CURRICULUM VITAE
OF
VIKRAM.KOKA
Email: *************@*****.***
Mob: 91-901*******
Nationality: INDIAN
Date of Birth: 05 Jan 1983
Designation: Q.C. INSPECTOR
Total Work Experience: 5 Years
PROFESSIONAL PROFILE:
SUMMARY OF EXPERIENCE:
> Having 5 years of experience in field of Structurals, Piping, Storage
Tanks, Static Equipment & Castings.
Education Qualification : B.Tech in Mechanical Engineering
Technical Qualification : NDT LEVEL II (PT, MPT, RT, UT)
Computer Skills : AUTO CAD & MS
Office
Details of experience:
Organization : LLOYDS REGISTER ASIA ( UNDER
CONTRACT BASIS)
Designation : Q.C.INSPECTOR (THIRD PARTY).
Duration : DEC 2011 till date
> Vendor Inspections Performed:
Client : BHARAT HEAVY
ELECTRICALS LIMITED (BHEL)
Projects involved
. NTPC Tapra Power Plant
. Elena Power-Nasik
. Elena Power -Amaravathi
. Tishreen Power Plant -Syria
. SPL Surana Power-II
. MatriShri Usha Jaiswal Mega Power Plant
. Haldia Power Plant
. Maruti Suzuki 70MW Power Plant
. ONGC OPAL DAHEJ-II
Description: Fabrication of Deaerator Storage Tanks, Deaerator Heaters,
High pressure heaters, Low pressure heaters for Thermal Power Plants.
Activities performed:
. Material identification as per QAP and review of Material Test
Certificates.
. Longitudinal/circumferential weld joint fit-up examination as per
relevant drawings and checking orientation of seam on shell
course and joint alignment.
. Witnessing welder qualification tests.
. Review of W.P.S & P.Q.R
. Witnessing back chipping / gauzing with penetrant test to ensure
defect free welds.
. Witnessing nozzle fit-up examination to check elevation, tilit,
projection as per relevant code, drawings & QAP.
. Heads forming inspection as per relevant drawing, code and QAP.
. Ensuring welding is carried out as per relevant weld detail drawing
and WPS.
. Ensuring weld sizes as per relevant weld details in the drawing.
. Witnessing mechanical tests in laboratories as per supplementary
requirements.
. Reviewing NDT reports, pressure test reports, surface
cleaning/painting reports.
. Reviewing Post Weld Heat treatment / normalizing charts as per QAP,
Drawings and code.
. Final dimensional inspection of pressure vessels as per relevant
latest revised drawings and witnessing final NDE tests (Penetrant
Test, Magnetic particle test, RT, UT).
. Review of Radiographic Films evaluation and interpretation.
. Preparing final inspection release note after complete fabrication
before dispatch.
Client : BOC INDIA LTD,
KOLKATA
Projects involved : MRPL Phase-III Poly
Propylene complex (MRPL)
HPCL,
Visakhapatnam
Meramandali,
Orissa
Description : 50 KL Liquid Nitrogen
Storage Tank
75 KL Liquid
Nitrogen Storage Tank
30 KL Liquid
Nitrogen Storage Tank
Activities Performed :
. Material identification as per QAP and review of Material Test
Certificates.
. Longitudinal/circumferential weld joint fit-up examination as per
relevant drawings and checking orientation of seam on shell
course and joint alignment.
. Witnessing welder qualification tests.
. Review of W.P.S & P.Q.R
. Witnessing back chipping / gauzing with penetrant test to ensure
defect free welds.
. Witnessing nozzle fit-up examination to check elevation, tilit,
projection as per relevant code, drawings & QAP.
. Heads forming inspection as per relevant drawing, code and QAP.
. Ensuring welding is carried out as per relevant weld detail drawing
and WPS.
. Ensuring weld sizes as per relevant weld details in the drawing.
. Witnessing mechanical tests in laboratories as per supplementary
requirements.
. Reviewing NDT reports,, pressure test reports, surface
cleaning/painting reports.
. Reviewing Post Weld Heat treatment / normalizing charts as per QAP,
Drawings and code.
. Final dimensional inspection of pressure vessels as per relevant
latest revised drawings and witnessing final NDE tests (Penetrant
Test, Magnetic particle test, RT, UT).
. Review of Radiographic Films evaluation and interpretation.
. Issuing Inspection release note.
Client: Coromandel International Limited, Visakhapatnam
Project: Ammonia Pipe Line Decommissioning and Recommissioning
Code of fabrication: ASME B31.3
Activities performed:
. Material Identification with their test certificates for compliance
with relevant specification and drawing requirement.
. Ensuring that relevant WPS, PQR, WPQ are in accordance with
stipulated code requirements.
. Witnessing D.P.T on surface area of all inch valves weld joints
during renewal and blinding.
. Witnessing D.P.T examination on entire surface area of anchor
support plate to pipe fillet weld joints.
. Witnessing D.P.T. on entire surface area for 3 inch line
replacement portion weld joints.
. Reviewing R.T. films for the butt joints.
. Witnessing Pneumatic test for both the 3inch lines.
CASTING EXPERIENCE:
Client: Indian Oil Corporation Ltd, Panipat,
Thermax Ltd, Pune,
Relaince Industries Ltd.
Supplier: Hastalloy India Ltd, Anakapalle, Visakhapatnam.
Projects involved: IOCL Panipat Refinery Plant 9060,
PG0513 GGSR, Bhatinda,
PTA-5, PTA-6 & PVCVCM DBN Project, Dahej.
Description: Inspected Refinery castings such as Ladder side members,
Intermediate
Tube sheets support brackets, cast pin and pink
keepers.
Activities performed:
Scope of inspection as per QAP
Identifying test bars with surveyor hard punch
Reviewing Chemical composition of the material for compliance against the
material specification.
Witnessing mechanical testing and reviewing results
Carrying out visual and dimensional inspection
Witnessing DPT for the offered quantity
Reviewing radiographs
Witnessing Positive metal Identification (PMI) for castings
Organization : SREE THANDAVA LAKSHMI ENGG.
WORKS
Designation : QA/QC ENGINEER
Duration : Nov 2009 to Dec 2011
> Worked as QA/QC Engineer for Static Equipment and Structural
. fit up, weld visual
. Qualification of welders
. Coordinating with welders & fitters time to time.
. Preparing Material flow chart as per drawing.
. Offering job to third party inspectors.
. Witnessing NDT tests and coordinating with NDT consultants.
. Ensuring all radiography is performed for butt joints as per
drawing.
. Preparing all documents such as log sheets, stage inspection
reports, Final dimensional reports material flow charts, N.DT
consolidated reports etc.
. To check all material certificates are endorsed with material flow
charts or not.
. Finally contacting Third party inspector for issuance of
Inspection release note.
Organization : SRUJANA ENGINEERING WORKS,
VISAKHAPATNAM
Designation : SITE ENGINEER
Duration : MAY 2008 to OCT 2009
Worked as QA/QC Engineer for Static Equipment and Structural
. fit up, weld visual
. Qualification of welders
. Coordinating with welders & fitters time to time.
. Preparing Material flow chart as per drawing.
. Offering job to third party inspectors.
. Witnessing NDT tests and coordinating with NDT consultants.
. Ensuring all radiography is performed for butt joints as per drawing.
. Preparing all documents such as log sheets, stage inspection reports,
Final dimensional reports material flow charts, N.DT consolidated reports
etc.
. To check all material certificates are endorsed with material flow
charts or not.
. Finally contacting Third party inspector for issuance of Inspection
release note.
Personal Information:
Name : VIKRAM KOKA
Father's Name : K.N.K.KUMAR
Gender : Male
Marital Status : Single
Languages Known : English, Hindi, Telugu & Tamil.
Date of Birth : 05-01-1983
Pass port number : E 6756990 Valid upto Nov 2013
Permanent Address : S/o. K.N.K.Kumar,
Drno.45-49-14/2,
Flatno.502, Siddhi enclave,
Abidnagar,
Visakhapatnam-530016
Andhra Pradesh, India
DECLARATION
I swear that the details furnished above are true to the best of my
knowledge and i will discharge my duties to the entire satisfaction to my
superiors and to the organization.
(Vikram.K)