Post Job Free
Sign in

Project Manager Construction

Location:
Roseville, CA
Posted:
November 19, 2012

Contact this candidate

Resume:

RESUME *

EDWARD SEQUENCE

WETLAND SCIENTIST, BIOLOGIST, RESTORATION ECOLOGIST

EDWARD SEQUENCE

**** *********** ***** #***

ROSEVILLE, CA95678

Edward Sequence s qualifications include more than nine years experience in

916-***-****

the environmental consulting industry, where his skills have allowed him to

abpkm5@r.postjobfree.com

gain extensive experience in all aspects of ecological restoration, wetlands and

SUMMARY threatened and endangered species issues.

Wetlands specialist

Restoration ecologist

Environmental compliance specialist This specialized skill set includes wetland delineation, upland and wetland

mitigation, wetland permitting, NEPA/CEQA compliance consulting,

CAREER SUMMARY

vegetation classification and mapping, fisheries habitat restoration, habitat

WestEKO International, 1999-Present

Restoration Ecologist/Wetlands Specialist evaluation for threatened and endangered species as well as some experience

conducting macro invertebrate and fish biomass surveys.

ENVIRON, 1998-1999

Environmental/Wetlands Scientist

Mr. Sequence also has experience working on numerous environmental

Golden Pacific Environmental, 1996-1998

compliance projects and has developed skills training construction crews,

Environmental Project Manager

tracking mitigation and monitoring programs, and communicating with

The Mullen+Watkins+Everett Group, 1992-1996

construction management teams. His experience also includes specifying,

Environmental Specialist/Wetlands Ecologist

installing, and monitoring sediment and erosion control measures (BMPs)

EDUCATION

with regard to water quality control and NPDES standards. This

BA, Environmental Conservation, University of

environmental compliance project experience is complemented by extensive

California, Santa Cruz, 1994

experience with resource agency permitting including Clean Water Act

Sections 401 and 404, CDFG Section 1600, Habitat Loss Permits, and numerous

AFFILIATIONS

other regional and local permits.

Society of Wetland Scientists

California Native Plant Society

International Erosion Control Association

Mr. Sequence has managed numerous projects from the initial assessment

Trout Unlimited

stage through planning, impact assessment, permitting, and mitigation design

Ducks Unlimited

to onsite construction supervision and mitigation implementation. His

CERTIFICATIONS/TRAINING

experience has also allowed him to manage many multidisciplinary teams of

U.S. Army Corps of Engineers Wetland Delineation

specialists from both the private and public sector during the NEPA and

Certification Program Training Course, 1998

CEQA processes.

How to Select, Establish and Use Plants for Erosion

Control IECA Professional Development Course,

2001

HABITAT RESTORATION

PUBLICATIONS/PRESENTATIONS

Sequence, E., and Mitchell, B., Post Treatment

Berryessa Reservoir, Yolo County, California

Wetted Surface Area at the Putah Creek Nonpoint

Restoration Ecologist / Compliance Monitor

Source Pollution Project. Proceedings of the

Southwestern and Rocky Mountain Division American

CLIENT: City of Winters

Association for the Advancement of Science Seventy-

In response to projected temporary impacts to 3.7 acres of sage scrub from

Sixth Annual Meeting. Volume 34, Number 1, May

2000.

installation of an underground reservoir, WestEKO was retained to prepare

landscape plans and specifications, install the irrigation system and landscape

Sequence, E., and Faulkner, W., Rehabilitation and

Revegetation of a Landslide above the PG&E Moraga

plants and seed, and maintain and monitor the site. Preparation of the

Substation. Proceedings of the 37nd Annual

landscape plans and specifications involved coordination with City planners

International Erosion Control Association Conference,

February 5-9, 2006 and Land and Water Magazine,

and project engineers, and the plans were prepared quickly to secure state

July/August 2006.

funding for the reservoir project. Based on input from the project team

including construction personnel, native plants were salvaged and

transplanted and topsoil re applied. On behalf of the project, WestEKO

oversaw storm water pollution prevention measures and erosion control

during reservoir construction and the current re vegetation phase. The

irrigation system and native container plants and seed were successfully

installed in 2001.

SEQUENCE SYSTEMS LLC

SAMPLE EXPERIENCED MANAGEMENT PROFESSIONAL RESUME

PHONE: 916-***-**** FAX: 916-***-****

WWW.SEQUENCESTAFFING.COM

RESUME 2

EDWARD SEQUENCE

Coachella Canal Lining Project, Imperial County, California

Project Manager/Restoration Ecologist

CLIENT: Coachella Valley Water District/U.S. Bureau of Reclamation

Evaluated and delineated vegetation community changes from original 1989 mapping to 2000

conditions. Impacts to desert riparian and marsh/aquatic habitats resulting from the lining of

approximately 32 miles of earthen canal were then assessed. Coordinated with GIS staff to document

changes. Coordinated with the resource agencies and clients to resolve potential listed species issues

and managed wildlife biology staff assessing those potential issues. Prepared concept for desert

riparian habitat mitigation effort and final mitigation implementation plan for over 300 acres of

habitat creation.

Monterey Highlands Canyon Comprehensive Mitigation Plan, Monterey, California

Restoration Ecologist/Wetland Scientist

CLIENT: Granite Construction

Evaluated and mapped upland and wetland/riparian vegetation communities within the boundary as

defined the upper canyon. Work included mapping sensitive habitat (coastal sage scrub,

wetland/riparian areas, etc.), identifying and evaluating potential restoration areas, and assimilating

field data into usable form.

Temecula Creek Restoration, Riverside County, California

Restoration Ecologist

CLIENT: City of Temecula

Conducted a field meeting and inspection of grading with the contractor and the City of Temecula for

an ACOE and CDFG mitigation area. Work included coordination, field inspection, and resulting

recommendations. Continuing work includes implementation monitoring and long-term success

monitoring and reporting.

Emergency Storage Project Seacliff Pipeline, Santa Cruz County, California

Restoration Ecologist

CLIENT: Santa Cruz County Water Authority

Inspected proposed geotechnical boring locations for a proposed pipeline near Seacliff Reservoir.

Work included identifying biological constraints for access and drilling at eleven locations. Biological

constraints identified included coastal sage scrub habitat impacts, coast live oak presence, and

proposed boring locations in Seacliff Creek. Biological constraints were then analyzed referencing

existing 404 and 1601 permits and recommendations for avoidance, minimization and restoration

were produced.

WETLANDS DELINEATION, RESTORATION, PERMITTING, MONITORING AND

MITIGATION DESIGN

Miramar Naval Training Center Redevelopment, Orange County, California

Restoration Ecologist/Wetland Scientist

CLIENT: Private Developer

Participated in design charettes to incorporate natural wetland features in storm water retention

ponds. Ideas and input included development of functional wetland features, wildlife habitat, and

other amenities for sustainable community design.

EDWARD SEQUENCE

RESUME 3

EDWARD SEQUENCE

SR 56 Wetland Mitigation Plan, San Diego, California

Restoration Ecologist/Wetland Scientist

CLIENT: Jacob Engineering

Assisted in the preparation of a conceptual wetlands mitigation plan for the proposed SR 56

alignment as required by the ACOE and the CDFG. Work included mitigation ratio analyses and

mitigation report preparation.

Wetland Mitigation Site Selection Model, San Luis Obispo County, California

Restoration Ecologist/Wetland Scientist

CLIENT: San Luis Obispo County Water Authority

Worked with biology team to produce a model to select wetland mitigation sites in San Luis Obispo

County. Work included formulation of selection criteria, designation of values for those criteria, and

putting the criteria into a user friendly format. Field application of the model to select appropriate

mitigation sites to compensate for project related impacts was completed and site selection and

design is in progress.

U.S. Highway 285/S.H. 17 Safety Improvements, Keystone County, Colorado

Restoration Ecologist/Wetland Scientist

CLIENT: Colorado Department of Transportation

Conducted wetland delineation of a 10-mile highway corridor for the Colorado Department of

Transportation. Work included jurisdictional delineation, boundary verification with ACOE,

identification of conceptual mitigation areas, and 404 permitting. The work also included assuring

compliance with Colorado Senate Bill 40.

U.S. Highway 160 (west) Safety Improvements, Keystone County, Colorado

Restoration Ecologist/Wetland Scientist

CLIENT: Colorado Department of Transportation

Conducted wetland delineation of a 15 mile highway corridor west of Durango for the Colorado

Department of Transportation. Work included jurisdictional delineation, boundary verification with

the ACOE, identification of conceptual mitigation areas, and 404 permitting. The work also included

assuring compliance with Colorado Senate Bill 40.

Copper Bowl Expansion, Summitt County, Colorado

Restoration Ecologist/Wetland Scientist

CLIENT: Copper Mountain Ski Area

Assisted in the design of a wetland mitigation project at over 11,000 feet elevation to replace wetland

impacts associated with the construction of a new ski lift.

Snowmass Mountain Wetland Assessment, Pitkin County, Colorado

Restoration Ecologist/Wetland Scientist

CLIENT: Aspen Ski Company

Delineated wetlands in undeveloped areas of Snowmass Ski Area s special use permit area.

ENVIRONMENTAL COMPLIANCE AND BIOLOGICAL MONITORING

City of Modesto Reclaimed Water Distribution System, Modesto, California

Restoration Ecologist

CLIENT: City of Modesto

Tasks include obtaining 404, 1601, 401, and 4(d) permits for project approval, plan review, developing

a mitigation requirement database, conducting construction crew trainings, onsite biological and

environmental compliance monitoring, team meetings, coordination with city staff and construction

site managers, and agency coordination.

EDWARD SEQUENCE

RESUME 4

EDWARD SEQUENCE

Mission Creek Wetlands Management Plan, San Diego, California

Restoration Ecologist/Wetland Scientist

CLIENT: City of San Diego

Managed and conducted biological field studies and preparation of a wetlands management and

restoration opportunities report for Mission Creek in south San Diego. Tasks include project

management, team meetings, coordination with City staff, wetland delineations, restoration

opportunity identification, opportunities and constraints analysis, and preparation of a

comprehensive wetlands management plan.

Moraga Substation Coastal Sage Scrub Biological Monitoring, Moraga, California

Restoration Ecologist

CLIENT: Pacific Gas and Electric

Monitored the implementation and maintenance of a rehabilitated and re vegetated landslide. Work

included monitoring coastal sage scrub container plant and hydroseed applications, seed and plant

inspection, contractor training, success standard monitoring, project coordination, and maintenance

instruction and supervision.

Oak Grove Drive Wetland Mitigation, San Clemente California

Restoration Ecologist/Wetland Scientist

CLIENT: City of San Clemente

Monitored and inspected a wetland mitigation project for impacts incurred from a road widening

project. Work included project coordination, contractor/design team meetings, monitoring survey

staking, grading, container plant delivery, sediment and erosion control requirements, site mitigation

requirements, container plant and seed application, and final environmental compliance evaluation.

NEPA/CEQA COMPLIANCE MANAGEMENT AND REPORT PREPARATION

Sonoma Creek EIS/EIR and Restoration Plan

Restoration Ecologist

CLIENT: U.S. Army Corps of Engineers

Significantly contributed to the biology sections of the NEPA and CEQA document for the Sonoma

Creek Flood Control and Management Plan. Also played a major role in the preparation of a

restoration and mitigation plan for impacts to wetlands, waters of the U.S., riparian woodland, and

Marin coastal sage scrub. Work included restoration design, impact analysis, construction cost

estimates, alternatives analysis, plan review, and team coordination.

San Simeon Creek EIS/EIR and Mitigation Plan

Restoration Ecologist/Wetland Scientist

CLIENT: U.S. Army Corps of Engineers

Significantly contributed to the preparation of the mitigation plan for impacts to wetlands, waters of

the U.S. and riparian woodland. Work included restoration design and construction cost estimates.

Donner Creek Ski Area Expansion, New Parking Lots and Ski Lift, Tahoe County, California

Restoration Ecologist/Wetland Scientist

CLIENT: Donner Creek Ski Area

Managed a multi disciplinary team of specialists from both the public and private sector. Worked

closely with the Tahoe National Forest and Donner Creek Ski Area Management to effectively and

efficiently work through the NEPA/CEQA process from initial scoping through the final appeal and

Record of Decision signing. Compiled the specialists reports into the EA text and prepared the

wetland and socioeconomic sections.

EDWARD SEQUENCE

RESUME 5

EDWARD SEQUENCE Southern Ute Indian Tribe (SUIT) Cedar Point Housing Development EA, La Plata County,

Colorado

Restoration Ecologist

CLIENT: Southern Ute Indian Tribe

Conducted an extensive wetland delineation of a 400 acre site on the Southern Ute Reservation.

Work included jurisdictional delineation, boundary verification with the ACOE, identification of

conceptual mitigation areas, and 404 permitting. The work also included preparation of support

material for the vegetation, physical environment, and wildlife sections of an EA prepared for the

Bureau of Indian Affairs.

STREAM HABITAT/FISHERIES RESTORATION

Rancho Creek Fisheries Habitat Restoration Plan, Ventura County, California

Restoration Ecologist

CLIENT: U.S. Army Corps of Engineers, Los Angeles District

Assisted in the preparation of a preliminary restoration plan for lower Rancho Creek with special

attention to re establishing a migration route for salmon spawning. Work included conceptual

design, report edits, and graphics preparation.

Mountain Gravel Habitat Restoration, Los Alamitos, California

Restoration Ecologist

CLIENT: Granite Gravel

Team member in the design of Los Alamitos River Restoration to mitigate for gravel harvest activities.

Work involved data collection, data analysis, and preparation of design figures to support Individual

404 Permit renewal application.

Yuba Reservoir, Yuba County, California

Restoration Ecologist

CLIENT: Sutter Buttes Development, LLC

Worked with engineers on the design of the restoration of Yuba Creek to mitigate for impacts

associated with an in stream reservoir. Design included drop structures, bank recontouring and

stabilization using bioengineered treatments, and recreating a 1:1 pool to riffle ratio.

Alpine Cascade Ranch Trout Habitat Enhancement, Archuleta County, Colorado

Restoration Ecologist

CLIENT: Pagosa Land and Cattle Company

Team member in the design of San Juan River Trout Habitat Enhancement/ Restoration to improve

health and size of trout population. Work involved data collection, data analysis, and preparation of

design figures to support Regional General 404 Permit application.

EDWARD SEQUENCE



Contact this candidate