Post Job Free
Sign in

Engineer Project Manager

Location:
Idaho Falls, ID
Posted:
November 20, 2012

Contact this candidate

Resume:

James Wixson

abpjoo@r.postjobfree.com

208-***-****

James Wixson MEngr-SE, MBA, BSIE

Principle Systems Engineer

**** ****** ***. ***** *****, ID 83402

Email: abpjoo@r.postjobfree.com

http://wvasolutions.com

Linked In Profile: http://www.linkedin.com/in/jrwixson

Phone: 208-***-****

Alt: 208-***-****

U.S. CITIZEN

Security clearance history:

Top Secret/CRYPTO: 8/1967 6/1971 (Inactive)

Secret: 12/1983 12/1988 (Inactive)

Secret/SCI: 12/1988 2/1990 (Inactive)

DOE L Clearance: 6/1991 1/2006 (Inactive)

SUMMARY OF WORK EXPERIENCE

W ith a Masters degree in Systems Engineering, an MBA and BS degree in Industrial Engineering and over 25

years of professional experience, I am looking for my next, challenging project. My experience is about equally

divided between aerospace and nuclear energy industries. I have a progressive performance history, of individual

contributions and supervision, as well as progressive project team and project scope size, leading to the success

of key projects at Boeing, Lockheed-Martin, Raytheon Aircraft, Curtiss-Wright, Bechtel and Department of Energy,

working as Principal Systems Engineer, Value Engineer and Lean Six-Sigma and Project Management

consultant. I ve contributed to proposals; cost reduction and value engineering, product development,

requirements engineering, project management, development and modifications for aircraft and missiles, nuclear

facility maintenance and operations. I also have experience in supplier operations working with company vendors

to assess production readiness and working with troubled suppliers to improve quality, reliability and delivery

performance. I am an expert in data analysis drawing data from companies MRP systems using advanced

techniques with MS Excel and MS Access (2007-2010) and MS SQL Server.

An example of profit and savings I have generated are from implementing a Value Engineering Program resulting

in $6.4M cost savings at Raytheon Aircraft, Montek division in first year of implementation and the win of a $300M

5-year long term business agreement for production of primary and secondary flight control systems on the

Boeing 700 Series aircraft. Over the course of my career my lean-six sigma and value engineering efforts

resulted in an estimated savings of $64.5M. I was also the division s Design To Cost (DTC) program manager

assigned to develop and manages the division s DTC program. I have also worked as a principal systems

engineer on various aerospace development programs such as Boeing s 787 airplane development program and

development of the Integrated Mission Management Computer (IMMC) for Northrop-Grumman s Broad Area

Maritime Surveillance UAV.

I have served as Lead or Principal Systems Engineer" for requirements management teams on various product

development programs in both the Aerospace and Nuclear Industries which require rigorous requirements

identification and flow down and verification and validation. I am familiar with FAA Certification requirements

including ARP4754, ARP4761,14 CFR 25.1301 and 1309, DO-178 and DO-254 requirements, processes and

procedures for requirements flow down, verification and validation and test plan development. I am also trained

and skilled in various systems engineering requirements tools including DOORs, SLATE, Rational Rose and other

UML Object Oriented software that are used to facilitate systems engineering and management.

KEY ACCOMPLISHMENTS

Sr. Industrial Engineer - Supplier Operations Consultant worked with Boeing purchasing agents and

suppliers to identify and mitigate key risk areas in the Boeing supply chain and insure readiness for

upcoming rate increases. Identified several key risk areas that potentially could have impacted Boeing s

on-time delivery of airplanes and recommended actions to mitigate these risks. Developed metrics from

data drawn from vendor s MRP system using advanced MS Excel 2010 and MS Access 2010 tools.

Principal Systems Engineering Consultant and requirements focal for the US Navy s Broad Area

Maritime Surveillance (BAMS) UAV Integrated Mission Management Computer (IMMC) built by Curtiss-

Wright Controls for Northrop-Grumman. Flow down of requirements to system test plan.

James Wixson

abpjoo@r.postjobfree.com

208-***-****

Principal Systems Engineering Consultant on the design and development of the Boeing 787

Dreamliner and Boeing s CORE Systems Engineering group supporting all wide bodied commercial

aircraft in DFM/A, lean-six sigma and value engineering methods and techniques. (Boeing)

Sr. Consultant to the Boeing CORE Systems Engineering providing comprehensive general systems

engineering support for the design and development of new products and redesign of existing

products for the Boeing 787 and 777 aircraft using DFM/A and Value Engineering. Worked with

design teams to resolve quality and reliability problems, reduce cost and weight, and improve

performance through application and training in proven improvement techniques including lean-six

sigma, and value engineering.

Implemented a Value Engineering Program resulting in $6.4M cost savings in first year of

implementation win of a 5-year long term business agreement with a key aerospace customer worth

approximately $300M (Raytheon)

Resolved critical flight control failure on Boeing 737 elevator feel computer that was failing in final test

which maintained companies Preferred Provider status with Boeing and contributed to winning new

business worth over $100M and saved over $1M in rework and assembly of replacement parts.

Lead Value Engineer/Lean-Six Sigma Facilitator on various projects resulting in an estimated $64.5M

in savings through application of Value Engineering or Six Sigma methodologies. (INL, Boeing, &

Raytheon )

Lead Systems Engineer and Project Engineer f or a wide variety of projects responsible for

development of management plans for key projects and organizations utilizing advanced Industrial and

Systems Engineering techniques and methodologies. (Boeing, INL)

EDUCATION

Masters Degree in Systems Engineering, University of Idaho, Idaho Falls, ID, 2003

MBA, University of Phoenix, Salt Lake City, Utah, 1986

Masters Certificate in Project Management, Villanova University, Villanova, PA, 2004

B. S. Industrial Engineering, University of Utah, Salt Lake City, Utah,1977

CORE COMPENTENCIES

Supply Chain Management and Operations, risk management and mitigation.

Knowledge of systems engineering processes as prescribed in MIL-STD-499 Systems Engineering

management and INCOSE Systems Engineering Handbook

Experienced with FAA Certification to DO-178B and DO-254

Experienced with FAA Avionics Certification and Approval process

Systems Engineering: Requirements Management, Decomposition & Flow Down, Verification & Validation of

Requirements, Systems Design, Design to Cost (CAIV), FMEA, Trade Studies, Modeling and Simulation, System

Dynamics, Systems Analysis, Functional Analysis, Optimization, FMECAs and Fault Tree analyses.

Supply Chain Management and Operations

Value Engineering Skills: Certified Value Specialist (CVS-Life), Cost Analysis, Cost reduction, New Product

Development, Facilitation, TRIZ, VECPs, Decision Analysis, Organization Analysis,

Trained and experienced with DOORs, SLATE and CORE enterprise systems engineering tools.

Project Management Skills: PMI PMBOK, MS Project, Theory of Constraints, Earned Value Management

Contract Administration, Bid Preparation and Negotiation

Lean Six Sigma: Experienced in Lean Six Sigma, Six Sigma Yellow Belt, Six Sigma Black Belt

Statistical software tools: Mini-tab and SAS.

Process modeling tools: ARENA and Extend.

Systems Dynamics tools: VENSIM and STELLA/I-THINK.

Microsoft Products experience: MS Word, Excel (expert), Access(expert), PowerPoint, Visio and MS Project

EXPERIENCE

7/7/2011 12/8/2011

Boeing Commercial Airplane Division, Everett, WA (On Contract)

Sr. Industrial Engineer Supplier Management Operations

Supported Boeing Supplier Management Operations through technical analysis of vendor rate readiness and risk

identification. Worked with Boeing Purchasing Agents and vendors to assess production flow, lean six-sigma,

manpower, facility layout and physical plant condition and other areas that may affect rate readiness. Helped

vendors prepare for Rate Readiness Reviews and participate on audit teams to assess vendor rate readiness.

Worked with troubled suppliers conducting on-site corrective action to improve quality and delivery performance,

identify and implement metrics and assist with lean implementation in preparation for production rate increases.

James Wixson

abpjoo@r.postjobfree.com

208-***-****

11/2010 2/2011

Curtiss-Wright Control Systems, Santa Clarita, CA (On Contract)

Principal Systems Engineering Consultant and requirements focal for the Broad Area Maritime Surveillance

(BAMS) UAV Integrated Mission Management Computer (IMMC) built by Curtiss-Wright Controls for Northrop-

Grumman. Managed the requirements development, entered and maintained the requirements in

DOORs and assured all program and technical project/product requirements were identified and

allocated to project design requirements and software test documents perDO-178B. Assured

documents were reviewed and approved per CMMI processes and procedures.

9/2010 -10/2010

Department of Energy, Richland Operations Office, Richland, WA (On Contract)

Principal Project Management Consultant

Assist the Assistant Manager for Mission Support (AMMS) with aligning AMMS leadership expectation and

management approaches using value management tools and techniques for the purpose of minimizing

vulnerabilities to the oversight of the mission support portfolio. Provide value engineering support including, but

not limited to, review and analysis mission support priorities and effectiveness, R2A2s, streamline and optimize

AMMS management practices and documentation.

8/2009 - 2/2010

George E. W halen VA Hospital, Salt Lake City, UT

Systems Redesign Engineer

Used Lean Six-Sigma methodologies to reduce patient wait time for beds, improve patient flow and reduce

wasted hospital space and resources that were caused by delays in admissions, transfers and discharges.

Increased access to clinical appointments, improved flow, reduced wait time through the application of systems

engineering principals including value engineering and lean six sigma methodologies to improve patient care

through and other systems improvements. Trained staff in system redesigns principals. Facilitate and train staff in

Rapid Process Improvement (Lean) Workshops to reduce waste and improve processes. Improved processes

through the application of lean six sigma and systems engineering methods and techniques including root cause

analysis, data analysis and value analysis methods.

4/2008 - 1/2009

Boeing, Inc., Everett, W A (On Contract)

Principal Systems Engineer

Principal Systems Engineering Consultant to the Boeing CORE Systems Engineering providing comprehensive

general systems and value engineering and project management support for the design and development of new

products and redesign of existing products for the Boeing 787 and 777 aircraft using Design for Manufacturing

and Assembly (DFM/A) and Value Engineering. Project manager assigned to manage the resolution of design and

quality issues with various engineering teams and partners involved with the Boeing 787 Dreamliner program.

Worked with multinational design teams to develop program plan, develop schedule, assign resources, maintain

and issues log and report status of action items to process major engineering changes from inception through

critical design review. Worked with design teams and product development to resolve quality and reliability

problems, reduce cost and weight, and improve performance through application and training in proven

improvement techniques including lean-six sigma, and value engineering. Facilitated Production Cost

Improvement Program (PCIP) workshops and Phase I LDBR workshops. Consulted with Product Development to

implement Market Driven Target Cost (MDTC) methods and techniques.

2/2006 - 4/2008

Boeing, Inc., Everett, W A (On Contract)

Principal Systems Engineer

Principal Systems Engineering Consultant to the Boeing 787 Dreamliner systems engineering team providing

requirements analysis and management including validation and verification of requirements necessary for

aircraft and production system certification by the FAA. Managed over 3,000 requirements in the company s

DOORs database controlling configuration management and working with stakeholders to prepare change

request to be presented to the requirements review board for approval. Analyze and recommend improvements to

be made to the overall systems architecture to better reflect requirements flow down and system interfaces.

James Wixson

abpjoo@r.postjobfree.com

208-***-****

2/1990 1/2006

Idaho National Laboratory, Idaho Falls, ID

Advisory Engineer/Project and Systems Engineer

The following positions were held by me at the Idaho National Laboratory in Idaho Falls, ID. My progressive

performance history of individual contributions and supervision, as well as progressive project team and project

scope size, leading to the success of key projects at the Idaho National Laboratory in Idaho Falls, ID resulted in

reduced cost, improved safety and reliability and superior project performance at this Department of Energy

owned, contractor operator facility. I was responsible for planning and earned value management on various

projects. Developed cost estimates and performed economic analysis for justification of various capital equipment

projects. I was the department s risk management focal responsible for the development of key project Risk

Management Plans and incorporating these plans into project documentation. I also worked in the Independent

Oversight organization identifying critical requirements and documents and developing lines of inquiry for auditors

and participating in key audits. I also gained considerable experience as a systems engineer working as a lead

engineer in requirements management responsible for identification, verification and validation of key project

requirements and documenting these requirements in project documents.

5/2005 - 1/2006

CH2M-WG Idaho, LLC, Idaho Falls, ID

Advisory Systems Engineer

Responsible for requirements analysis and management including verification and validation of requirements for

projects associated with spent nuclear fuel, nuclear waste cleanup and remediation at the INL. I Used advance

systems engineering methods and techniques to identify functions and requirements. I entered requirements into

requirements management software (Requisite Pro) to roll-down requirements originating in federal regulations,

industry standards, and other requirements documents to company implementation documents. Requirements

documents were used to facilitate compliance with requirements and for improving procedures and training of

project personnel. I also led the internal cross-function team to ensure development of the necessary technical

planning, budgeting, and risk management activities to keep the project on schedule and budget.

10/1999 - 5/2005

Bechtel BWXT Idaho, LLC, Idaho Falls, ID

Advisory Project Engineer

Lead and supported project teams responsible for the success of key projects at the Idaho National Laboratory.

As a Project Engineer and Project Manager I was responsible for planning and earned value management on

various projects. Developed cost estimates and performed economic analysis for justification of various capital

equipment projects. I facilitated the development of Risk Management Plans. Planned and executed Value

Engineering studies and worked with stakeholders to implement results.

Lead Systems Engineer on various other demolition and decontamination (D&D) projects.

Project Manager/Control Account Manager for the Clean-Close of the Radioactive Waste Management

Complex (RWMC) project in which I prepared budgets, tracked earned value and managed 12 sub-project

packages worth approximately $10M total. I used project management methodologies to track earned value

and develop estimates at completions (EACs) which were reported to Sr. Management.

W orked with the Department of Energy Sr. Field Office management and other stakeholders to develop

corrective action plans for sub-projects that were over cost and behind schedule and resolved interface issues

that developed on some of the sub-projects.

I was responsible for development of project management plans for key projects and organizations utilizing

advanced Industrial and Systems Engineering techniques and methodologies. I used using six sigma and

value engineering to improve performance on key projects.

Supervised and performed requirements analysis and flow down of requirements on key projects.

Project Manager for the Independent Oversight organization developing lines of inquiry and planning audits

for the Independent Oversight organization. Also, developed and managed the annual audit plan and

schedule for the department.

James Wixson

abpjoo@r.postjobfree.com

208-***-****

10/1994 - 10/1999

Lockheed-Martin Idaho Technologies, Inc. Idaho Falls, ID

Advisory Systems Engineer

I was responsible for requirements analysis and management including validation and verification of requirements

for projects associated with nuclear waste cleanup and remediation at the INL. I Used advance systems

engineering methods and techniques to identify functions and requirements required for system design. I entered

requirements into requirements management software (SLATE and DOORS) to roll-down requirements

originating in federal regulations, industry standards, and other requirements documents to company

implementation documents. Requirements documents were used to facilitate compliance with requirements and

for improving procedures and training of project personnel. I also led the internal cross-function team to ensure

development of the necessary technical planning, budgeting, and risk management activities to keep the project

on schedule and budget.

I also applied and developed advanced systems engineering concepts, to support various IT projects at the INL.

IT projects included the INL Site wide Information Network (SIINET) configuration management program, the INL

Narrow Band Trunked Radio Project. Other projects included the Pit 9 Staged Interim Action Project Stage II and

the High Level Waste Tank Farm RCRA Closure. I was responsible for supervision of 10 systems engineers in

requirements analysis and flow down, function analysis, risk identification and analysis in the development for

various project documents including Project Requirements Document (PRD), Systems Requirements Document

(SRD) and Technical Functional Requirements (TFR) in support of the Pit 9 Staged Interim Action Project Stage II

through conceptual design. I also Facilitated value engineering workshops, trade studies and documented

requirements.

Reliability Experience

Responsible for assisting reliability staff in root cause failure analysis to avoid future failures

Developed ideas on new product development and manufacturing processes

Performed the task of developing action plans to prevent failures and oversee their implementation

Responsible for using failure mode and effects analysis, design of experiments and other mathematical

models to ensure that products comply with the performance requirements of customers

Updated equipment data, PM's (Preventive Maintenance), task lists and diagnostic methods as necessary

to improve reliability

2/1990 - 10/1994

EG&G Idaho, Inc., Idaho Falls, ID

Industrial Engineering Specialist

Project Manager f or maintenance activities at the Radioactive W aste Management Complex (RWMC). Performed

project planning and budget preparation, tracked earned v alue, worked to resolve issues on v arious maintenance

sub-projects. Also, performed as Project Technical Lead on key projects including Department of Energy, Idaho

Field Office (DOE-ID) INEL (Tiger Team) Action Plan Task Force where I Facilitated the design of a root cause

analysis system using Management and Oversight Risk Tree Analysis (MORT) and Value Engineering

Methodology to support the development of corrective action plans to resolve key findings and root causes

resulting from DOE-HQ Tiger Team Audit to improve overall ES&H performance at the INEL. I also performed

various Industrial Engineering studies to improve performance and reduce cost. I was Project Technical Lead on a

Mail Room Automation project that resulted in automating the mail delivery process with autonomous robots and

automated the weighing and sorting operations.

6/1987 1/1990

Raytheon Aircraft, Montek Div., Salt Lake City, UT

Pricing and Contracts Administrator

Performed as Company Pricing and Contracts Administrator responsible f or the coordination, preparation and

delivery of price proposals to various commercial and DOD customers and developed Value Engineering Change

Proposals (VECPs) on applicable contracts. Implemented a Value Engineering program that achieved $6.4 M in

savings the first year and was instrumental in the win of a 5 yr long term business agreement with Boeing worth

approximately $300M for 737 & 757 Flight Control Systems.

Prepared cost estimates and bids f or company s flight control systems and ground based navigational aids

systems. Developed basis of estimates, defined work breakdown structure and developed statement of work f or

sub-tier estimates. Responded to DCAA audit requests and insured bids conformed to FAR Part 48 & 52

James Wixson

abpjoo@r.postjobfree.com

208-***-****

requirements. Also, implemented a Value Engineering Program and performed as Design-to-Cost Program

Manager responsible f or management of division design-to-cost (DTC), also known as Cost as an Independent

Variable (CAIV) efforts.

5/1983 6/1987

Raytheon Aircraft, Montek Div., Salt Lake City, UT

Sr. Manufacturing Engineer

Performed Engineering studies and developed a standard hour predetermined time system used in estimating

new and follow-on products for cost estimates on Boeing 737 and 757 Flight Control Systems, Electro-mechanical

actuation systems and ground based Navigational Aids and avionics systems. Performed work measurement and

work sampling studies to establish time standards and balance production systems. Performed Value Engineering

studies and worked with teams to solve design and production problems. Performed root cause analysis and

FMEA studies to establish causes and prevent product failures during testing and develop corrective actions to fix

these problems. Worked with interdisciplinary teams from engineering, manufacturing, test, procurement, etc. to

develop new products and improve existing products.

3/1983 5/1983

Sorenson Research, Abbott Laboratories, Salt Lake City, UT (On-Contract)

Industrial Engineer Consultant

Performed Industrial Engineering studies to improve performance and developed a standard hour predetermined

time system used in standard cost system to enable improved cost data for pricing of company products.

Identified numerous process improvements that resulted in significant cost savings and ergonomic improvements

in the production and packaging of the company s products.

5/1981 3/1983

EIMCO Mining Machinery Div., Salt Lake City, UT

Manufacturing Facilities Engineer

Developed physical layout and planning of major f acility consolidation of two manufacturing f acilities totaling

356,000 sq f t. to 208,000 sq ft. Also, I was project manager on other major facility upgrades and restoration

projects including 108,000 sq.ft. roofing project, sidewalk, curb, gutter, storm sewer and new driveways and

landscaping of 1 block area, planned and implemented new receiving conveyor system.

5/1980 5/1981

EIMCO Process Equipment Division, Salt Lake City, UT

Manufacturing Engineer

Planned process routings for fabrication and machining of parts for the companies filtration and waste

water systems. Responsible for major cost reduction ideas that eliminated unnecessary welding on

sheet metal components and unnecessary cleaning of large drum filters received from the vendor.

Worked with procurement to change specification to make vendors responsible for cleaning of parts

sent to the company. Estimated savings: $200K per yr.

2/1980 5/1981

Envirotech, Inc. Rubber Engineering, Div. Salt Lake City, UT

Industrial Engineer

Developed standard hour wage incentive program and planned new 20,000 sq. ft. of new manufacturing

space.

6/1979 2/1980

Sperry Defense Systems, Inc., Salt Lake City, UT

Associate Production Engineer

Developed process routings for assembly of avionics and other electronic equipment. Processed

engineering changes and resolved parts and tooling issues for assembly department.

James Wixson

abpjoo@r.postjobfree.com

208-***-****

PROFESSIONAL AFFILIATIONS

International Council on Systems Engineering (INCOSE)

Project Management Institute (PMI)

Society of American Value Engineers (SAVE)

American Society for Quality (ASQ)

Institute of Industrial Engineers (IIE)

Society of Manufacturing Engineers (SME)



Contact this candidate