Post Job Free
Sign in

Project Manager Engineer

Location:
Columbia, SC, 29204
Posted:
April 06, 2013

Contact this candidate

Resume:

MAHABOOB BHASHA.SHAIK

S/O OF M SUBHANI SHAIK PRESENT ADDRESS

Email- HYPERLINK "mailto:abq0vg@r.postjobfree.com"

abq0vg@r.postjobfree.com 2921,Pruitt Drive

Columbia-29204

Mobile; 803-***-**** South Carolina

USA.

CAREER OBJECTIVE

To attain a responsible position in HVAC Engineering Projects to contribute

my best for organizational growth and in the process, enhance my skills for

self-growth.

EXPERIENCE PROFILE

Worked as Asst. Manager (Projects) in ABS Aircon Engineers(p) Ltd.

Bangalore, INDIA From March 2012 to Feb' 2013.

Worked as a SR PROJECT ENGINEER in COMFORTLINE HVAC SYSTEMS

(P) LTD, HYDERABAD,INDIA from FEB' 2010.

Worked as a GENERAL FOREMAN in HAJJ Terminal of king Abdul Aziz

International Airport, JEDDAH, K.S.A under safari company limited

from12th AUG 2006 to 23rd OCT 2009.

Worked as a HVAC Site Engineer in Daikin Air Conditioning India pvt ltd,

secunderabad, INDIA From 2003 to 2006.

Worked as a Site Engineer in Comfort line systems(p) ltd (Dealer

of carrier air conditioners) Hyderabad, INDIA from 1999 to 2003

Worked as a Supervisor in service center of Vighneshwar Air

Conditioning Pvt Ltd (BLUE STAR AIRCONDITIONING SYSTEMS DEALER),

Mumbai, INDIA from 1996 to 1999.

EDUCATIONAL QUALIFICATION

TECHNICAL : Completed 3 Yrs Diploma in Mechanical Engineering

With 76.1% from MBTS GOVT Polytechnic, Guntur, A.P,

INDIA

ACADEMIC : Passed S.S.C. Exam, secured 84% From Board Of

Secondary Education.

ADDITIONAL TRAINING

1) Completed three months Practical Training in Air Conditioning

Projects

Consisting of Theory & Practical with CARRIER, Hyderabad. INDIA

Heating Ventilation and Air Conditioning (HVAC) Design Training.

Completed three month training in Design, Erection, Maintenance &

Estimation of Air Conditioning and Ventilation with

TECNOLCO institute of HVAC Nampally, Hyderabad. INDIA

Training Contents

E-20 Form, ASHRAE / SMACNA Standards, Window A/C, Split A/C.(Duct able /

Non-Duct able), Package A/C, Duct Designing (for Residential Complex and

Villas), Ventilation, Chiller Design

Plumbing / Fire Fighting, Tendering, Estimation & B.O.Q.

COMPUTER KNOWLEDGE

Operating System : Windows 95, XP.

Office Automation : Ms-Office (Word, Excel, PowerPoint).

Designing Software : AutoCAD, GIS,Primavera

HVAC : AutoCAD, HAP, BLOCK

LOAD

CHVAC, DUCT &

PIPE SIZER

Fastest Data entry operation with High speed & accuracy.

Basic knowledge of computer hardware and maintenance.

PRESENT PROJECTS

1. SCHOOL OF LIFE SCIENCES BUILDING (UNIVERSITY OF HYDERABAD)-

714 HP TOSHIBA VRF Project.

81 individual rooms air conditioning with TOSHIBA VRF consisting of

individual ducting with 24 G GI sheet and Plenum with 18 g as per IS 576.

Total 140 no's of duct able indoor units

Total 17 circuits with a diversity factor up to 130%.

115 TONS DX SYSTEM FOR AUDITORIUM & SEMINOR HALL .

80 TONs DX System for AUDITORIUM and 35 TONs DX System for SEMINOR HALL

consisting of AHU'S and Condensing Units.

Individual ducting with 24, 22 and 18 G GI Sheets.

2. COMMERCIAL BUILDING FOR RAMKEY INFRASTRUCTURE LTD in FINANCIAL

DISTRICT at NANAKRAMGUDA, HYDERABAD.

333 Tons X 4 no's of air cooled chillers, 5 Primary pumps and 6 Secondary

Pumps.

36 no's of 17,500 to 24,000 Cfm ahu's along with VFD'S for individual

floors.

27 no's of Ceiling Suspended units for Lift lobbies.

Fresh air and exhaust through individual ducts & ahu's.

Basement Ventilation for car parking with jet fans & Axial Fans.

PREVIOUS PROJECTS

PRATHIMA BUNGLOW, Narsingi, Hyderabad

Hp Mitsubishi Heavy Industries VRF SYSTEM for residential purpose with duct

able indoor units, cassettes and High wall splits.

2. AGARWAL HOUSE, MLA Colony, Hyderabad

32 Hp Mitsubishi Heavy Industries VRF System for residential purpose

with Cassettes, High wall splits

with a working diversity of 130%.

3. ECI INFRASTRUCTURE LIMITED, Hyderabad

250 HP Toshiba VRF System for official purpose with all Duct able

indoor units.

APOLLO CANCER HOSPITAL, Hyderabad

666 Tons closed loop Chilled water system with AHU'S and duct able

Fan Coil Units.

Duties & Responsibilities

- Detailed Study of Specification, Drawings, Scope of Work and Applicable

standards.

- Preparation of Construction Drawings (Shop Drawings) and Submittals.

- Preparation of work Schedule & Mobilization of technicians team at site.

- Estimation of Tools, Hardware and Items to install as per approved

Drawings & submittals.

- Sending site materials request to purchase department for Purchase.

- Checking of builders work drawing for the openings.

- Installation of HVAC Equipments, CHW Pipes, Air Ducts and Controls.

- Participate in team meeting; Carry out periodic reviews of construction

activity; report to Project Manager any variance between the work

constructed & the design intent, Present alternative solution if problem

arises.

- Preparing handing over documents with Testing & Commissioning documents

as built drawing and Operation & Maintenance manuals.

STRENGTH:

Excellent Communication and personal relationship skill, fluent in

English, Fast Learner & Handling Challenging situations.

PERSONAL INFORMATION

Date of Birth : 28th May 1976

Marital Status : Married

Nationality : Indian

Passport No. : F 5858484

Expiry date : 22/12/2015.

Languages Known : English, Hindi, Telugu and Urdu.

I hereby declare that the above mentioned information is correct up to

My knowledge & belief.

Date :

Place :

(Shaik Mahaboob bhasha)



Contact this candidate