Post Job Free
Sign in

Project Manager Supply Chain

Location:
Greenville, SC
Posted:
November 15, 2012

Contact this candidate

Resume:

Mechanical+Industrial Engineer

MBA Economics

Vocational Training Precision Mechanics

Functional SAP Consultant/Business Applications/Industrial Engineering/Supply Chain Mgt

R/2, R/3 MM PP QM PM PS VC SD WM SCM PLM iPPE 24 years since 1985

SAP Projects:

2008/09 PALL Corp. Filter Technology&Machinery Global Rollout Blueprint ECC 6.0 6 months

New York City, USA Frankfurt, Germany Consolidation&Validation Doc PP/QM//PS

German Implementation Setup

2008 SWF Window Fashion,Plastic Extruding US Operations BAiO Rollout ECC 6.0 6 months

Tallahassee, FL - Manitowoc, WI USA Discrete&Process Production PP/MM/VC

Variant Config/MRP/Capacity Plg

2007/08 BSN Medical Inc. Medical Products&Devices Full SAP USA-Rollout ERP ECC 6.0 13 months

Charlotte, NC USA QM/CS Lead Consultant QM/CS/MM/SD

Development of Global Complaint

Handling System (FDA-regulated)

Training,Documentation,Validation

2006/07 SAP America Education Instructor for SAP Training Courses 7 months

Philadelphia, PA USA On-site and at Education Facilities R/3 MM/PP/QM

Teaching Logistics/Manufactg/QM SCM (APO)/PLM

2006 JSR Micro, Inc. HiTech Materials Innovation SAP Improvements Project MM R/3 4.6C 4 months

Sunnyvale, CA USA Config PO Confirmations Process MM/PP

for Asia-US Logistics

2003- Chemical Lime Corporation

(CLC-Lhoist) Entire USA Rollout for 30 plants R/3 4.6C 26 months

2006 Chemical Processing - Quarries MO,TX,AZ,CA,UT,NV,VI,AL,FL MM (PM,SD)

Fort Worth, TX USA Config,-Docu.-Training-Implementation-

Post-Go-Live Support MM-Modules MRP,

Purchasing, LIV&Inventory Mgmt,parts PM,SD

2003 WABCO Compressors Automotive Supplier Development of BOM s, Routings.R/3 4.6C 1 months

Charleston, SC USA Reports PP

2003 GEORGIA-PACIFIC Building Products/Paper Enhancements in MRP, BOM s R/3 4.6C 3 months

Atlanta, GA USA and Routings. LSMW MM, PP

2003 BALDOR Electric Motors, Drives, Generators Classification and DMS R/3 4.6B 3 months

Fort Smith, AR USA Replacement Legacy System TBD CA,DMS,VC,PP (Tech Data system)

2002

TK Kolektor, Inc

. Automotive Supplier SAP System Enhancements MM R/3 4.6C 5 months

Greenville, SC USA US Master Data Maintenance SD,MM,FI

Sales Tax procedures,CM,VM,MMR

2002 UNILEVER Bestfoods (UBFNA) Foods Industry SAP Migration of 5 Margarine R/3 4.6B 5 months

Englewood Cliffs, NJ USA Plants (former LIPTON) MM,PP

Replacement of Mfg/Pro Legacy system

2001 Mercedes-Benz U.S. International (MBUSI) Car Manufacturer R/3 4.6C 8 months

Vance, AL USA US Plant Setup/Switch from Baan MM,PP

Production Control,Logistics SAP Automotive 3.0

2001

TK, Inc

. (Kolektor d.o.o.) Automotive Supplier Setup US Subsidiary System CC R/3 4.6C 2 months

Idrija, Slovenia EU US Master Data Maintenance SD,MM,FI

Greenville, SC USA Sales Tax procedures,CM,VM,MMR

2000 PREMDOR Corporation Doors/Building Products Existing R/3 system merges into a R/3 4.5B 2 months

Tampa, FL USA larger organization PP,MM,SD,

(Feasibility Study) PM,CO,QM

2000 Henry Wurst Inc. Printing Industry Go-live with Project Route 2000 R/3 4.5B 8 months

Kansas City, MO USA Tech data org/Order Processing w/ 4..6 GUI

Variant Config./Cap Plg/Prod Exe PP,MM,VC

1998

99SYMBOL Technologies Electronics/Scanners Go-live with World Project R/3 3.1F 14 months

New York, NY USA Phase II Production/Prod. Costing PP,MM,CO,

Supply Chain Management DMS/APO

Tech data organization Engineering

1998 PIERBURG Inc. Automotive Supplier:Fuel pumps Logistics/PPS/Sales/WM project R/3 3.0C-3.1G 8 months

Greenville, SC USA Upgrade 3.0C to 3.1G MM,PP,SD,WM, Supply Chain Management QM

1997/98 The Timken Company Bearings and Steel Logistics/Manufacturing project R/3 3.1G 3 months

Canton, Ohio USA Parts Business Division PP

Project I-98

1997 Lawson Mardon Wheaton Glass/Plastics Bottles Logistics/PPS/Costing project R/3 3.0G 9 months

Millville, NJ USA R/2-R/3 migration Go-live MM,PP,PM,QM

RM-MAT,RM-PPS

1996 Charlotte Pipe&Foundry Metal/Plastic Fittings Logistics/PPS/Costing project R/3 3.0D 7 months

Charlotte, NC USA BOM/Routing/Production Orders MM,PP

Capacity Planning/Go-live support

1995/96 OWENS-CORNING Fiberglas/Building Products Manufacturing Advantage project R/3 3.0D 14 months

Toledo, Ohio USA Data modeling&design 3.0A-D MM,PP

IF MM-MRP-Manuguistics

Go-live with pilot project 2.2

1995 GEORGIA-PACIFIC Building Products/Paper PPS project R/3 2.2A 5 months

Atlanta, GA USA Project Implementation Planning/ MM,PP

Data design/Prototyping

1994/95 SIEMENS Automotive Systems NAMO Sales/Logistics/PPS project R/2 5.0C/5.0F 15 months

London/Ontario CANADA Post-Implementation Support RM-MAT/

Upgrade release 5.0C to 5.0F RM-PPS/RV

1994 GOODYEAR Tire&Rubber Company Phoenix project PPS R/2 5.0D 9 months

Akron/Ohio USA Project setup/Master data design RM-MAT/RM-PPS

Tech Data Reengineering RM-INST/RM-QSS

1993/94 BMW Manufacturing Corp. PPS project R/3 2.0 6 months

German luxury car manufacturer Second Final Finish Planning PP,QM

Munich, Bavaria GERMANY MMR s/BOM s/Routings feeding

Spartanburg, SC USA into IBM Production Planning Sys.

1992/93

GRUNDIG AG

(Philips group) PPS project R/2 4.3I 11 months

Consumer electronics Data modeling/Implementation RM-PPS

Fuerth, Bavaria GERMANY Go-live with Electronics Division

1990/91 BULTHAUP GERMANY PPS project R/2 5.0A 18 months

Premium Kitchen Manufacturer IT Reengin/SAP Implement strategy. all modules

1990 FLENDER AG GERMANY Logistics project R/2 4.3 5 months

World`s largest gear manufacturer RM-MAT

Career:

1985

-1990Head of Industrial Engineering, SCHOTT Electronic Packaging+Components Landshut/Germany 6 years

Responsible for Technical Support &Documentation; Work Scheduling;

Order Processing and Product Costing.

Project Mgr. SAP-PPS; Implementation of RM-MAT/RM-PPS/RV/RK. R/2 1.6/4.0

Go-live support.

1978

-1985Financial Planner

-Texas Instruments

Logistics Mgr-Tandem Computers/Plant Manager-Knuerr AG Electronic Casing Munich

Detailed SAP Experience

KNOWLEDGE OVERVIEW Senior Systems Engineer - Functional Consultant

in Industrial Engineering Supply Chain Management and Quality Control.

Logistics and Production Planning & Execution. Plant Maintenance. QM.

Master Data Organization. BOM Structures. Task List&Work Instructions.

Sales Order -; Purchase Order -; Production Order -; Maintenance Order - Processing. Engineering Change Mgmt. Document Management System.

MRP I + MRP II. ATP. APO. Inventory Management. Warehouse Mgmt.

Variant Configuration. Product Classification Systems. Product Costing. Reporting System. ABAP Query

. SAP Interfaces (not programming).

SAP Modules: PP/MM/QM/SCM/PLM/PM/PP-PI/SD/PS/WM/CO

DMS/ECM/APO/VC/SRM 2.0/SPM

SAP Functions: DM/DP/SOP/LTP/MPS/MTS/MTO/ATO/ETO/CTM/ATP/

CTP/GATP/FSCM/TMS/MDM/PPM/iPPE/Automotive 3.0/

BW 2.1C/SPP/SNP/SNC/PPDS/SCC/SMI/VMI/PRTM

SAP Tools: ASAP/ARIS 5/BW BEx Analyzer/LSMW

Instructor for SCM-APO, PLM, QM for SAP America Education

EDUCATION

Bachelor of Science

: Mechanical Engineer

Fachhochschule Aalen / Germany (College of Advanced Technology)

MBA

Economics

Post Graduate,

University of Hagen / College for Economics

Certificate: Industrial Engineer

REFA Institute Darmstadt / Germany

Certificate: Management Systems

Academy of German Business Association in Bad Harzburg

Certificate: Auditor

Arthur Young LLP / Texas Instruments

RANGE OF EXPERIENCE

Mr. Schneemann specializes in the integration of the entire Supply Chain Management Functionality with Sales Order Processing, Logistics and Production Planning&Execution (process, discrete and repetitive) modules of the SAP R/3 System incl. Quality Management.

SAP implementation experience:

Material Requirements Planning, Master Production Schedule, Demand Management, Sales and Operations Planning (SOP), Forecasting (LTP)

Master Data Management: Material Master Records (MMR),

Vendor Master (VM), Customer Master (CM), Bills of Materials (BOM),

Routings, Work Center Master, Documents Master, Equipment Master

Classification Systems for Materials, Vendors, Production, QM etc.

Variant Configurator

Purchasing, Procurement, Subcontracting, Consignment, Third-party drop shipment, Sourcing, Outline agreements, Vendor evaluation

Inventory Management, i.e. sampling, cycle counting and continuous inventory methods

Split Valuation and Valuation Control

Sales Order Processing:

Scheduling agreements - Automotive Suppliers - Electronics

Variant Configuration - Printing Industry

Warehouse Management

Quality and Batch Management incl. Usage Decisions Handling

CS and Customer Complaints Handling as part of QM

Capacity Planning, Finite Scheduling (Capacity Evaluation-Capacity Leveling), Capable-To-Match (CTM)

Document Management System (DMS)

Engineering Change Management (ECM) Product Life Cycle Mgmt (PLM)

Standard and Customized Reporting in the Logistics Information System

and Production Information System (POS)

Query Tool. Report Variants.

Business Information Warehouse (BW) Reporting

Data conversion, scrubbing and upload from legacy systems

Job Task Analysis and Authorization/Security Profiles

Documentation and Training

Post Implementation Support

ARIS Business Flow Charts

ASAP Implementation Tool

Continued in detail on next page

PROFESSIONAL AND BUSINESS

EXPERIENCE

2008 - 2009

ECC 6.0

6 months

2008

ECC 6.0 (BAiO)

6 months

2007 2008

R/3 4.7

ECC 6.0

13 months

2006-2007

7 months

2006

R/3 4.6C

4 months

2003

-2006

26 months

R/3 4.6C/620 GUI

2003

2

months

R/3 4.6C

2003

3

month

R/3 4.6C

2003

1

month

R/3 4.6C

2002

5

months part-time

R/3 4.6C

2002

5

months

R/3 4.6B

2001

8

months

R/3 4.6C

Automotive 3.0

2001

3

months

R/3 4.6C

2000

2

month

R/3 4.5B

1999

- 2000

8 months

Project Route

2000

R/3 4.5A/4.6 GUI

1998

- 1999

14 months

Project World

R/3 3.1F

1993

2009 (Highlights)

SAP PP/QM/PS Lead Consultant

PALL Corporation Global Leader in Filtration, Separation, Purification

Entire Blueprint for Global SAP in PP/QM/PS

Validation of Global existing SAP Systems

Validation of existing SAP Configuration in PP/QM/PS

Harmonization of current Logistics Processes

Globalize Manufacturing Processes for Industrial and Life Sciences

Planning for a Global QM System SAP-based

Harmonizing MTS and MTO Processes

Setup system-supported Kanban in SAP

Setup ETO Processes (Engineered-To-Order) for Machinery+Equipment

Setup SOP&LTP Planning Processes (APO Analysis)

Setup Product Group Planning

Setup Consumption-based Planning

Organize ECM Processes (Engineering Change Management)

Prepare Global Validation Document Phase 0

Prepare Local Validation Document Phase 1 Germany (in Frankfurt)

SAP PP/MM Lead Consultant

SKANDIA Window Fashions/EPI Extrutech Plastics, Inc.

Entire Master Data Configuration and LSMW Data Loads

Discrete&Process Manufacturing Orders

MTO - Environment Configuration

MTS Environment Configuration

Variant Configuration Integration into Production Process

Production Execution and Assembly Orders

Capacity Planning (Capacity Evaluation-Capacity Leveling)

Inventory Control

Entire Purchasing Process

SAP QM/CS Lead Consultant (SD/MM involved)

BEIERSDORF AG/BSN medical Inc. Charlotte, NC

Developing Global Complaint Handling System for Customer Service.

QM-controlled CAPA Actions and Usage Decisions for int.+ext. QM processes

Handling FDA regulated Medical Products&Devices Environment.

Fully integrated internal+external Message Communication and RMA Issue.

Evaluating functional and process deviations between Global Template and North America local requirements

QM Project plan and Feasibility Evaluation

Complaint&Return Order Handling in Customer/Product Services

Return Material Authorization (RMA) Procedure

QM Usage Decision Methods like Rejection Handling and Scrapping

Goods Movement Postings to QI, Blocked Stock or Rework, Batch Control

QM Investigation Processes and FDA Reporting

QM CAPA Follow-up Actions

Defect Coding and Reporting

Customer Service Follow-up Actions Credit/Debit Memos, Replacements

Repair Order Processing (on Warranty and Billed Repairs)

Fully integrated Notification Sales Return Order Deliveries-Billing Docs

SAP Kewill Interface for UPS Pickup and Label Printing

Integrated internal and external Message and Docu Communications

Complaint Handling against Vendors

Vendor Evaluation

Integrated Function Modules for Follow-up Actions

Digital Signatures

Audit Trail

QM and CS End User Training

IF studies for external QM subsystems

Instructor for SAP Training Courses

SAP AMERICA Education

R/3 ECC/MM/PP/QM

SCM Supply Chain Management (DP,DS,SNP,IM Hub)

APO Advanced Planning Optimizer

PLM Product Life-cycle Management/IEngineering

SAP Lead Consultant (mostly remote work)

JSR MICRO Inc

. Sunnyvale, CA

SAP Improvements Project: Config PO Confirmation Procedure for Asia-US Logistics processes,

Query-Reporting in MM/PP/QM

SAP MM Lead Consultant

CHEMICAL LIME CORPORATION

(CLC) Fort Worth, TX

Configuration,Documentation,Training,Implementation and Go-live Support of MM-Modules MRP, Purchasing, LIV & Inventory Mgmt, parts of PM, SD, PS (work orders, sales orders, capital projects), QM usage decisions handling.

Entire USA Rollout for 30 plants in MO, TX, AZ, CA, UT, NV, VI, AL

Work out staged Project Plan and Timeline for 30 US locations

Evaluating functional and process deviations between Global Template and US local requirements

Configuring and implementing the full nine yards of the Purchasing Module with the processes of Quotes, approved Purchase requirements and Purchase Orders for material, spare parts and services, contracts and ERS

Purchase Order Approval Strategies

MRP for spares and maintenance/services

Scheduling of Maintenance Orders

Planning and Controlling of External Services

Service Management and Service Orders

SAP PP Consultant

WABCO Compressors

Charleston, SC

Development of BOM s and Routings. Reports

SAP PP Consultant

GEORGIA-PACIFIC

Atlanta, GA

Enhancements in MRP, BOM s and Routings. LSMW

SAP CA Lead Consultant Classification and DMS

BALDOR Electric

Fort Smith, AR

Replacement of Tech Data Legacy System TBD

SAP system enhancement with Classification System for entire product catalog of motors, drives and generators

SAP system enhancement plan with Document Management System (DMS) for drawings on AutoCAD

Organize and create Document Masters

Building links to AutoCAD drawings to pull it into SAP

Building links to Specifications (Word formats) to pull it into SAP screens

Create BOM s with documents as components

Classification System setup for technical retrieval of 450,000 components

IMG Configuration for CA module Classification

Organize and create thousands of Characteristics

Create technical groups and Classes for Engineering

Organize technical Class hierarchies

Setup Class assignments

Create BOM s with Class components

Setup FIND objects transactions

Setup Retrieval Queries

ECM Business Process Evaluation

Research feasibility of Variant Configuration for Sales and Engineering

SAP Project Mgr for US subsidiary of European Automotive Supplier

KOLEKTOR Inc

. Greenville, SC USA

SAP system enhancements and business process improvements in MM/PP

Supply Chain Management

Configuration of Production Order Scheduling

Configuration of PO Scheduling Agreements

BW Reporting 2.1C Basic Setup

BW Business Explorer Web Reporting

SAP MM / PP Lead Consultant

UNILEVER Bestfoods North America

(UBFNA) Englewood Cliffs, NJ

Foods Industry

SAP Migration of 5 Margarine Plants (former LIPTON)

Replacement of Mfg/Pro Legacy system

As-is / To-be Analysis with ASAP methodology

Evaluate As-is business processes for Logistics, Production and Finance

Reconcile business processes between 5 margarine plants and distribution centers

Create business processes for Master data maintenance, Forecasting, Sales order processing, SOP, MPS, MRP, APO, Inventory management, Cycle counting, Production order processing, Capacity Planning, Plant-to-plant transfers, Sub-contracting

To-be Order Management / Logistics Model Design:

Supply Chain Management (SCM) between plants internally

SCM to the customer externally

SCM with the distribution centers

SCM with vendors and subcontractors

Adopt and apply SAP methodology (re-engineering)

Business Process scoping with ASAP tool

Document Business Processes (BPS)

Create Business Process Master Sheet

Replacement of Mfg/Pro Legacy system:

Data mapping for Material Master Records (MMR)

Data mapping for Bill of Materials (BOM)

Data mapping for Work Centers / Production lines

Setup new Routing structures

Data Conversion

MM / PP Configuration and Testing for 5 plants:

Planning Strategies config

MRP controllers config

MRP settings (lot-size policies&procedures etc.)

Activate MRP run schedule for 5 plants

Develop Master Production Schedule (MPS) routines

Develop MPS/SOP tool (APO analysis)

Production order processing settings

Confirmation procedure config

Collective order setup for Mixed pallets

Create profile for daily Production order schedule layout

UBFNA Reporting System Setup:

Reconcile available documents about reporting (in the legacy system)

Find a match in SAP for available on-line information tools & transactions

Analyze BW Reporting 2.0B implementation

Setup and apply report development tool ABAP Query

Information gap analysis

Identify customized report needs

Functional Specification for customized reports

Create Report Mapping Chart Mfg/Pro SAP

Setup Report Menu transactions

Documentation of reports and instructions for selection screens

(Report booklet)

Train end-users in the use of different reporting and query methods

Post-Implementation Support in Olathe/Kansas City, KS:

Go-life and post-implementation support for an entire margarine plant

Night shift order confirmation support

Overview daily production order schedule layout

Lead daily inventory adjustments, order changes and cancellations

Costing of production orders

Settlement of production orders

SAP PP / SCM Lead Consultant

MERCEDES-BENZ US International (MBUSI) Vance, AL

M-Class Manufacturing Plant

MBUSI Business Processes Evaluation:

MBUSI Roadmap evaluation

As-is business processes and interfaces

To-be Order Management / Customs Logistics Models creation and

APO:

Supply Chain Management (SCM) internally

and externally for daily and hourly suppliers

Plant expansion organization (supply chain impacts)

Production lines layout (bodyshop-paintshop-assembly line)

1-plant vs. 2-plants study

Engineering Change Approval Process for parts

Business Process scoping with ASAP tool

Develop Business Flow Charts with ARIS 5 tool

Create Process Description Sheets (PDS)

SAP Discovery Phase:

Bottom-line SAP client configuration 4.6C of MM and PP modules

Setting up customized (test) supply chain applications for proof of concept

RAN Process Concept (Receipt Authorization Number)

RAN Process Performance Test scenario

PO/Contract/Scheduling agreements evaluation

Evaluate Automotive 3.0 functions for MBUSI

APO feasibility study

Classification setup for car colors/paint

Re-design Engineering Change Management (ECM) in SAP as the core system + interface to shop floor system (sequencing tool AFS)

SAP Blueprint Phase:

Master Data Organization in SAP as to replace BaaN master data

Material Master Item Master mapping

Vendor Master Supplier data mapping

Info Record Contract data mapping

Customer Master mapping

Bill of Materials (BOM) mapping

Workcenter/workstation mapping

Work Process description (routings) development

Create MBPL (ASAP tool) for MRP and PP part

Setup customized planning strategies and advanced planning for daily parts supply

Modify SCM, based on RAN process (customized ABAP programs necessary)

Foreign Trade Zone Data Maintenance

Configured overseas deliveries to the Graz plant via standard SAP logistic

SAP Project Manager for US subsidiary setup of Slovenian company

KOLEKTOR d.o.o. / TK Inc. Idrija, Slovenia / Fountain Inn, SC

Automotive Supplier 3rd Tier (Commutators)

Project start in Europe/Slovenia: Analysis of US requirements and system preparation for PP, MM, SD, FI

Project Layout Plan

US version company code setup in IMG

PP Production order settings

MM Purchase order settings

Testing of purchase order scenarios

Material types account determination

VPN setup for remote network access

SAP GUI setup for remote system setup

Check SAP remote function from the TK site at Fountain Inn, SC

US Taxation procedures analysis with CPA s for the US settlement

FI Taxation procedures and account determination

Configuration of tax codes and jurisdiction codes for sales tax

and use tax calculation in FI/SD/MM modules

FI approval of the US chart of accounts with the CPA

Final check of SAP configuration for the US company code in test client

Final test of major functionalities and transaction codes in test client 001

SAP Project Manager for a merger project Premdor-Masonite

PREMDOR Corporation, Tampa, FL

Building Products/ Pulp&Paper Industry

Feasibility Study of merging an existing R/3 system 4.5B into a larger corporation.

Assessment Report: Analysis of existing SAP modules

PP, MM, PM, SD, FI in a network life environment.

Evaluation of a SAP phase-out plan

Evaluation of a SAP phase-in plan

Evaluation of a SAP resource plan

Evaluation of a budget plan

Participation in a Hardware and Network Environment plan

As-is vs. To-be comparison in explicit business processes

SAP Presentations and system demos

Project stop because of missing governmental merger approval

PP Team Lead for Arthur Andersen

HENRY WURST Incorporated, Kansas City, MO

Printing/Media Industry

Phase I: Implementation MM and HR (was ongoing)

Phase II: Implementation PP FI CO SD (full cycle finished)

Responsible for the whole PP module implementation and the integration into MM, SD, CO and Variant Configurator (VC).

Designed and organized company master data to as a basis for the applications: Material Master Records (MMR), Bill of Materials (BOM), Work Centers, Routings, Product Classification.

Designed the entire supply-chain management for three of their plants.

Configured a Make-to-Order planning strategy as well as a multiple plant planning setup.

Configured customized Production order process, based on the Variant Configurator in 2 ways: Standard Production Orders

Collective Production Orders (multiple-level)

For 3 production levels: 1. Pre-print process

2. Printing

3. Assembly (Stitching, Binding, Packaging)

Required variant BOM s variant routings with alternative operations.

Organized shop floor goods issue (GI) policies batch controlled.

Setup shift organization.

Setup capacity requirements planning (Capacity Evaluation level).

PP Functional Testing

Integration Test

Developed together the first complete multi-level Variant Configurator order processing scenario for the printing industry in North America.

Go-life - Post Implementation Support

PP / Engineering Team Lead for Price Waterhouse Coopers

SYMBOL Technologies, New York, NY (Long Island)

High Tech Industry (Electronics/Scanners)

Phase II Implementation PP MM CO FI assets (full cycle implementation)

Reengineering of production planning & control - engineering department

Responsible for reorganization of the engineering department with the core master data maintenance.

Master data design: Material Master Records: 12,000 finished products

30,000 components

Bill of Materials (BOM): 6,000

New Routings for production process and product costing

Product Classification

Dynpro / screen Modification

Data Mining / Data Mapping

Replacement of Technical database ManMan (CA) by SAP R/3 HP-UX and Oracle

Configure and implement Engineering Change Management (ECM) in R/3:

Specifics: Validity Time restricted BOM s

Configure and implement Document Management System (DMS) in R/3:

Split of technical database into Material Masters (above) and

Document Masters 12,000

Technical data cleaning process

Supply Chain Management with APO (Feasibility Study and demo with APO 1.0)

Supply Chain Management with new SAP master data: multiple-plant +global

MRP I: Make-to-order strategy for finished goods

Make-to-stock strategy for components

Consumption-based planning with exponential smoothing 1st grade (alpha factor)

MPS: Master Production Plan for Product Groups (Product hierarchies)

Product Costing: Material Valuation measures and price change procedures

Go-life - Post Implementation Support

1998

8

months

Upgrade Project

&Enhancements

3.0C - 3.1G

Project Manager and PP/MM Lead for a Systems Upgrade Project

PIERBURG Inc

., Greenville, SC

Automotive Supplier (Fuel Pumps)

Phase I: Optimization & Enhancement of SD, MM, PP, WM, QM functionality

Phase II: SAP Systems Release Change 3.0C to 3.1G

Order Processing and MRP enhancements

Automotive Forecasting and Operational Planning (SOP)

Automotive Delivery Scheduling Agreements and reconciliation

Reconfiguration of Planning Strategies

Implementation of an integrated Deterministic top-level MRP Model

w/ transfer of sales requirements directly into MRP and Mfg

>>> created Make-to-order planning situation

Consumption-based planning for sub-assemblies and components

>>> created Make-to-stock planning situation

Installed Backlog functionality

Organization of Returnable Transport Packaging

Trained sales end-users how to use Scheduling Agreements functions

Activation of automatic scheduled plant-specific MRP run

Safety-stock policy evaluation

Setup use of different BOM-types: Parts list Spec list Drawing guide

Evaluated procedure and configured BOM for Engineering Changes (ECM)

Adjusted version control for documents and activated in MMR

Routing usage review

Applied SAP scrap-handling procedures to the manufacturing process

Improvements on Rework Order functionality

Usage of Production Order Info System (POS) w/ profiling of CO26

Train schedulers in SAP MRP methodology

Documentation of workflow

Setup the use of different UoM for finished products

Setup Purchase Outline Agreements

Evaluate and calculate replenishment times

Repair of price changes in PO s for future validity periods

Installed Overdelivery Policy in PO scheduling agreements

Improve transfer postings between storage locations

Enhance transfer postings into and out of quality inspection

Account determination process for scrap from production

Ensure process of Partial rejection in QM

Configured drawing version tracking for QM

SAP Release Change preparation: delta functions review on all modules

Upgrade schedule (planning of technical and organizational upgrade steps)

Authorization profiles update

Manual maintenance of Security & authoriz. profiles after systems restore

Create, train and maintain individual end-user screen menus

Go-life support on release 3.1G

1997

9

months

Migration Project

R/2 R/3 3.0G

PP / MM Lead Consultant

LAWSON MARDON WHEATON

Plastics Operations / Glass Production Operations / Equip. Measurement Syst.

Millville, NJ

Plastics and Glass Applications for the Airline and Perfume Industry

Phase I: Migration of existing R/2 modules RM-MAT; RM-PPS; RM-INST

(RV; RF; RA; RK; ) into R/3 MM;PP;PM (SD;FI;AM;CO) modules

for Plastics Division

Phase II: Implementation R/3 MM PP PM (SD FI AM CO) in Glass Division

Responsible for preparation and configuration of the R/3 PP and PM module and all master data in MM

Work Center organization

Capacity Planning with Evaluation profile and capacity leveling for

Discrete Plastics manufacturing and

Process planning for glass production (furnace control)

Creation of customized Capacity Unit of Measurement

Fine Tuning of capacity layout screen

Setup Strategy Profiles

Sorting and Sequencing (Determining dispatching sequences)

Temporary Simulation

Finite Scheduling

Setup material movements / setup customized quality movements

Creation of Equipment Masters

Creation of Maintenance orders (not existing in R/2)

Data mapping R/2 R/3 (incl. Tcode mapping; ABAP-Pgr mapping)

Business process mapping and reengineering in Production Planning and Execution

Enhance R/3 with setup of new multiple-plant organization and distribution centers

Extended storage location setup through all plants and distribution warehouses

Master data conversion: MMR s: Finished products + components 80,000

Bill of Materials (BOM,s): 18,000

New Routings for production process and product costing

Material Classification

Vendor Orders check (R/2 to R/3 transfer)

Manual Re-creation of all R/2-Production Orders (WO) within R/3

The R/2 R/3 migration had a complex technical aspect of switching data bases and conversion of master data properly, so module leaders were heavily involved in Master Data Load Strategy and data mapping field by field and value by value.

Data conversion programs conception and:

Participation in how to use SAP s conversion programs for Number ranges,

General ledger, Creditors, Debitors, Material master records, BOM s,

Routings, Vendor masters, Price Conditions, Purchase orders, Open orders,

Open invoices, Material movements, Plant Maintenance, MRP, Production

Orders and the development of conversion programs.

Specific customer classification:

Most modified master data fields in R/2 had to be rebuilt with the

classification tool. I did this customization in R/3.

Evaluation of a Production Information System (PIS)

PP MM Unit Testing

Logistics Integration Testing based on scenarios

Business Process Documentation

Transaction Documentation

Develop Cutover Plan (MM PP PM part)

End-user training

Go-life - Post Implementation Support

Help desk

SAP skills: R/3 PP experience 14 years

R/3 MM experience 16 years

R/3 PM experience 8 years

R/3 SD experience 7 years

R/2 RM-PP, RM-MAT, RV, RK experience 10 years

R/2 - R/3 Migration experience . Total SAP experience 24 years

ARIS 5 training course 3 days

ASAP 4.6 training course 3 days

BW Reporting 2.0B/2.1C training course 5 days

Computer skills:

MS DOS, Windows 3.1, 95, 98, 2000, NT 3.51, NT 4.0, XP Professional, Vista

Apple OS 9.0/9.2/Tiger OS X/Leopard OS 10.5

Linux 7.1

Networking, NIC, Laplink, PCsync,

Norton SystemWorks, Partition Magic, Second Chance, Drive Image

Office:WordPro,Winword 2000,Excel,Lotus123,LotusNotes,Freelance,Powerpoint,

MS Project, QuickBooks Pro

Visio 8.0

Resume VOLKER SCHNEEMANN

Volker Schneemann P.O.

Box 25271 Greenville, SC 29616-0271

PH (864) 704 - 2126

FAX (864) 675 - 0706

e-mail: abpo2m@r.postjobfree.com



Contact this candidate