FERNANDO TARAFA

2 Old Dobbin Lane

abpapv@r.postjobfree.com

Ivoryton, Connecticut 06442 (H) 860-***-**** (C ) 860-***-****

Summary

Management professional with over 25 years experience providing project controls services

to all size projects. Experience providing project controls services to many diverse

projects. Strengths include: effective communicator, excellent problem solver, adept at

making project presentations to all levels of management, able to work independently and

as a team member.

Software Experience

MS Excel MS Word MS PowerPoint MS Access

MS Project Enterprise Project Management MS Visio INDUS Passport

Primavera P3.1, P3e, P5, P6, P7

STORMS (Severn Trent Operational Resource Management Sys) eMIB (electronic Management

Information Base)

EXPERIENCE

Siemens Fossil Services, Inc

Orlando, Florida April 2012August 31, 2012Outage Scheduler International Group

Assigned as Outage Scheduler to the Latin American/Caribbean Services Group responsible

for developing MS Project (2003) outage schedules and provide field support for

inspections and maintenance of turbines and generators.

Central Termoelectrico de Ventanilla 33, Venatnilla, Peru June 04, 2012July 05, 2012

Developed MS Project (2003) outage schedule for major turbine inspection/maintenance

(including full rotor disassembly) of a ) combined cycle V84.3A1 Turbine.

Provided outage scheduling support including daily management reports.

Central de Ciclo Combinado Norte Durango, Durango, Mexico April 2012

Developed MS Project (2003) outage schedule for minor combustor and generator

inspections for two(2) combined cycle W501F Turbines.

Provided outage scheduling support including daily management reports.

ProEnergy Services Company, Sedalia, Missouri October 2010March 2012

Bi-Lingual Scheduler

- Venezuela

Electricidad de Caracas La Raisa Phase II Power Plant

January 2010 March 2012

Provided (2) site coverage due to shortage of scheduling support.

Provided P7 scheduling support of over 15,000 activities for construction and

commissioning of (2) LM6000 Gas Turbines.

Worked with Discipline Construction Supervisors to re-schedule existing work activities

based on available manpower and materials, and identify and schedule remaining work

activities.

Provided weekly Primavera schedule reports consisting of Progress S-Curves, Summary By

Disciplines, and Three(3) Week Look Ahead.

Electricidad de Caracas Guarenas Power Plant

(2) LM2500 & (2) LM6000 June 2011March

2012

Assigned to Project with construction at 60 percent complete. Schedule converted from

MSProject to Primavera P7 level 5 detail schedule. Incorporated work activities for

substation construction.

Coordinated work activities between Cost Engineer, national procurement, QA/QC, and

Discipline Supervisor.

Interfaced between national and ex-pats for work activities.

Provided P7 scheduling support of over 10,000 activities for construction and

commissioning of (2) LM2500 and (2) LM6000 Cycle Turbines.

Provided weekly Primavera schedule reports consisting of Progress S-Curves, Summary By

Disciplines, and Two(2) Week Look Ahead.

Coordinated accelerated work schedule for the completion of the (2) LM2500 Units.

ProEnergy Services Caracas Office

February 2011June 2011

Assigned to Caracas office to evaluate Construction completion of various projects.

Provided MS Project to Primavera Project Schedule conversion of various projects.

PDVSAs Morichal Power Plant

(2) LM6000 August 2010February 2011

Assigned to EPC project until postponed at 8 percent construction complete due to lack

of payment from client.

Providing MS Project 2007 scheduling support.

Interfaced between Engineering, procurement, document control, QC/QA, construction, and

clients.

Provided daily construction and weekly EPC status reports to client.

Held two(2) week look ahead meetings between contractor and construction in order to

identify manpower and equipment requirements.

Northeast Utilities, Berlin Connecticut September 2009September 2010Yankee Gas

Scheduler Capital Construction Gas Projects

Developed P6 Schedule Templates for basic construction of Gate Station, CDOT

Relocation, and New Business gas projects.

Review, update, and categorize approx 400 Projects. Process required use of STORMS

(Work Management System), MIBS (Work Order Accounting System) to determine Project status

and remaining work.

Developed high level Project layouts to identified active Projects within four (4) work

centers.

Provided mentoring of junior planner in the use of Primavera P6.2.1, scheduling

methodology, Resource loading/levelizing and creating and use of baseline schedules.

Established routine for transferring via Report generator of P6Resource information

into Excel Graph.

Project Controls Service, LLC

May 2009October 2010

Developed proposal schedules utilizing Client-based Primaveras P6.2.1 for Biomass

Fuel, Combined Fuel Cycle and simple cycle projects.

Assisted independent contractors in conversion of Microsoft Project Schedules to

Primavera P5, P6 & P7 Schedules.

The Shaw Group

February 2009May 2009Entergys Pilgrim Nuclear Power Station, Plymouth, Massachusetts

Senior Outage Scheduler

.

Developed resource loaded refueling outage schedule in Primaveras P5.

Developed P5 outage reports.

Established web publishing routine for running and posting of Refueling Outage

Schedules and Reports to Plant Web site.

Utilized MS Access and Excel for updating the Outage Schedule from various site

programs, including INDUS.

The Pike Company, New York, New York March 2007December 2008

Project Controls Manager

(01/200812/2008)

LEnergy Power Plant Repowering & retro

-fit project of 80MW Combined Fuel with a Rolls

Royce Trent 60 in Lowell, Massachusetts

Unique project as all piping systems were required to be refurbished due to degraded

conditions.

Established and maintain a work breakdown system (WBS) for tracking time & materials in

Excel and utilized for Cost distribution.

Provided and tracked Budget and Cost estimate to complete based on Earned Value.

Developed and maintain a P3 construction and start-up schedule and coordinated

integration with engineering schedules.

Provided Senior Management weekly construction report incorporating Excel spreadsheets

and charts.

Developed MS Access database for tracking of equipment and material deliveries.

Senior Scheduler

(03/200702/2008)

Developed P3 proposal schedules for existing building renovations and new construction

projects.

Developed and maintain P3 construction schedules for various high rise facilities.

ISO

-New England, Holyoke, Massachusetts November 2003March 2007

Database Administrator/Developer

(01/200603/2007)

Enterprise Risk Management Group - Corrective Action Program development.

Interim MS Access Database Administrator/developer for QMS Corrective Action/Preventive

Action tracking system

Database documentation.

Project Controls Analyst (11/2003 12/2005)

Program Management Office (PMO) - development of a Quality Management System (QMS) within

the ISO-NE organization.

Developed MS Access pilot database for Issues and Corrective Action tracking.

Developed & maintained in MS Project (22) subprojects in an integrated resource loaded

project schedule.

Tracked and provided Project cost status.

Incorporate and maintained the Project Schedule in Enterprise Project Management MS

Project Server.

Assisted Project Manager in the development of project charter, budget and management

presentations and reports.

Provided quarterly budget forecast.

Assisting in the development of a Records Control and Document Control process.

Northeast Utilities, Berlin Connecticut 20032004

Project Controls Analyst

(01/200302/2004)

Provided consulting project control services to the Program Management Office (PMO).

Assigned to the development of an Electronic Dispatch System.

Developed and maintained an integrated resource loaded P3E project schedule.

Advised management on schedule status, and developed alternate solution to problems and

schedule conflicts.

Coordinated effort with project team members to develop an accelerated (schedule

recovery) plan.

TLG Services Inc

., Bridgewater, Connecticut 2001 - 2002

Assistant Project Manager/Project Controls Analyst

(09/200111/2002)

GPUs Saxton Nuclear Experimental Corporation Containment Vessel Concrete Removal

Project.

Unique project as structure required to be anchored to prevent uplifting during concrete

removal.

Monitored all project activities associated with the development of engineering

deliverables, cost and budget control, procurement, and management of contract work

forces.

Provided and tracked Budget and Cost estimate to complete based on Earned Value.

Developed and maintained MS Project construction schedule.

Utilized MS Excel for developing reports and charts.

Assisted Project Manager in directing work activities.

Dominion Nuclear Connecticut, Waterford, Connecticut 20012001Senior Work Planner, Millstone Unit 2 & 3 (04/2001 08/2001)

Developed/planned work orders for engineering work activities, and repetitive condition

monitoring work.

Providing support in the conversion of preventive maintenance work orders from a manual

regenerating process to an automatic process.

Northeast Nuclear Energy Co

., Waterford, Connecticut 19932001Senior Work Planner, Millstone Unit 3 1155 MW

Developed/planned work orders for engineering work activities, and repetitive conditions

monitoring work.

Provided Work Planning Development support in development of performance indicator

graphics in Microsoft Excel.

Provided Microsoft Access support to the parts department for tracking parts for

outrage related work orders.

Developed an Engineering Work Tracking (EWTS) database, using Microsoft Access that

tracked engineering deliverables through implementation and closeout.

Developed process to integrate the PMMS work order system into the EWTS database.

Integrated the PASSPORT parts ordering system into the EWTS through the use of Excel

and Access programs.

Developed Microsoft Access reports that provided Engineering deliverables with

associated work orders and parts. These reports were instrumental in identifying,

monitoring, and implementing work activities during the recovery of M3.

Lead Project Planner, MP 3 Engineering Backlog Reduction

Provided work priority direction to Engineering/Design Team for field implementation.

Provided project controls functions through the development of a resource leveled

project plan.

Provided monthly-earned value progress reports.

Provided project reports/documentation in response to NRC requests and upper management

commitments.

Northeast Utilities Service Co, Berlin, Connecticut 19801992Lead Project Planner, Millstone Unit 2 882 MW - Steam Generator Replacement

Provided planning and scheduling support for the development, maintenance, and monitoring

of project schedule.

Coordinated work effort of three (3) schedulers assigned to the project.

Coordinated work activities of SGRP planning staff consisting of contractors and

vendors planning staff.

Coordinated the integration of A/Es engineering and construction schedule into the

project schedule.

Interface with outage planning group to develop an integrated replacement/ refueling

schedule.

Monitored A/Es schedules and reported to Project Manager on overall status.

CERTIFICATES

OSHA 10-Hour Construction Safety (2012)

EDUCATION

M.B.A

., Rensselear Polytechnic Institute, Hartford, Connecticut

B.S

., Construction Engineering Technology, Florida International University, Miami,

Florida

Certificate of Completion, Ironworkers Local Union 403, West Palm Beach, Florida

A.A

., Building Construction, Palm Beach Junior College, Lake Worth, Florida



Contact this candidate