Post Job Free
Sign in

Project Manager Quality Control

Location:
Magnolia, TX
Posted:
November 25, 2012

Contact this candidate

Resume:

Bruce's InformationLocation: Magnolia, TXTitle: FormanExperience: 12+ yearsWilling to Relocate: NoWilling to Travel: No TravelCareer Level: IntermediateWork Status: U.S. CitizenMember Since: 2010-06-12 Helpful Links

-->

Bruce Schumacher

914 Rustic Oaks Magnolia TX 77354

260-***-**** Cell abpqzq@r.postjobfree.com E-mail

PROFILE

Extensively trained and experienced technical and construction professional, proficient in the operations of CATV & Telco aerial and underground systems. Managed over 10,000 miles of rebuilds and upgrades for CATV systems. Experienced working with over 9,000 miles of fiber optic cable construction for Verizon & AT&T. Trained and applicable work experience in a fiber-rich, two-way broadband upgrades.

EDUCATION and TRAINING

The University of Houston: Management Training

Time Warner Cable: Courses:

Warner Electronics I & II

Human Relations Course

Installation and Repair Course

Served on the Accident review board

Preventative Maintenance

Versalift Safety

Operational Seminar

I.C.S.: Cable Technician Part 1 Electronics Course

PROFESSIONAL EXPERIENCE

Superior Threaded Products LP 6100 Romona Houston TX 77086 10/2009 - present

Overseer/Manager

Accountable for all daily responsibilities pertaining to the assembly of the mobile cell tower trailer project.

Schumacher Technical Service Inc. (Indiana Project) 6/ 1997 - 10/2009

President / Owner and Operator

Managed a successful technical service company. Responsibilities encompassed all corporate set-up and implementation of the company's operations, including but not limited to: Company policies and procedures; Safety & quality control procedures; Scheduled maintenance programs; Employee evaluations; Inventory and cost control measures. Guaranteed the accuracy of all documentation prior to any and all customer/client submissions, thereby ensuring positive and consistent customer satisfaction.

Premier Cable Communication (Atlanta Project) 9/1996 - 6/1997

Assistant Project Manager

Responsible for eight (8) supervisors, consisting of A/P, A/R, Work Scheduling, Quality Control, Safety Meetings, and accountable for the accuracy and timeliness of all documentation of each operation to Media1#.

Time Warner Cable Construction Division ( Houston Project ) 8/1995 - 9/1996

Splicing Forman

Overseer of all delegated daily work assignments, accountable for meeting production goals, minimizing plant down time/outages, Quality checked for system design flaws (applied resign as needed).

Advanced level of: Lotus, Excel, Word.

Time Warner Cable (Houston Project) 8/1992 - 8/1995

Preventative Maintenance Technician

Responsibility involved maintaining the trunk system. Performed various integrity tests, Sweep, FCC, CLI. Used multiple test equipment spectrum analyzer, signal generator, cable fault locator, TDR, OTDR, Light Meter, and CLI meters. Member of the safety review board; worked standby duty.

Distribution Maintenance Technician 5/1991 - 8/1993

Responsible for resolving all reoccurring service problems on the distribution system. Researched all extensive damage claims. Extensive experience with power surges and outages caused by underground construction.

Installation / Repair Technician 2/1988 - 5/1991

Installed new subscribers, termed non-pays. Maintained distribution system and repaired all drop problems.

Professional and personal references available upon request. Available for background check and drug testing.



Contact this candidate