Bruce's InformationLocation: Magnolia, TXTitle: FormanExperience: 12+ yearsWilling to Relocate: NoWilling to Travel: No TravelCareer Level: IntermediateWork Status: U.S. CitizenMember Since: 2010-06-12 Helpful Links
-->
Bruce Schumacher
914 Rustic Oaks Magnolia TX 77354
260-***-**** Cell abpqzq@r.postjobfree.com E-mail
PROFILE
Extensively trained and experienced technical and construction professional, proficient in the operations of CATV & Telco aerial and underground systems. Managed over 10,000 miles of rebuilds and upgrades for CATV systems. Experienced working with over 9,000 miles of fiber optic cable construction for Verizon & AT&T. Trained and applicable work experience in a fiber-rich, two-way broadband upgrades.
EDUCATION and TRAINING
The University of Houston: Management Training
Time Warner Cable: Courses:
Warner Electronics I & II
Human Relations Course
Installation and Repair Course
Served on the Accident review board
Preventative Maintenance
Versalift Safety
Operational Seminar
I.C.S.: Cable Technician Part 1 Electronics Course
PROFESSIONAL EXPERIENCE
Superior Threaded Products LP 6100 Romona Houston TX 77086 10/2009 - present
Overseer/Manager
Accountable for all daily responsibilities pertaining to the assembly of the mobile cell tower trailer project.
Schumacher Technical Service Inc. (Indiana Project) 6/ 1997 - 10/2009
President / Owner and Operator
Managed a successful technical service company. Responsibilities encompassed all corporate set-up and implementation of the company's operations, including but not limited to: Company policies and procedures; Safety & quality control procedures; Scheduled maintenance programs; Employee evaluations; Inventory and cost control measures. Guaranteed the accuracy of all documentation prior to any and all customer/client submissions, thereby ensuring positive and consistent customer satisfaction.
Premier Cable Communication (Atlanta Project) 9/1996 - 6/1997
Assistant Project Manager
Responsible for eight (8) supervisors, consisting of A/P, A/R, Work Scheduling, Quality Control, Safety Meetings, and accountable for the accuracy and timeliness of all documentation of each operation to Media1#.
Time Warner Cable Construction Division ( Houston Project ) 8/1995 - 9/1996
Splicing Forman
Overseer of all delegated daily work assignments, accountable for meeting production goals, minimizing plant down time/outages, Quality checked for system design flaws (applied resign as needed).
Advanced level of: Lotus, Excel, Word.
Time Warner Cable (Houston Project) 8/1992 - 8/1995
Preventative Maintenance Technician
Responsibility involved maintaining the trunk system. Performed various integrity tests, Sweep, FCC, CLI. Used multiple test equipment spectrum analyzer, signal generator, cable fault locator, TDR, OTDR, Light Meter, and CLI meters. Member of the safety review board; worked standby duty.
Distribution Maintenance Technician 5/1991 - 8/1993
Responsible for resolving all reoccurring service problems on the distribution system. Researched all extensive damage claims. Extensive experience with power surges and outages caused by underground construction.
Installation / Repair Technician 2/1988 - 5/1991
Installed new subscribers, termed non-pays. Maintained distribution system and repaired all drop problems.
Professional and personal references available upon request. Available for background check and drug testing.