Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Vail, AZ
Posted:
November 30, 2012

Contact this candidate

Resume:

Ronald (Ron) Kuipers

Email: abpttf@r.postjobfree.com

Address:

City: Vail

State: AZ

Zip: 85641

Country: USA

Phone: 520-***-****

Skill Level: Any

Salary Range:

Primary Skills/Experience:

Proactive Project Manager experienced in managing a variety of construction teams and projects. Successful in creating effective communication between personnel, general contractors and the management team.

Educational Background:

High School Dipolma from Grossmont Junior College, La Mesa CA 1/2001 to 6/1977 (General)

Job History / Details:

Summary

Proactive Project Manager experienced in managing a variety of construction teams and projects. Successful in creating effective communication between personnel, general contractors and the management team.

Highlights

30 Hour OSHA Certified

Building codes and regulations

Preparing RFI's

Blueprint fluency

MS Office proficient

Project budgeting/ cost control

Project Estimating With RS Means and E4Clicks

Review and approval of preliminary and final construction drawings

Assembling submittals

Constructing schedules

Accomplishments

Construct 943rd Medical Facility. Design and construct approx. 2400 SF CMU facility to support 943rd Medical Facility operations. Construction included all facets including site preparation, masonry, steel trusses, steel roofing, Openings, ATFP requirements, electrical, fire suppression, communications, HVAC, MNS, finishes, mechanical yard, landscaping. $729,633.00

Repair (Renovate) JAG Facility Building 2300. Demolish existing office space and construct new JAG courtroom to include offices for visiting attorneys, deliberation room, judge's chambers, all casework for judge's bench, court reporter and witness bench. Provide jury boxes as well as gallery seating. Provide and install all openings, audio visual and communications. Provide and install all finishes, fire suppression, electrical, HVAC. $454,090.00

Construct Addition, Building 75, Davis Monthan AFB. Construct approx. 1900 s/f CMU addition to create additional office space for a secure SKIF/Vault, to include security, secure communications (NIPR/SIPR) fire suppression, HVAC, MNS, all finishes. $560,344.00

Construct CAOC Front Entrance, Davis Monthan AFB. Provide demolition of existing entry, security room and office space. Provide new enlarged CMU entry with storefront, lobby, bullet proof security window/ office, electronically controlled/ card swipe access doors, new office space for command and support staff. $327,477.00

Construct MXG Locker Rooms, Building 4810, Davis Monthan AFB. Provide demolition of existing 6,000 SF hanger bay. Provide all components to construct mens and womens locker rooms with showers, lockers, bathroom facilities to support squadron activities. This included all plumbing, framing, electrical, fire suppression, HVAC, openings and finishes. Infill hanger bay doors and replace with storefronts. Replace all glazing with ATFP rate windows/glass. Provide all power requirements for work out equipment including audio visual. $468,037.00

Construct Predator Parking expansion. Provide 60 vehicle parking lot expansion to include all site preparation, curbing, lighting, paving and striping. $77,710.00

Repair Fire Protection System, Facility 5430, Aircraft Hanger, Davis Monthan AFB. Demolish all existing supply and distribution piping from existing fire suppression system in 2 aircraft hangers. Remove all existing pump equipment. Install a complete High Expansion Foam fire suppression system in new temperature controlled equipment room. Provide all new electrical supply/ transformer and new fire detection systems for 2 hangers. $579,000.00

Construct (ADA) Elevators OSI/CE Admin Building 4300, CAOC Building 74, Community Center Building 4455. Provide all design and engineering to construct 2 each 2 story and 1 each 3 story elevators at existing buildings. This includes al demolition of existing conditions and construction of CMU elevator chases. All supporting infrastructure to be included. $633,633.00

Experience

November 2008 to September 2012

Diversified Maintenance Systems Tucson, Arizona

Project Manager

I was lead on initial site walks, formulated a final SOW (statement of work), estimated the complete project utilizing RS Means and E4 Clicks estimating software, working with architects and drafting personnel, and negotiating the final contract with government civil engineering and contracting. I provided all submittals, RFI's and project schedules. I have a solid background in estimating, MS Project, Outlook, Word, and Excel. The projects I have been associated with have entailed both new construction as well as tenant improvement. I have also been involved with a significant number of civil projects. The magnitude of these projects ranged from approximately 10k to 750k dollars. I have been responsible for up to 11 projects at a time from cradle to grave. During my tenure with Diversified I was responsible for estimating and completing over 27 different projects worth over 8.5 million dollars.

August 2006 to September 2008

US West Builders Tucson, Arizona

Project Manager/ Superintendent

Construction of luxury golf course properties in the 1.3 to 2.3 million dollar range.I was also involved in the reconstruction of historic midtown homes. These projects ranged from 350k to 750k and were from 6 to 18 months in duration

My responsibilities included direct supervision and scheduling of all sub-contractors, permitting, architectural changes and implementation, client interaction and coordinating plan changes with the city government. I worked both in the field as a superintendent and at a home office or my vehicle using my laptop as Project Manager. I was also responsible for the supervision of an assistant superintendent.

May 1998 to March 2006

Caron Construction Edmonds, Washington

General Contractor

Owner Operator

100 percentage referral based business

Specialized in commercial tenant improvements, residential additions and remodels.

Responsible for all bidding, estimating, and invoicing.

Worked closely with clients through all phases of project.

Was involved with all design work including architectural.

Worked closely with all sub-contractors and supervised all work.

Called in all inspection requests and met with all building inspectors for all required inspections.

Was responsible for initiating all change orders and supervising their completion.

Completed final client walk through and inspection.

June 1994 to April 1998

Creative Kitchen and Bath Lynnwood, Washington

Lead Journeyman Carpenter

Lead Carpenter for High end residential Kitchen remodel and additions.

Was "hands on" start through completion of entire project.

Worked closely with designers and clients

Scheduled all inspection requests and meeting with Building inspectors.

Worked with and supervised all sub-contractors.

May 1992 to June 1994

Styren Construction Woodinville, Washington

Heavy Equipment Operator

Utilities installation and plat development

Operated heavy equipment, backhoe, excavator, compactors.

Interpreted blueprints and installed utilities for residential plat development

Installed sewer, storm, and water pipelines.

Installed and hooked up side sewer connections.

Met with building inspectors to ensure code compliance.

July 1989 to June 1992

La Casse Custom Homes Seattle, Washington

Framer/ Carpenter

Was involved from start to finish in custom residential home construction.

Gained experience in blueprint interpretation, foundation forming and pouring, framing, siding, interior finish work.

Worked closely with all sub-contractors

Education

Grossmont Junior College La Mesa, California

High School Diploma General



Contact this candidate