Post Job Free
Sign in

Manager Quality

Location:
Raleigh, NC
Posted:
November 11, 2012

Contact this candidate

Resume:

Title:Resident Manager/Registration Manager/Recruitment Officer

abphch@r.postjobfree.com

Document

Source below

NAME:,

ADDRESS:

ADDRESS2:

CITY:

STATE: NC

ZIP:

CANDIDATE ID: 2924676

US CITIZENSHIP:

EDUCATION:

EXPERIENCE: 0

WILL RELOCATE: No -

JOB WANTED:

RATE NEEDED:

TELEPHONE: 919-***-****

EMAIL: abphch@r.postjobfree.com

HOMEPAGE:

COMMENTS:

HOTTEST SKILLS: product, liability, audit, inventory, lease, purchasing, market,

marketing, profit, strategic, chemist, chemistry, emergency, injection, membrane, mold,

osha, profit, restructuring

REVISION: 08-SEP-02

RESUME:

NAME: JOHN HONEYCUTT

ADDRESS: 109 HUDSON ST.

RALEIGH, NC 27608

CITY:

STATE:

ZIP:

COUNTRY:

CANDIDATE ID: NA

EXPERIENCE: Not Entered

DESIRED POSITION: Not Entered - See Resume

WILL RELOCATE: Not Entered

US CITIZENSHIP: YES

JOB WANTED:

EDUCATION: Not Entered

RATE NEEDED: Not Entered

TELEPHONE: 919-***-****

EMAIL:

HOMEPAGE:

COMMENTS:

HOTTEST SKILLS:

JOHN HONEYCUTT

109 HUDSON ST.

RALEIGH, NC 27608

^919-***-****

abphch@r.postjobfree.com

Professional Summary

Certified Quality Manager and Auditor with experience in technical

management of the Quality System. Demonstrated success implementing

ISO 9000 and Total Quality Management. Strong Failure Analysis and

Reliability Engineering background in the computer industry.

Education

BA

Chemistry, Biology, Macalester College, St. Paul, MN ASQC Certified

Quality Manager ASQC Certified Quality Auditor Total Quality

Management Executive Seminar, 3M Corporation Total Quality Management

Facilitator Seminar, Memorex Telex Internal Training Team

Facilitation, Memorex Telex Internal Training UL Safety Standard 1950,

Underwriters Laboratories

Quality Assurance Manager

Managed Quality Assurance Group, responsible for all aspects of the

Quality function, including Reliability Engineering, Component

Engineering, Manufacturing Product Assurance Engineering, Auditing,

Supplier Quality, and Organizational Development.

Led a successful effort to obtain ISO 9002 registration for computer

manufacturing and distribution facilities. Served as lead auditor for

internal and supplier site audits.

Initiated and drove effort to improve Order Integrity defect rates,

based on customers' complaints. Crossfunctional improvement plan

modified production procedures, reduced monthly complaints from 95 to

less than 10.

Pioneered Cycle Time Analysis to improve discrepant material returns

process. Turnaround time dropped from 21 days to 3 days. Inventory was

reduced by $700,000.

Created standing, crossfunctional, Process Improvement Teams to bring

design, assembly, purchasing and other key personnel to focus on

process barriers. Significant improvements in product quality, process

efficiency, and employee involvement resulted.

Reliability and Failure Analysis Manager

Managed Reliability and Failure Analysis Laboratories responsible for

qualifying all inhouse designs, purchased components, and

subassemblies. Qualified monitors, personal computer motherboards and

features, performed factory and field failure analysis.

Introduced innovative reliability engineering protocol for design

analysis of a major personal computer product line. Isolated many

design defects, improving field reliability by 30% compared to

previously released products. Protocol became standard for all

products.

Implemented a disciplined test plan system for all reliability and

qualification activity. Managed these test plans for internal

qualifications and monitoring qualification activities performed by

suppliers.

Leadership

Chaired the team to rewrite the Product Life Cycle Process. Defined

responsibilities and administrative controls to organize and speed

product introductions.

Led in a collaborative design effort with a major keyboard vendor to

replace a defective design, based on my detailed failure analysis of

the original product. Specified performance and acceptance criteria to

prove reliability of new design.

Chaired interdepartmental team for the controlled introduction of

noclean solder flux in three wave solder process lines. Received a

merit award for this achievement, citing annual cost savings exceeding

$1.2 million in waste reduction.

Implemented a Change Management plan to transition company through

major change of strategic direction and downsizing

Initiated and implemented OSHA Hazardous Materials RighttoKnow program

plantwide as sole responsible engineer. Created purchasing control

system for 800 chemicals. Wrote all training materials, monitored

program compliance.

Technical Achievements

Determined from field failure data that memory for server products was

incorrectly specified, causing failures and installation delays.

Respecified memory reduced failures, saving $465,000 annually.

Negotiated with vendor, who replaced memory worth $375,000.

Produced industryleading connector specifications based on extensive

analysis of connector failures. Connector failures at customer sites

decreased dramatically.

Produced a verifiable model for recording head static friction causing

data disk destruction, using electron microscopy. Received a merit

award for solving this important problem.

Developed an automated process control system for simultaneous

measurement of thickness and composition of plated metal layers by

Xray Fluorescense. Produced and certified all standards.

Determined cause of failure in capacitive keyboard by making

microscopic measurements of membrane creep that occurred during

assembly. Forced vendor to produce a less sensitive, noncapacitive

design.

Proved insulation degradation in defective transformer windings by

thermal analysis. Vendor reimbursed my company $350,000 in field

replacement costs.

Community

Board of Directors of two nonprofit Community Theater Groups. Served

on United Way Funds Distribution Panel for Priority I agencies.

Employment History

Memorex Telex Corporation, Raleigh, NC (19841996

)

Product Quality Manager, PCs and Servers (

Reliability and Failure Analysis (

19891993) Senior

Component Engineer

(19841989

)

Peripheral Components, Inc

., Minneapolis, MN (19821984

)

Senior Scientist, Process Control Lab Supervisor

(19821984

)

Control Data Corporation, Minneapolis, MN (19781982)

Senior Scientist, Materials Lab Supervisor

(19781982)

Awards

Memorex Telex Marketing "Service to the Customer" Award (1996) Memorex

Telex Quality Cup Award Nominee (1996) Memorex Telex Merit Award for

implementing "Noclean" Solder flux Plantwide (1989) Control Data

Corporation Cost Savings Award (1981) Control Data Corporation Service

Award for emergency analysis of printed circuit board residue (1981)

Control Data Corporation Achievement Award for modeling the cause of

disk drive "Stiction" Problem (1980) Control Data Corporation Cost

Savings Award (1979)

Quality Management Skills

Excellent Oral and Written Communicator Applying Quality Principles to

Design, Production, Administrative, and Field Environments Effective

Team Leader ASQC Certified Quality Auditor ISO 9000 Implementation

Computer literate with analytical and office software Total Quality

Management Trainer

Technical Skills

Reliability Determination of Digital and Analog Electronic Assemblies

Failure Analysis of Electronic, Electromechanical, and Mechanical

Assemblies. Failure Analysis of Injection Molded Plastic Components.

Reliability Determination by Failure Mode Effects Analysis. Electron

Microscopy Chemical Analysis by Xray Microanalysis Chemical Analysis

by Inrared Spectroscopy

Explanations of Hypertext References

Cycle Time Analysis

Cycle Time Analysis creates efficiencies in repetitive business

processes by focusing on the time it takes to complete the cycle. All

prioritization is ignored other than timetocompletion and error rate.

In our application of this technique, smooth operating procedures were

created that eliminated the need for constantly expediting the most

urgent items. After about six months of persistent application, we

eliminated over two years' back inventory of discrepant goods, and

consistently maintained less than one month's backlog. These

techniques can be used for all business processes.

Process Improvement Teams

Process Improvement Teams were an effective application of J. Edward

Deming's "Quality Circles" to Memorex Telex's Manufacturing Operation.

Representatives of all departments concerned with design, assembly, or

materials met weekly to resolve problems that previously had gone

unrecognized.

Action items were tracked, and process barriers fell. Employee morale

rose. Defect rates and process times dropped.

Certified Quality Manager

The American Society for Quality Control certified Quality Managers on

the basis of a fourhour examination on the specified body of

knowledge. A member of the charter class of CQMs, I hold certificate

number 534.

Order Integrity

An Order Integrity error occurs when a shipment does not match the

order. For example, the wrong quantity, wrong accessory, or a missing

feature would be an order integrity error.

Customer complaints alerted us that the error rates were much too

high. I organized a team to analyze the root cause behind each error

and propose corrections. Over 30 different changes were made to the

assembly floor layout, product labeling, order printing, and the

assembly procedures to make the process selfcorrecting and less

errorprone.

Design Analysis

Our design analysis protocols were used for analog assemblies like

monitors and power supplies, and for digital assemblies like PC

motherboards. These tests were better predicters of production

failures and field lifetime than standard burnin or life tests. They

were also less costly.

To analog designs we applied the principles of component derating to

make certain that the power, temperature, current and voltage levels

were below specified maximums for long life. We also developed an

algorithm to estimate accurately the lifetime of electrolytic

capacitors. The algorithm was accepted by all of our vendors.

Digital designs were tested by analyzing signals to ensure all

timings, ringing, voltage and other variables were near the center of

the specification limits for each component. The results of this

analysis reduced the production and field failures to such an extent

that all engineering managers set this analysis as a standard before

product release.

Insulation Degradation

Insulation of the transformer windings failed early in the warranty

period. Using Thermal Analysis, we proved that the wire insulation

inside the failed transformer melted at a much lower temperature than

identical, new, transformers.

The vendor had already reached the same conclusion, but continued to

deny fault until our results conclusively proved early degradation of

the insulation.

Product Life Cycle Process

The Life Cycle Process was developed to coordinate planning for the

introduction of new products from the concept stage through design,

manufacturing, customer shipments, servicing, and end of life.

The process we devised used a set of interlocking plans from each

stakeholding group, coordinated by a program manager. Each group kept

its own schedule. The program manager was responsible for maintaining

the overall schedule, negotiating conflicting priorities, and

resolving problems.

Previously, the tasks required to introduce a product were performed

haphazardly, which resulted in delayed projects, tasks not performed,

and expediting of lastminute requirements.

Collaborative Design Effort

This effort was initiated after multiple failure modes of the

defective keyboards convinced my company and the vendor that a total

redesign was needed.

I acted as primary liason for my company through the design process,

specified all qualification activities, and oversaw the introduction

of the process into manufacturing. Parallel qualification tests were

performed under my supervision.

Change Management

Change Management was designed to prevent my company from floundering

during a major restructuring. The program was organized to provide

analytical tools for each functional group to organize its key

activities into distinct processes. The result of this activity was

streamlined, consistent business processes that eliminated confusion

about tasks and responsibilities.



Contact this candidate