Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Henderson, NV
Posted:
December 06, 2012

Contact this candidate

Resume:

William Neckel

Email: abpt4r@r.postjobfree.com

Address: **** ******* ***

City: Henderson

State: NV

Zip: 89052

Country: USA

Phone: 702-***-****

Skill Level: Management

Salary Range: $100,000

Willing to Relocate

Primary Skills/Experience:

See Resume

Educational Background:

See Resume

Job History / Details:

WILLIAM NECKEL

2544 Woodson Avenue 702-***-****

Henderson, NV 89052 abpt4r@r.postjobfree.com

General Superintendent of Structures (Bridges)

Profile

Knowledge and expertise in the construction of complex, high-profile, and environmentally sensitive projects including cable-stayed bridges, cast-in-place concrete segmental bridges, post-tensioning, coffer cells, drilled shafts, pile driving, major river crossings, and marine work off barges and trestles.

Education/Training:

OSHA 30-Hour; continuing education in equipment operations including cranes, barges, general marine equipment

Experience

Nevada Department of Transportation aaa Harris & Associates 2011 aaa 2012

Senior Construction Manager aaa Bridge across I-15 and 5th Street aaa Las Vegas, NV

aa Project consisted of two end bents and three piers. End bents and piers were founded on 18aa pipe pile closed ends ranging in length from 80aaa to 105aaa long. Pipe fill with concrete after driven to tip elevation.

aa Consultant on construction of super structure which was standard steel girders, total of 4 span with eleven girders each span. Set bearings at each location for steel girders. Contracted to drive pile and erect super structure completed in late September 2012.

Connecticut Department of Transportation aaa Walsh & PCL (JV) 2010 aaa 2011

General Superintendent aaa Bridge Project aaa New Haven, CT

aa Project consisted of four main piers, two across main channel and two anchor piers. Piers founded on drilled shafts. The span across main channel and span to anchor piles were constructed with cast in place concrete with four form travelers. Using the balanced cantilever method the concrete segments were supported by cable stays off main two piers. Six pours were made off each pier, cables were installed on seventh segment. All work was done off trestles and barges.

Federal Highway Administration aaa Obayashi Corporation 2005 aaa 2010

Structure Superintendent aaa Hoover Dam Bypass Colorado River Bridge aaa Boulder City, NV

aa Project consisted of construction of a 1,905aaa long open-span deck concrete arch highway bridge, 890aaa above the Colorado River, and 1,500aaa downstream from the Hoover Dam.

aa Foundations were set in the nearly vertical rock walls of Black Canyon, the piers are precast concrete segmental, the concrete arches are cast-in-place with form travelers, and the bridge deck is concrete cast in place over longitudinal steel tub girders. The temporary construction support for the cast-in-place arch consisted of a full cable-stay bridge with two sets of temporary towers. Placement and tensioning of stay cables followed the arch construction out over the river.

William Neckel aaa Page 2 of 2

KCTR aaa Missouri Department of Transportation aaa Edward Kraemer & Sons, Inc 2002 aaa 2005

Senior Project Manager aaa Kansas City Terminal Railway aaa Kansas City, MO

aa The Kansas City Terminal Railway involved the rehabilitation of approximately 11,000aaa of elevated steel bridge including the rehabilitation of twin truss lift spans over the Kansas River and a twin truss steel bridge demolition over five active railroad lines. The work included the removal and installation of key structural bridge elements, on-time truncated track line outages and assisting the owner with installation of new rail lines.

aa Rehab of high line railroad bridge, river crossing and wood deck. Coordination of sub-contractors and craft, scheduling, job cost detailing, material procurement, union contract negotiations, material purchasing and equipment rentals.

Rieth Riley 1998 aaa 2002

Project Manager

Lloyd Expressway Bridge aaa Evansville, IN

aa $14 million Lloyd Expressway River Bridge consisting of bridge work, drilled shafts, earth reinforced wall, concrete and asphalt paving.

Railroad Bridge aaa Lafayette, IN

aa $6.8 million railroad bridge consisting of bridge and railroad track work.

231 Wabash River Bridge aaa Lafayette, IN

aa $11.5 million river bridge consisting of coffer cells, drilled shafts, and steel piling.

Volker Stevin Construction, Inc. 1990 aaa 1992

Project Manager aaa I-95 Highway Project aaa Miami, FL

aa $10.5 million highway reconstruction, fast track, incentive-based project involving the demolition and reconstruction of bridges while in live traffic in most locations.

Project Manager aaa Dodge Island Bridge aaa Miami, FL

aa $45 million bridge including pre-stressed segmental concrete, steel box girders, concrete deck.

Tutor Saliba 1987 aaa 1990

Project Manager aaa Highway 101/Ventura Freeway aaa Ventura, CA

aa $51 million rehabilitation of old freeway which consisted of several bridges, concrete paving, retaining walls, pre-stressed segmental concrete, steel box girders, concrete deck.

Affiliations

Local 181 Operating Engineers, Knights of Columbus



Contact this candidate