Franklin W. Nelson
Project Controls Specialist / Master Scheduler
Selected Experience
2011
October 2012AKER SOLUTIONS. Senior Project Scheduler at DuPont, Memphis plant
Developed and maintained weekly updates for the Master Project schedules for Dupont
Engineering & Construction Schedules projects. I was senior scheduler for all major TAR
(Turn Arounds) using Microsoft Project 2003 and Oracle P6.7. Also used SAP maintenance
module.
CH2M HILL
- 2008 to 2010 (contract)
Senior Project Controls Specialist
(Anchorage, AK)
Assisted project management in setting up cost control, WinEst estimating and schedule
procedures for the engineering and construction of the upgrading of the Arctic Oilfield
Hotel in Prudhoe Bay, Alaska. Duties included weekly cost reporting, estimating and
schedule preparations. Attending meetings, training and helped in the integration from an
existing management system to Oracle.
Project Services Group / LES, Inc
. - 2007 to 2008 (contract)
Senior Project Scheduler / DBA (Eunice, NM)
Helped developed and maintained weekly updates as a DBA for the Integrated Project
Schedules (IPS) for the construction of National Enrichment Facility (Nuclear) In Eunice,
New Mexico. Developed schedules for IROFS, ORRs, Security, Training, Procedures, Systems
and creation of additional activities for the interface of all NRC related activities
within the P3 Integrated Schedule. Trained entry level schedulers to be productive in
scheduling of all sub-projects. Trained schedulers in the use of documentum. Converted the
P3 schedule to P6. Approximateluy25,000 activities
LURGI, Inc
. 2006 to 2007 (contract)
Senior Project Scheduler
(Memphis, TN)
Developed and maintained weekly updates for the Master Project schedules for two Bio
Diesel projects. Schedules were developed with Engineering and Construction activities
that were cost and resource loaded. Developed charts and graphs in Microsoft Excel from
information contain within P3.
CH2M HILL 2000 to 2006 (permanent)
Project Controls Manager / Scheduler
(Memphis, TN)
Developed and implemented the Master Project Schedule by using sub-projects within
Primavera Project Planner (P3 & P3e/c) with cost and resource loaded design and
construction schedules provided by design firms and construction contractors. Interface
Project Management (Expedition) to P3e/c for costing and invoicing. Supervised the
document control and project controls department.
Senior Project Controls Specialist
(Ft Lauderdale, FL)
Developed and implemented the Master Construction Schedule by using sub-projects within
Primavera Project Planner (P3) with cost and resource loaded construction schedules
provided by various contractors. Helped in the rewriting of CH2M's Specification 01310.
Interfaced with various construction projects with Expedition, allowing inspectors in the
field to update their project schedule on a daily basis when writing their daily reports
in Expedition. Thus, maintaining continuity between owner and contractor. Assisted in the
interpretation of contractor schedules regarding time and cost disputes that could lead to
potential claims.
Senior Project Controls Specialist
(Israel / Palestine)
Instrumental in setting up the initial cost controls and Primavera construction schedule
prior to going overseas. Interfaced with owners, CH2M project management and project
design group on a daily basis as well as with estimating and procurement.
Instrumental in setting up the initial cost controls and Primavera construction schedule
for this project. Worked with the local government finance minister and with USAID finance
management.
Trained local employees in using Primavera P3, creating and maintaining the WBS and
weekly / monthly updating of the schedule and producing quality monthly reports. I
interfaced with all levels of Israeli and Palestinian management on a daily basis.
Senior Project Controls Specialist
(San Diego, Ca)
Constructed and managed an integrated Primavera schedule for the construction of seven
separate Pratt & Whitney generations sites located throughout California. Interface with
Owner management as well as with the general contractor in the implementation of this very
fast tract construction and startup schedule.
Was instrumental in setting up the initial cost controls and Primavera construction
schedule prior to going overseas. Interfaced with the IDC design group on a daily basis as
well as with estimating, procurement and IDC Project Management.
Senior Project Controls Specialist
(Phoenix, AZ)
Provided Cost Control and P3 schedules for the installation of eighty six (86) tools for
the manufacture of semi-conductors. Interfaced with owners project management on a daily
basis. Project was a fast track project lasting less than 4 months. Expedition was used to
help manage the paper flow for this fast track project and was instrumental in salvaging a
considerable claim.
3DI International
1998 to 2000Project Controls Engineer
(Washington DC)
The renovation of the Pentagon a 7,000,000 square foot, 50 year old government facility.
I was the Senior Primavera scheduler for the IM&T Backbone, project wide. I scheduled the
construction and installation of all copper and fiber optic cabling from Bell Atlantics
communication manholes to communication equipment rooms and telecommunication closets to
the setting of phones and computer systems in the various government tenant spaces. I
interfaced with all levels of management on a daily basis in the scheduling and
construction of new phases of work. I was personally responsible for over 7000 activities
in a 30,000 activity integrated schedule.