Post Job Free

Resume

Sign in

Project Manager

Location:
Lake Charles, LA
Posted:
November 16, 2012

Contact this candidate

Resume:

> Discussion Board

> View Jobs

Member Area

> Post Your Resume

Employer Only

> View Resumes

> Post Your Job

Account

> Join Now

Posted/Modified on: 04/10/2012 04:31 PDT

Resume Title:

Lead Scheduler

Contact e-mail:

abpqcv@r.postjobfree.com

337-***-****

Industry:

Power, Oil, Gas

Desired Location:

Lake Charles, La

Willing to Relocate:

No

Desired Salary:

$61/hr - $75/hr

NAME: Dickey Lynn Monceaux

CITIZEN: USA

EDUCATION: High School Graduate

TRAINING Project Management Institute,

CPM, Timberline & Detail Estimating, Cost, SAP, JD

Edwards

Primavera P3, P3e, P5, P6

MARITAL STATUS: Married

ADDRESS: 2211 Division Rd

Sulphur, La

337-***-****

cell

abpqcv@r.postjobfree.com

Feb 2009

-PresentShaw Modular Solutions

Lake Charles, La

Nuclear Modules

2011

-2012Assistant Production Manager (Interim

)

2009

-2011Planning/Scheduling Manager

Plan and develop and schedule module fabrication for 6 separate Nuclear Units. I am

responsible for managing 3 schedulers and 4 planners. Daily Reports, Weekly Reports,

Histograms & Monthly Reports. Current schedule is over 100,000 activities

Jan 2005

-2009RECON ENGINEERINING

Sulphur, La.

Petro Chemical Engineering & Management

JAN 2007 Turnaround Lead, Lead Planner, P5/6 Scheduler

FEB 2009 ConocoPhillips Refinery

Lake Charles, La.

Plan, Develop Schedules in P5/P6, and Develop Level 2 &3

Estimates, SAP, Track Cost & Execute Turnarounds for COP

Turnaround Group

JUN

2005Planner/Scheduler

JAN 2007 CITGO Refinery

Lake Charles, La.

Develop scope, Define material & equipment requirements,

Plan, build schedules, & update and maintain schedules

during execution of T/As. Produce histograms, S-Curves,

And Earned Value Reports daily.

1995

-2005FOSTER WHEELER CORPORATION

Clinton, NJ

Petro Chem, Pharmaceutical & Power EPC

JAN 2001 Project Controls/Lead Planner/Scheduler

JUN 2005 Cinergy (Gibson Station)

Owensville, In.

Installation of 5 SCR Units on an existing power plant facility. Responsible for earned

value reporting, 2 week look a heads, manpower histograms, resource loading and building

hourly schedule for outages. Performed weekly cost & schedule analysis. Updated the

schedule weekly and uploaded the CIR into P3 for actual % complete progress. Built and

maintained several commissioning schedules. Built and maintained master schedules with

several sub projects interface.

OCT

2000Area Superintendent

JAN

2001Cinergy (Gibson Station)

Princeton, IN

Installation of new SCR Units on an existing power plant facility.

JAN

2000Piping Superintendent

OCT 2000

Bay Shore Refining

Oregon, OH

Construction of a 180 MW Repowering Project including 8,000 linear feet of pet coke

conveying, water and treatment system, boiler, ash handling, limestone handling and

balance of plant work.

SEP

1999

Shop Superintendent

JAN 2000 Chickasaw Fabrication Facility

Built Pipe Rack Modules for Venezuela

Chickasaw, AL

DEC 1998

Project Superintendent

SEP 1999

Formosa Plastics Corp.

Point Comfort, TX

Pipe rack/piping installation project on an Ethylene/Propylene Purification Unit.

MAR

1998Piping Superintendent

SEP 1998

Westlake Petrochem

Sulphur, LA

Engineering, procurement and construction of the offsites for the Lipex Unit.

SEPT

1997Field Superintendent

MAR 1998

Seadrift Coke L.P. Project

Seadrift, TX

Coker Revamp.

OCT

1996Field Superintendent

JULY

1997Roche Carolina, Inc.

Florence, SC

Erection of a Bulk Pharmaceutical Launch Facility

JAN

1996Construction Manager

SEP 1996

Vista Chemical Company

Lake Charles, LA

ETO Expansion Project

AUG

1995Project Superintendent

DEC 1995

Jamaica Public Service Co. Ltd

Old Harbour, Jamaica

Replace Boiler Unit #4

MAY 1995 Area Manager/Estimator

JULY 1995 Lake Charles, LA

Marketing, Estimating, and Project Execution

1989

- 1995WEST-CAL CONSTRUCTION

Sulphur, LA

Capital, Maintenance & Turnarounds

Project Manager

- Responsible for estimating, planning, scheduling, cost control and

served as jobsite superintendent on numerous capital projects in Lake Charles and Beaumont

area.

1995 Project Superintendent

Star Enterprise

Port Arthur, TX

Sulphur Recovery Turnaround

1994 Project Superintendent

Beaumont Methanol

Beaumont, TX

Sour Water Expansion

1994 Project Superintendent

Arcadian

Lake Charles, LA

Decommission Ammonia Plant

1994 Project Superintendent

CITGO

Lake Charles, LA

Benzene Recovery

1994 Project Superintendent

Conoco

Lake Charles, LA

Coker Turnaround

1993 Night Superintendent

CITGO

Lake Charles, LA

Waste Water Plant

1993 Project Superintendent

Big 3

Lake Charles, LA

Turnaround

1993 Project Superintendent

Tetra

Lake Charles, LA

Turnaround

1993 Project Superintendent

West Lake, Petro Chemical Chem.

Lake Charles, LA

Capital

1992 Project Superintendent

Big 3

Carlyss, LA

Turnaround

1991 Project Superintendent

CITGO

Lake Charles, LA

Amine Vessels

1990 Project Superintendent

Citcon

Lake Charles, LA

Wax Recovery

1989 Project Superintendent

Citcon

Lake Charles, LA

Turnaround

1989 Project Superintendent

Certainteed

Lake Charles, LA

Maintenance

1989 Night Superintendent

Arcadian

Lake Charles, LA

Ammonia Turnaround

Also many small capital projects at all local plants.

1982

- 1989AUSTIN INDUSTRIAL

Beaumont, TX

Capital, Maintenance & Turnarounds

Site Manager

- Over a maintenance & capitol contracts for five (5) years at Chevron USA

in Port Arthur, TX. 800 employees

1984

- 1989 Various maintenance and capital projects

1989

Piping SuperintendentTexaco Chemical

Port Arthur, TX

Ethylene Turnaround

1989

Piping SuperintendentFina

Port Arthur, TX

FCCU Revamp

1988

Project SuperintendentChevron USA

Port Arthur, TX

FCCU Turnaround

1987

Project SuperintendentChevron USA

Port Arthur, TX

FCCU Turnaround

1986

Project SuperintendentChevron USA

Port Arthur, TX

FCCU Turnaround

1985

Project SuperintendentChevron

Port Arthur, TX

FCCU Turnaround

1984

Project SuperintendentTexaco

Port Arthur, TX

FCCU Turnaround

1983

Project SuperintendentTexaco

Port Arthur, TX

FCCU Revamp

1982

Piping SuperintendentChevron

Port Arthur, TX

Benzene Pipeline

1982

- 1983MARS CONSTRUCTION

1983

Site SuperintendentTexaco

Port Arthur, TX

Vacuum Turnaround

1983

General ForemanGulf Refinery

Port Arthur, TX

FCCU Turnaround

1982

Fabrication Shop Superintendant

Lake Charles, LA

1973

- 1982PIPEFITTER - LOCAL 106

Lake Charles, LA

General Foreman, Foreman, Welder, Fabricator,

Pipe fitter, Instrument Fitter & Pipeline

Welder

.

I worked on many local plants & pipeline projects in the Lake Charles and surrounding

areas including offshore pipe lay barges. Work in several shipyards & offshore platforms

throughout the Gulf Coast. Worked in several major fabrications shops from Houston to Lake

Charles.

1981 Foreman PPG (Lk Charles, LA) Fluor Daniels Cap.Project

1980 Foreman-CITGO Lake Charles, LA) Foster Wheeler Coker

1979

Welder / Fitter-CITGO (Lake Charles, LA

) FCCU

1978

Welder / Fitter-CITGO (Lake Charles, LA

) Petro Chem

1977

Foreman-Gulf States Utilities (Lake Charles, LA) Bechtel

Heavy Wall Rigging

1976

Pipefitter-LNG (Lake Charles, LA) Welder - K.C.I

.

1975

Apprentice- Augustine CITGO Maintenance

1974

Apprentice- American Fabricators- Conoco Cap. Project

1973 Apprentice- Firestone / C.F. Braun Capital Project

BROWN & ROOT

1979

Welder ARCO (Houston, TX) Oxarain.

Shell Oil

(Houston, TX

) FCCU Grassroots

1975

Welder Dupont (Orange, TX

) ADR ExpansionREFERENCES

Rusty Parnell

Project Controls Manager for Cinergy Power Plant

812-***-****

abpqcv@r.postjobfree.com

Dale Krider

Product Manager

for Shaw Modular Solutions

337-***-****

abpqcv@r.postjobfree.com

Martin Lacey

Project Director for Foster Wheeler

812-***-****

abpqcv@r.postjobfree.com

Please send comments, suggestions and problems to: abpqcv@r.postjobfree.com

Copyright

2003

-2005Cooper Pugeda Management, Inc. All rigths reserved.



Contact this candidate