Post Job Free
Sign in

Project Manager Plant

Location:
Beaumont, TX
Posted:
November 14, 2012

Contact this candidate

Resume:

Posted/Modified on: **/**/****

**:** PDT

Resume Title:

Master Planner Scheduler

Contact e-mail:

abphtm@r.postjobfree.com

409-***-****

Industry:

Oil & Gas

Desired Location:

Open

Willing to Relocate:

No

Desired Salary:

$61/hr - $75/hr

Michael R. Fontenot

825 Laura Ln.

Vidor, Tx. 77662

Home: 409-***-****

Cell: 409-***-****

E-mail: abphtm@r.postjobfree.com

Qualifications:

Sixteen Plus Years of Comprehensive Strategic Planning & Scheduling Experience Coupled

with Project Managing in Project Controls Oil and Gas & Chemical Industries.

Proficient in the Initiation, Preparation, Execution, & Termination Phases of Turnarounds

Master Planning and Master Scheduling Abilities for Oil and Gas & Chemical Industries.

Demonstrated Ability to Adapt and Implement Technological Changes.

Problem Solving Abilities, Including Root Case Analysis of Operational Problems.

Proficient in Cost Accounting Through Planning, Scheduling and Procurement Activities.

Proficient in Cost Estimating for Project Development Through Engineering Practices.

Proficient in all Primavera Enterprise Project Portfolio Software P6 P6.1, 6.2, P7.0,

P8.1

Proficient in SAP Logistics Software for Business & Customer Relations.

Proficient in SDK Software Development Kit for Primavera Importing & Exporting.

Proficient in MS MPP, MS Excel, MS Word, MS PowerPoint, MS Outlook.

Excellent Knowledge of Oil & Gas Industry Standards, Specifications, and Regulations.

Ability to Understand Engineering Documents, Codes and Brands.

Ability to Monitor and Report Project Budget, Schedule, and Scope Status.

Ability to Read Contracts and Interface Information Directly into P6 Schedule.

Excellent Knowledge of Cradle to Grave Scheduling from Concept, Design, Engineering,

Procurement, Logistics, Fabrication, Mechanical Completion & Systems completion.

Professional Experience:

Proficient in Gantt Charts Corresponding with Earned Value Analysis.

Proficient in Detailed P6 & P7 Job Plan Packages, (Resource and Duration Loaded).

Proficient in P6 & P7 Schedule Shell & Infrastructure to Include Calendars, Resource

Codes, Activity Codes, Project Codes, Global Codes & Filtering Codes Including Various

Layouts for Clients.

Proficient in Plastic Extruders, Cutters, Bath, Sleuth & Associated Attached Equipment.

Supported Bayer Chemical in a Project Controls Direction for a Successful Turnaround.

Supported Bayer Chemical for Solvent Wash, Phosgene, PHA Tank Farm & The Vent Gas

Scrubber / Incinerator Project Controls Management Needs.

Supported Bayer Chemicals Project Management & Construction Management needs for Cost

Efficiency & a Safe Path for Turnaround Execution.

Knowledge of Plastic Extruders, Towers, Pressure Vessels, Exchangers, Heaters, Reactors,

Tanks, Cyclones, Amine Units, Alky Units, Crude Units, Hydrogen Units, Diesel

Hydrotreater, Solvent Wash Units, Phosgene Units, Vent Gas Scrubber, Incinerators,

Makrolon Unit, & PUR Units.

Develop P6 & P7 Master Schedule for Process, I&E, & Mechanical divisions.

Supported JV Engineering Project Controls Efforts: Replace Valeros Three Rivers Refinery

Fluid Catalytic Converter Reactor (FCCU)-(FCC Rx) and associated Riser Top Temperature

(RTT), Selective Catalytic Reducer (SCR), and multiple Heater & Boiler Re-Tube.

Supported Becht Eng. Efforts to: Upgrade 26 Substations and 26

UPS Systems at Three

Rivers Tx. Valero.

Proficient in Setting Up & Developing Integrated P6 Master Schedule for Multiple Clients

and Execution Vendors.

Work with Valero Plant Manager & Construction Coordinators to Plan Field Activities.

Maintain Daily and Monthly and Reports for Project Controls Manager.

Developed a Primavera Infrastructure for Weatherford International Project Controls

Enterprises for All of Weatherford Corporate Locations Around the Globe.

Supported Weatherford International In Onshore & Offshore Operations and Developed Master

Schedules & Master Plans for Multiple Clients and Vendors.

Out to Sea Site Visits with Weatherford Int. for Hub & Flex Joint Progress Verifications.

Burrow Global Companies

Bayer Chemical Plant

Project Controls Senior Master Scheduler

Baytown, Tx. Aug. 2012 to Oct. 2012

Responsible for developing the Turnaround P6 Master Schedule for Bayer Chemical.

Assisted Turnaround Project Managers & Construction Managers in the Initiation,

Preparation, Execution, & Termination Phases of Turnaround Activities.

Chaired Steering Group meetings for Policy, Strategy and to Monitor Progress and

Performance of the Turnaround.

Assisted Project Managers & Construction Managers for the Direct Path in Negotiation

Complex Changes for the Turnaround.

Responsible for Detail Design of a Procurement Schedule, a Logistics Schedule, an

Execution Schedule, and a Termination Schedule for all Project Disciplines.

Responsible for Identifying Project Milestones & Key Aspects of Project Execution.

Developed Detailed Work Packages for Proper Step-Out of Each Scheduled Job for a Safe

Execution of the Turnaround.

Created Progress Curves and Assigning Resource Curves to a Resource Role.

Verified all Activities to Ensure Jobs can be done in a Safe & Proficient Manner.

Resource Loaded Man-Hours and Cost into the Primavera 6.2 Master Schedule, Including

Material, Equipment and Subcontractors.

Work with Project managers & Construction Managers to Plan Field Activities.

Assisted Plant Manager in the Development of Contingent Planning for Discovery Work.

Work Closely With Various Project Managers & Construction Managers to Analyze Turnaround

Performance.

Maintained Daily and Monthly and Reports for Project Managers & Construction Managers.

Worley Parsons Global Enterprises

Project Controls Senior Master Scheduler

BP/IntecSea/Computrols/Hebron

Houston, Tx. May 20, 2011 to June 2012

Developed a Primavera Project Controls Infrastructure for the Worley Parsons Global

Enterprises and associated Clients IntecSea, Computrols, BP, & Hebron.

Developed an Integrated Primavera P6 Master Infrastructure for Compatible Software

Exchanges Between Worley Parsons And Associated Clients.

Provided Project Controls Team with Required Data to Initiate the Plan.

Ensure Required Data & Resources within the Discipline; Execute & Monitor Work Scheduled,

Report Discipline Progress, & Implement Corrective Action.

Worked in Conjunction with the Project Controls Team to Develop Plans & Schedules.

Scheduled & Chaired Project Controls Team Meetings for Detailed Phases of Projects.

Report weekly Look-a-Heads and Critical Path Schedules to Contractor and Corporate

Reviews for Continuous Improvement for Project Organization & Quality Performance.

Conduct Weekly Staff Meetings Depending on the Phase of the Project.

Responsible for Cost Efficiency, Materials, Management, Scheduling, Construction, and

Contract Administration Activities for the Fabrication Yard Facilities & Our Employees.

Compile Design, Engineering, Procurement, Logistics, Execution, Start-up Procedures, &

Commissioning Progress Details into an Overall Primavera Progress System.

Developed Detailed Work Packages for Proper Step-Out of Each Scheduled Job.

Developed Detailed Work Books for Supervision and Foremen for Continued Progress.

Interface with Contractor Disciplines for Scope Definition (Design, Engineering,

Procurement, Logistics, and Construction.) To Develop & Maintain the Schedule and Progress

Databases as Required.

Weatherford International

Project Controls Senior Master Scheduler

BP/ExxonMobil/Shell/Conoco Phillips/Chevron

Houston, Tx. Oct. 07, 2009 to May 11, 2011

Developed a Primavera Infrastructure for Weatherford International Project Controls

Enterprises for All of Weatherford Corporate Locations Around the Globe.

Developed an Integrated Primavera P6 Master Schedule for multiple EPC Offshore Hubs for

Marine Well Containment Vessel Company & Stockholders: (BP/ExxonMobil/Conoco

Phillips/Shell/Chevron).

Analyze multiple Master Schedules for 5 Stockholders, 14 Execution Vendors, 6 Logistics

Teams, & 4 Engineering Firms to Ensure Primavera P6 Databases are in Sequence with In-

Progress Projects.

Ensure Contractor and Vendor Schedules for Onshore & Offshore Hubs are in Compliance with

Project Specifications.

Ensure Sub-Contractor Schedules for Offshore Flex Joint Installations are in Compliance

with Project Specifications, Federal Regulations, & International Regulations.

Maintain Project Related Primavera P6 Database Schedule Files, Codes, Calendars, etc.

Report Weekly Look-a-Heads and Critical Path Schedules to Contractor and Company Reviews

for Continuous Improvement for Project Organization & Quality Performance.

Conduct Weekly Critical Path Review Meetings with Contractor & Company.

Responsible for Cost Efficiency / Scheduling and Contract Administration Activities for

the Fabrication Yard Facilities.

Compile Design, Engineering, Procurement, Logistics, Execution, Start-up Procedures, &

Commissioning Progress Details into an Overall Primavera Progress System.

Developed Detailed Work Packages for Proper Step-Out of Each Scheduled Job.

Developed Detailed Work Books for Supervision and Foremen for Continued Progress.

Provide Schedule & Progress Measurement Updates to Weekly and Monthly Reports Per Project

Specification.

Interface with Contractor Disciplines (Design, Engineering, Procurement, Logistics, and

Construction.) To Develop & Maintain Schedule and Progress Databases as Required.

Becht Engineering

Eagle Ford Crude & Electrical Expansion

Lead T/A Planner / Scheduler

(Mechanical and I&E)

Valero Oil & Gas Refinery

Three Rivers, TX Jan 2009- Oct. 2009

Responsible for developing the Turnaround P7.0 Master Schedule for the Valero refineries

FCCU/FGRU/HGRU/SRU/DHT/ALKY Shutdowns and the Valero Electrical Reliability Expansion

Projects, also for all sub contractors & vendors.

Assisted Turnaround Manager in the initiation, preparation, execution, and termination of

Turnaround Procedures.

Co-Chaired Steering Group meetings for policy, strategy and to monitor progress and

performance of the Turnaround.

Assisted in the organization structure for the plant team in negotiation changes.

Developed detailed work packages for proper step-out of each scheduled job.

Developed detailed work books for supervision and foremen for continued progress.

Creating Progress curves and assigning resource curves to a resource role.

Verified all Activities to ensure jobs can be done in a safe & proficient manner.

Resource Loaded Man-hours and cost into the Primavera 7.0 schedule, including material,

equipment and subcontractors.

Work with Construction Manager to Plan Field Activities.

Assisted Plant Manager in the development of Contingency Planning for discovery work.

Work closely with various project managers to analyze contractor performance.

Maintained daily and monthly and reports for Project Controls manager.

Areva Engineering

Electrical & Crude Expansion

Lead T/A Planner / Scheduler

(Mechanical and I&E)

Total Chemical Refinery

Groves, Tx.

Nov. 2006 to January 2009

Assigned to the GIS Project (Gas Insulated Switchgear) and Turnaround for TOTAL

Petrochemicals Planning/Scheduling Team.

Responsible for detailed engineering and mechanical P6 Master Schedule for TOTAL

Petrochemicals.

Developed detailed work packages for proper step-out of each scheduled job.

Developed detailed work books for supervision and foremen for continued progress.

Developed Master Schedule for Total Refinery FCCU/FGRU/HGRU/SRU/DHT Turnarounds and all

sub-contractors.

Assisted Management TOTAL Petrochemical team in the initiation, preparation, execution,

and termination phases.

Primavera P6 to generate reports and look ahead schedules, and I&E coding.

Interfacing directly with client and contractor to ensure correct work scope, durations,

and resources are captured in schedule.

CDI Engineering

Lyondell Refinery

Lead T/A Planner / Scheduler

(Mechanical and I&E)

Houston, Tx. Jan. 2006 to Aug. 2006

P6 Planning and Scheduling all electrical and mechanical activities for Lyondell

Turnaround for multiple Unit Shutdowns FCCU/FGRU/HGRU/SRU/CRU.

Responsible for the development of P6 Master Schedule for Lyondell Refinery.

Responsible for developing detailed unit start up activities for unit operations.

Responsible for developing detailed work packages for multiple scheduled jobs.

Responsible for developing detailed work books for supervision and foremen.

Responsible for developing new infrastructure for document control library.

Walking down packages to insure proper step out is in accord with job.

Reported all significant changes directly to Project Manager.

ExxonMobil

LNG Terminals

Lead Planner/Scheduler

(Mechanical and I&E)

Sabine Pass, Tx.

Feb. 2005- Dec. 2005

Planned and Develop Primavera & MPP Master Schedule for ExxonMobils LNG 230 kV High

Lines, 230kV Substations, LNG Terminals, New Process Units, Refrigeration Units and

Pressurized LNG Sphere Tanks.

Reported all major changes directly to ExxonMobil Project Manager.

Developed detailed work packages for LNG Terminals, Substations, & High Lines.

Maintained daily and monthly Primavera reports for Project manager.

Budgeting and forecasting and generating monthly reports.

Cost reporting schedule and distribution list.

Co-Chaired formal agenda meetings to clearly define work objectives.

Review LNG, Substation and MCC data packages and specifications to procure materials from

Powell Industries.

Turner Group Corp

.

Conoco Phillips

Westlake Petrochemical Refinery

Lead T/A Planner / Scheduler

(Mechanical and I&E)

Sulphur, LA. July 2004- Jan. 2005

Planned & Scheduled all Multiple Unit Turnarounds for Conoco Phillips.

Field verified all jobs to ensure jobs can be done in a safe & proficient manner.

Reported significant issues directly to the Turnaround Manager.

Ensured the collection and collation of basic data.

Responsible for developing detailed work packages for multiple scheduled jobs.

Responsible for developing detailed work books for supervision and foremen.

Assisted in developing turnaround steering group ensuring the success of the Turnaround.

Advised steering group on specific Turnaround requirements.

Responsible for interacting with Vendors for procuring all turnaround material.

Maintained daily and monthly reports for Project manager.

Monitored Progress against turnaround objectives.

Integrated schedules from engineering, logistics, and subcontractors.

Turner Group Corp

.

Citgo Oil, Gas and Lubricants Refinery

Lead T/A Planner / Scheduler

(Mechanical and I&E)

Sulphur, LA March 2003- July 2004

Planned all turnaround projects and shutdowns projects for Citgo Oil.

Field verified all jobs to ensure jobs can be done in a safe & proficient manner.

Primavera Software and SAP were used for the planning and scheduling of turnaround.

Responsible for developing detailed work packages for multiple scheduled jobs.

Responsible for developing detailed work books for supervision and foremen.

Assisted in developing turnaround steering group ensuring the success of the Turnaround.

Responsible for interacting with Vendors for procuring all turnaround material.

Maintained daily and monthly reports for Project manager.

Monitored Progress against turnaround objectives.

Integrated schedules from engineering, logistics, and subcontractors

CB&I Constructors

Air Liquide Hydrogen Plant

Project Field Planner/Scheduler

El Segundo, CA March 2001- Feb. 2003

Planned all new capital projects for Air Liquide Hydrogen Plant.

Responsible for the day to day Project control and planning.

Field verified jobs to ensure jobs can be done in a safe & proficient manner.

Primavera Project Planner P3 for planning and scheduling activities.

Maintained weekly and monthly reports for construction manager.

Budgeting and forecasting, generating monthly reports.

Review engineering drawings and specification to procure materials needed.

SLC Southwestern Line Constructors

I&E Planner / Scheduler

Houston, Tx. November 1999- February 2001

Generating Primavera 3.1 schedules and reports for Siemens Companies.

Produced P3 schedules and reports for Siemens Project Manager.

Managed turnarounds, maintenance, and working with engineering.

Procured all materials for job site including mechanical, electrical and civil materials.

Working Industrial process duties include troubleshooting installing and maintaining

plant electrical systems. Installation of switchgear and MCCs.

Knowledge and use of Productivity tools:

Proficient in MS PowerPoint, MS Access, MS Word, MS Excel

Proficient in SDK Software Development Kit

Proficient in Primavera P6 Enterprise Project Portfolio 6.2

Proficient in Primavera P6 Enterprise Project Portfolio 7.0

Proficient in Primavera P6 Enterprise Project Portfolio 8.1

Proficient in Microsoft Project 2003-2007

Email: abphtm@r.postjobfree.com

Cell: 409-***-**** Home: 409-***-****



Contact this candidate