Post Job Free
Sign in

Engineer Electrical

Location:
San Jose, CA
Posted:
November 21, 2012

Contact this candidate

Resume:

Title:Director

abpvjk@r.postjobfree.com

Document

Source below

NAME:,

ADDRESS:

ADDRESS2:

CITY:

STATE: CA

ZIP:

CANDIDATE ID: 2908166

US CITIZENSHIP:

EDUCATION:

EXPERIENCE: 0

WILL RELOCATE: No -

JOB WANTED:

RATE NEEDED:

TELEPHONE: 408-***-****

EMAIL: abpvjk@r.postjobfree.com

HOMEPAGE:

HOTTEST SKILLS: engineer, autocad, vms, bond, liability, tax

REVISION: 08-SEP-02

NAME: YAHYA MEDLIJ

ADDRESS: 768 S. GENEVIEVE LANE

CITY: SAN JOSE

STATE/PROVINCE: CA

ZIP/POSTAL CODE:

COUNTRY: USA

EMAIL:

PHONE: 408-***-****

CANDIDATE ID: NA

CITIZENSHIP: US

Citizen

EDUCATION: Not Entered

EXPERIENCE:

Not Entered

WILL RELOCATE: Not Entered

RELOCATION INFO: Not Entered

JOB WANTED: Any

RATE NEEDED: Not Entered

HOMEPAGE:

COMMENTS:

HOTSKILLS:

YAHYA MEDLIJ

768 S. GENEVIEVE LANE

SAN JOSE, CA 95128

^408-***-****

650-***-****

abpvjk@r.postjobfree.com

Concept Systems Design, Inc

.

Fremont, CA

2/96

- 12/96Electrical Engineering Manager, R&D Completed the design

and implementation of the electrical control system for the single

wafer Epitaxy machine. Duties included the establishment of an

electrical engineering group. Electrical control system definition and

design, including all components selection and purchase. Generated

schematics and wiring harnesses. Established the engineering lab and

completed the electrical system for the first prototype. Responsible

for the development of a revolutionary six zone RF induction heating

system.

Applied Materials, Inc

. Santa Clara, CA 9/94 - 2/96Electrical

Engineering Manager

Led the design and implementation effort of the

electrical control system for the CMP (Chemical Mechanical Polishing)

machine. Duties included the establishment and leadership of an

electrical engineering group. Electrical control system definition and

design, including all components selection and purchase. Program

management for the build of Alpha, and Beta machines. Directed

engineers and technicians on the build of the CMP machine. Established

the CMP division network server.

Advanced Cardiovascular systems / Guidant Corp

. Santa Clara, CA 11/93

- 9/94

Project Engineer Responsible for manufacturing equipment

design, used in the build of catheters for the (PTCA) coronary

angioplasty procedure. Electrical controls design of solvent bonder,

automated stent measurement system, catheter drill machine, balloon

blower, and balloon pre-necker. Trained in Good Manufacturing

Practices (GMP) and familiar with FDA requirements and procedures for

medical equipment.

Conner Peripherals

. Milpitas, CA 4/93 - 11/93Electrical Engineer

Responsible for the design and implementation of the high volume disk

media sputter machine electrical control system. Duties included

project management and planning, schematics generation, components

selection and purchase, assembly supervision, debug, test, product

qualification, and introduction to manufacturing. Strict adherence to

NFPA 79, NEC electrical code, Class 10, and 100 cleanroom

requirements. Led successful Interface with third party and Milpitas

city inspectors.

Digital Equipment Corporation

. Cupertino, CA 10/87 - 10/92SeniorElectrical Engineer

Responsible for the design, development and

implementation of in-house custom equipment for the manufacturing of

Multi-Chip Modules, including equipment /Vender selection and

modification of commercial equipment to meet process requirements.

Carried projects from concept through manufacturing meeting time

schedule. Designs incorporating VAX's, PC's, Programmable logic

controllers, control instruments, and CCTV equipment. Designed

automated adhesive dispense and polymer handling equipment. Provided

process development, and engineering support of manufacturing in a

class 100 cleanroom environment. Projects included various automated

assembly, semiconductor, and test equipment such as Multi-chip module

tester, adhesive dispense, automatic heat tacking, solder repair

station, lamination press automation, bare die tester, plating

sinks/wet decks, automatic measurement system.

Textron Corporation

. Micromatic Operations. Holland, MI 3/87 -10/87

Controls engineer Design of honing and die casting industrial controls

used for automotive manufacturing equipment. Strict adherence to the

auto industry specifications. Integrated and developed software of

operator interface terminals to PLC's

Automated Semiconductor Inc

. National Semiconductor subsidiary 6/84 -

3/87

Santa Clara, CA Senior Electrical Engineer Responsible for the

development and manufacturing of leadframe plating equipment, tapers,

and cutters. Electrical designs incorporating programmable logic

controllers, and motion control systems. Designed the electrical and

pneumatic controls, performed component/vendor selection and

qualification, including software development. Performed equipment

start-up, testing, and qualification before shipment. Interfaced

between engineering and manufacturing. New controls design reduced

labor intensive manufacturing cost by 20% and increased reliability by

50%. Participated in equipment installation, debug, and test at

customer sites.

EDUCATION

UTAH STATE UNIVERSITY

LOGAN, UTAH BS IN ELECTRICAL ENGINEERING 1984

COMPUTER SKILLS

FAMILIAR WITH A WIDE VARIETY OF SOFTWARE PACKAGES, AND ENGINEERING

TOOLS

OPERATING SYSTEMS WINDOWS 95, WINDOWS-NT, VMS

LANGUAGES LADDER LOGIC, C. CAD: AUTOCAD, UNIGRAPHICS.

.



Contact this candidate