LOGANATHAN.N
Mobile: +971-********* ~ E-Mail: ***************@*****.*** ~
********@***********.***
Senior Assignments
Welding Inspection / Quality Control
CAREER PRECISE
< Astute Leader with 13+years of experience in Welding Inspection, Quality
Assurance, Quality Control and Team Management.
< Presently associated with ABS Group Inc., Abu Dhabi-U.A.E. as
Welding/Piping Inspector (PMC).
< Familiar in using International codes, standards and specifications like
ASME, ASTM, API, AWS Standards; Worked in various oversees location in
the Middle East and India.
< Proficiency in selection & application of welding consumables for various
material combinations.
< Experienced in Fabrication, Installation, Testing and Pre-Commissioning
related to pipelines, station piping, tanks, pressure vessels, boilers,
structures, etc.
< Experienced in the inspection of following:
V Piping and fitting materials of various grades and pipeline
valves as per API 6D, station piping valves as per API 598 and
the hydro and pneumatic testing.
V Welded/fabricated piping & structural items, structural steel
materials of various grades.
< Splendid questioning and listening skills with ability to analyse
responses, understand clients' needs and focus on quality, precision &
punctual delivery of results.
CORE COMPETENCIES
Welding Inspection
< Carrying out the inspection of base metal preparation, welding
consumables, pre-heating, in process welding, visual weld check, etc.
< Interfacing with other departments during fabrication & installation
process to resolve any welding and inspection related problem.
Fabrication Operations
< Studying drawings, plans or patterns of structures to be made as per
requirements.
< Preparing fabrication drawings for manufacturing various components.
< Generating wiring diagrams / schedules and studying the bill of material;
coordinating with customers for various operations like fabrication,
machining, etc.
Quality Assurance & Control
< Devising and implementing company Quality Assurance Programme in
compliance with company requirements; overseeing the documentation of
test results and preparing the data in the form of a graph or chart.
< Focussing on the optimisation of process parameters, initiating process
improvements for achieving productivity targets.
Team Management
< Supervising, managing and supporting the Quality Assurance Personnel.
< Providing administrative and technical direction to all Quality Control
Personnel including personnel administration, resolution of technical
problems, development / approval of in-house training, etc.
CAREER SCAN
Since Feb'12: ABS Group Inc., Abu Dhabi-U.A.E. as Inspection Engineer (PMC-
TPI)
Jun'08-May'11: Velosi Certification LLC, Qatar as Inspection Engineer-
Welding (TPI)
Significant Highlights:
< Dexterously handled the activities like:
V PQR, welder's qualification tests and preparation of PQR
records and WQT certificates.
V Stage wise inspection before, during and after fabrication.
V Review of radiographic films.
V UT, MPI, DPI, hardness, PWHT and review of test reports.
V Weld repair as per client approved WPS.
V Review of hydro test packages.
V Restoration of Piping systems after completion of all hydro
testing activities
V Hydro testing, pneumatic testing as per client approved
procedures.
V Verification of mechanical completion package / inspection
record books.
V Issue of non-conformance reports & verification of corrective
and preventive actions.
V Liaison with Client Inspectors for inspections of hold and
witness point.
V Holiday testing, impact tests, hardness testing, salt and
chloride contamination testing, and cross adhesive tests, DFT
& WFT checks.
< Successfully inspected:
V Tie-In and hot tap welding activities.
V All incoming materials and reviewed the test certificate as
per code.
V Piping materials as per isometric drawings.
V Heavy structural fabrication, welding and erection as per AWS
D1.1.
< Prepared inspection reports, quality control procedures, method
statements, daily welding reports & welding pipe book, line walk and
punch list before hydro test.
< Shouldered the responsibility of mobilizing the manpower, materials and
equipment and executed the assignments on schedule.
< Performed final inspection prior to handover to clients.
< Witnessed surface preparation, DFT checks, adhesion tests, holiday tests,
etc.
< Advised the project painting supervisors on the coating system and
monitored the mixing and application of the paint in accordance to the
quality standards.
< Developed the application methods for protective coating of storage
tanks, structural steel and piping systems.
< Enhanced the quality management by constant governing and improvisation
of quality policy and QCP.
< Performed Root Cause Analysis of defects and offering periodic training
for inspection to personnels and workers.
< Reduced incidence of defects by employing skilled personals, by
performing periodic survey of quality implementation as per recommended
codes and specification.
PRECEDING TASKS
May'07-Apr'08:
M/s Hyundai Heavy Industries Co. Ltd., Kuwait as QA/QC Engineer
(Mechanical)
Jun'06-Apr'07:
NBTC WLL, Kuwait as QA/QC Engineer (Welding / Piping)
Oct'04-May'06:
M/s Tech Sharp Engineers Pvt. Ltd., India
Joined as QC Engineer (Welding / Piping) and rose to the post of QC
Engineer
May'99-Oct'04:
M/s Kitana Industries, India (NDT Division) as NDT Inspector
TECHNICAL QUALIFICATIONS
< CSWIP-3.2 Senior Welding Inspector (Cert No.67985).
< B GAS Painting Inspector Grade 3 (Cert. No. 36060).
< ASNT Level-II in RT, UT, MT & PT.
SCHOLASTICS
1999 Diploma in Mechanical Engineering from State Board of Technical
Education, Chennai, Tamil Nadu.
1997 12years Secondary Education with Maths and Physical Science, Tamil
Nadu State Board Syllabus.
PERSONAL PROFILE
Date of Birth: 7th Jul'1980
Address: 66, Thondarepettai, Kadalur Village and Post, Cheyyur Taluk,
Kancheepuram District, Tamil Nadu-603305
Passport No.: K 0354330 ; Date of Expiry: 08th Feb'22
Driving License: Qatar-280********, Validity-24th Jan'14; U.A.E-
730677, Validity-12th Mar'22
Annexure
PROJECTS HANDLED
At ABS Group Inc., Abu Dhabi-U.A.E. as Inspection Engineer (PMC-TPI)
< Project: Ruwais Refinery Expansion Project (EPC-2) and Associated
Refining Units
Client: Takreer (Abu Dhabi Oil Refining Company)
At Velosi Certification LLC, Qatar as Inspection Engineer-Welding (TPI)
< Project: Epic of Pipeline Gas Supply for Mesaieed Consumers
Client: Qatar Petroleum
< Project: Pipe and Vessel Nozzle Modification
Contractor: Danem Engineers
Client: Qatar Petroleum
< Project: Rehabilitation of LPG Tank T1 7 T2 at NGL Mesaieed
Client: Qatar Petroleum
Contractor: Descon Engineering
< Project: EPIC for various Platforms at ARAB-D Plant
within Dukhan Fields-GC 08102500
Contractor: AYTB
Client: Qatar Petroleum
< Project: New Doha International Airport
Contractor: Leo Steel
Client: New Doha International Airport
< Project: New Doha International Airport
Contractor: Gulf Steel
Client: New Doha International Airport
< Project: EPIC of Consolidated Gas supply between Mesaieed and
Raslaffan Area (GTC
07/106/ED)
Client: Qatar Petroleum
Contractor: Fernas Construction Company
< Project: Epic of Pipeline Gas Supply for Mesaieed Consumers
Client: Qatar Petroleum
< Project: Epic of Multi Product Pipeline from QP Refinery to
Doha Depot Contract
No.:GC/07/1005/ED
Contractor: Punj Lloyd
Client: Qatar Petroleum (Refinery-Mesaieed)
Deliverables:
V Positioned as a Third Party Inspection Engineer-Welding
and checked & reviewed the scope of work, method
statements & procedures prior to the execution of the
work.
V Evaluated welders qualification certificates & ID's in
conformity with the approved WPS requirement, drawings,
specifications, procedure & standards.
V Observed hydro tests, air flushing, pneumatic test,
witness welders qualification testing and pump alignment.
V Ensured that the right equipment to be used in the
specific job & ensured that the calibration was
performed.
V Conducted inspection of materials check and reviewed the
MTC (Material Test Certificate) vendor's approval
mechanical composition and prepared reports.
V Checked the usage, issuance and storage of welding
consumables and evaluated the surface preparation &
weather condition prior to any coating activity.
V Ensured that the coating activities should be performed
in accordance with the manufacturer's recommendation &
standards.
< Project: EPIC for 3 Additional Slots at 26 Gas Lift Manifold
Stations in Dukhan-GC 07102600
Contractor: Fernas Construction Company
Client: Qatar Petroleum
Deliverables:
V Oversaw the valve testing low/high pressure seat tests
and high pressure shell test as per API 598 and client
approved procedures.
V Critically reviewed the Valve Testing Certificates.
< Project: EPIC of Fuel Gas Supply to QNCC and GCC-1 Plants at
UMM-BAB - GC 07102800
Contractor: Fernas Construction Company
Client: Qatar Petroleum
Deliverables:
V Oversaw the valve testing low/high pressure seat tests
and high pressure shell test as per API 598 and client
approved procedures.
V Critically reviewed the Valve Testing Certificates, NDT
Reports and Pipe Books.
At M/s Hyundai Heavy Industries Co. Ltd., Kuwait as QA/QC Engineer
(Mechanical)
< Project: Crude Export Facilities at STF, NTF and MAA
Client: M/s Kuwait Oil Company (KSC)
At NBTC WLL, Kuwait as QA/QC Engineer (Welding / Piping)
< Project: Enhancement of Crude Export Facilities
Client: M/s Kuwait Oil Company (KSC)
At M/s Tech Sharp Engineers Pvt. Ltd., India as QC Engineer
< Client: (Gea India Ltd.), Lurgi-Germany
Project: (Oil & Gas) Plenum Assembly Structure for Air Fin
Coolers
< Client: M/s Nuclear Power Corporation of India Ltd., Kalpakkam
Project: Replacement of Feeders in Unit#1 (PHT System); Replacement and
Modification of
Carbon and Alloys Steel Piping