Posted/Modified on: **/**/****
Resume Title:
Troy Courville
Contact e-mail:
************@*******.***
Industry:
Oil & gas
Desired Location:
anywhere
Willing to Relocate:
Yes
Desired Salary:
$46/hr - $60/hr
Troy A. Courville
Sr.
524 Valverda Road, Maringouin LA. 70757
P.O. Box 100
Cellular Ph 225-***-****
Email Address ************@*******.***
TWIC (Transportation Worker Identification Credential)
I am a professional seeking a position for a company that will use my knowledge and
abilities for outstanding performance, leadership and safety.
I have over 27 years in the
boilermaker mechanical, pipefitting and steel erection field. 12 years experience with
maintenance and/or capital project management in a refinery or chemical plant. 10 years
experience managing or supervising contractors (multiple craft disciplines). 5 years as a
refinery/chemical plant craftsman. I have P6 experience .
Employment History
PCS
-(Professional Construction Services, LLC)
P.O. Box 510 Ripley, WV 25271 Phone 304-***-****
Marathon Oil Detroit Michigan Refinery
Planner/Coordinator, P6 Scheduler
June 2010
till Oct .2012
Jacobs Engineer Turnaround Manager, Dow Chemical Plaquemine, LA.
Conducting Turnaround for the LAC2 Unit Project completed
Turnaround
April 1st 2010-June 2010PCS
-(
Professional Construction Services, LLC) 12/28/2009-03/02/2010
P.O. Box 510 Ripley, WV 25271 Phone 304-***-****
Senior Project Coordinator
-
Marathon Oil, Garyville, Louisiana
ProTech Engineering 09/21/2009
-12/31/2009Contract Administrator
Husky Refinery-Lima Ohio over the IsoCracker and Reformer Units
Job finished ahead of schedule and accident free
Cajun Constructors
11/12/2007-09/16/2009; Site SuperintendentConoco Phillips Refinery
-Belle Chasse, LA.
Vereniums Cellulosic Ethanol Refinery, Jennings, LA.
Rhodia Chemical Plant, Baton Rouge, LA.
Turner Industries
Baton Rouge, LA 06/07-11/07
CHS Project in Laural, MT. Sub-Contract Coordinator
Maintained construction schedule and maintenance report progress to project manager of
Sub Contact personal
Pro Tech Engineering, Inc
. 01/07-03/07; Contract AdministratorSunoco Refinery-South Philadelphia
; Reformer Unit / Units 133*-****-****
Job was completed on time and accident free /Project Cost $525 million this project was
the biggest project that Sunoco Refinery performed at this location.
Star Int
. 08/06-11/06; Citgo Refinery- Chicago Illinois
T/A Superintendent of all industrial trades in the alky unit. . Project Cost $56 million.
Pro Tech Engineering, Inc
. 03/06-05/06; ConocoPhillips Trainer Refinery
Pennsylvania;
T/A Cat Cracker
Senior Coordinator
Conducted work at the FCC Unit, Project Cost $325 million
Pro Tech Engineering, Inc
. 02/06-03/06ConocoPhillips-Bayway Refinery Linden, New Jersey
Senior Coordinator Project cost $185 million
James Construction
11/05 to 02/06
Industrial turnaround superintendent for Air Products in the Valero Plant, Port Arthur,
Texas. Managed all piping and equipment erection. Managed heavy equipment lifts.
Pro Tech Engineering, Inc
. 08/05 thru 12/05Area Mechanical Coordinator
for
Valero South End Turnaround, Delaware City Delaware.
Performance Contractors
05/94 to 2005; Turnaround supervisor,
Supervised all work related to welding. Supervision of heavy lifts, piping, structural
steel and civil, specializing in tank fabrication, servicing of exchangers .
References:
Tom Wireman-Husky Refinery 419-***-****
James Minchew Delta Nooter 618-***-****
Preston Banks Marathon Detroit 313-***-****
Terry Geisler Marathon Detroit 313-***-****
Don French Marathon Detroit -248-***-****
Certifications & Classes
National Center for Construction Education and Research
Boilermaker
Rigging Fundamentals
ACIGs Incident Investigation and Root Cause Analysis Training
Skill Force Training
CPR / First Aid Training; OSHA 10-20 hr
Three rivers safety council
Association of Reciprocal Safety Councils, Inc
OSCA- Occupational Safety councils of America
START (Supervisors Training in Accident Reduction Technology)
Driver Safety & HR Best Practices
Competent Person
Fall Protections; Confined Space for Supervisors; Excavation Trenching Shoring; Assured
Grounding-Ladder-Rigging Inspections;
Scaffold User and Inspection