012 - present
Develop the optimized drilling function on the top of Scapula and simulate the drilling process(programmed by
C
Reliability Measurement and Analysis of Motor Vehicle System, Spring 2012
Analyze reliability block diagram of the overall vehicle system and develop the optimized reliability distribution
(model) for each sub-system.
Measure component reliability based on the means time to failures (MTTF) under accelerated situation and infer
related parameters for sub-system in normal condition base on accelerated factor.
Compute parametric renewal function estimation and analyze availability under renewals.
Estimate the optimal preventive replacement cycle using block replacement policy and age replacement policy
Compute and compare warranty costs based on renewal function and failure cost of each component.
Analysis of Lymphoma/Leukemia Data (programmed by SAS), Spring 2012
Use the log-rank test of equality across strata, a non-parametric model for the categorical variables, and Cox
Proportional Hazard regression, a semi-parametric model for the continuous variables to find out the significant
predictor in the model.
Model building, comparing different predictor candidates and finding out the optimal model for
Lymphoma/Leukemia Data.
Coffee Machine Reliability Analysis(simulated by Arena), fall 2011
Analyze the working process of coffee machine, and develop the optimized reliability model of each sub-system by
Minitab.
Calculate the reliability and availability of each component base on the mean time to failures (MTTF).
Use Markov process to solve the reliability function by assuming a repairable system.
Make improvements and increase system reliability on the current system by adding the parallel elements to the
weakest sub-system of coffee machine.
Simulate the working process.
Inventory Routing for Beverage Distribution (programmed by Matlab), Spring 2011
Formulate the beverage distribution model, which has to consider the numbers of nodes, trucks capacities,
customers demands, and shortest route.
Use Heuristic Algorithm to solve the distribution model and obtain the specific load and route for each truck.
Tabulate the time window for the beverage company based on the average speed of each truck on the estimated
traffic condition, service time of each customer, and unexpected occurrence dealing time.
COMPUTER SKILLS
Progamming: Visual Basic, C++
Statistics: Base SAS in Windows, R, Minitab, SQL, Excel.
Engineering: SAP, ERP, ARENA, AutoCAD, AMPL, Solidworks, Proplanner, Flexsim, FeatureCAM.
Others: MS Office, MS Visio.
ACCOMPLISHMENTS
Excellent Graduate of NJUT (1 out of 72)
National Lizhi Scholarship (2 out of 72)
Government Scholarship of Jiangsu Province (1 out of 72)
Award for best overall student by NJUT (Every Semester)
Corporation Merit of Six Sigma Financial Benefits (HannStar Display (Nanjing) Corp, Greater China)
National Outstanding Consultant (Xueda Information Technology Co., Ltd)