I am seeking a Planner, Scheduler, Estimator, Superintendent / Supervisor position within
the oil, gas, and/or power industrial markets. I have over 28+ years of experience in the
construction industry and possess the knowledge and skills to lead assigned crews in daily
activities to ensure a successful project outcome. I have extensive experience in
preparing bids, estimating and planning work, and directing crews through completion of a
variety of construction projects.
Experience
Turner Industries
JUN
. to Present
CCU/SSB T/A 2012
Planning/Scheduling/Estimating in P6-V7 Primavera Also Addendums FCOs, Material: Long
Lead Ordering To Spec and Tracking, Cost Tracking, Implementing Contractor/Vendors
Estimates into Schedule
Sep. to Nov. Nov. to Jun. 2012
Ollephins 3 2011 T/A CFHT/A 2012
Planning/Scheduling/Estimating in P6-V7 Primavera Also Addendums FCOs
Phoenix Services
HyCo Unit
Jan. to Aug
Linde Gas at Celanese Clear Lake Tx.
P6 V7 Scheduler Estimator
Build T/A Schedule in WBS Format
Create Codes and Resources and Look Aheads
Progress Daily Updates
Building Job Packages, Contractor Job Walks for T/A Quotes, Estimating Both Capital and
T/A work. Primavera P6 V7 Scheduler
Ordering all Material, Tracking Long Lead Items. Building Contractor Bid Packages For
Corporate to Send to Companies for Bids.
TIMEC Company Inc
.
2009
to 2009Planner/Scheduler/Estimator
for the CRU-3 HCU GCP and the DCU. Depropanizer Tower,
Deethanizer Tower, Sour water Flash Drum replacements and all piping Involved At the
Tesoro Petroleum Refinery in Wilmington Ca. 90810
TIMEC Company Inc
. Jan. 2008 to Jan. 2009Planner/Estimator
for PTR/PrTr Oct. 2008 Turnaround at Exxon Mobil Torrance CA Refinery
Turn-Around Planning and Field Packages generation for preparation of major turn-around
execution plans
Cost estimating for above turnaround event, as well as other refinery major maintenance
projects
KAP PROJECT SERVICES, EL SEGUNDO, CA 2005 to 2008PLANNER P3E Scheduler
Plan and schedule workflow for each department and operation according to previously
established manufacturing sequences. Prepare work packages for use by client and
contractors that include all relevant documents, drawings, specifications, and material
lists necessary to ensure accurate execution during a project/turnaround.
Confer with department supervisors and engineers to determine status of assigned
projects.
Field-walk jobs to obtain necessary information to plan and estimate. Provide
information to client of discrepancies found in engineering work orders. Input field-walk
data/estimates into database. Confer with scheduler to ensure accuracy in schedule.
Prepare purchase orders to obtain materials, tools and equipment.
Review material lists for conformance to company-standard practices in regards to parts
and materials used.
Arrange in-plant transfer of materials to meet production schedules.
Coordinate for upcoming turnaround projects.
KAP PROJECT SERVICES, Sun Ray, TX 2005 to 2005Planning P3E Scheduling
Planned, Scheduled, T/A
Measured and evaluated effectiveness of safety program using established goals.
Maintained required records.
REPCON, LA PORTE, TX 2004 to 2005CRAFT SUPERVISOR
Interpreted specifications, blueprints and job orders to determine personnel and material
requirements. Assigned work to supervisors. Inspected work in progress to ensure all work
conformed to specifications and that construction schedules were followed. Conferred with
and directed supervisory personnel and subcontractors engaged in planning and executing
work procedures.
DE JEAN COMPANIES, LA PORTE, TX 2003 to 2004SUPERINTENDENT
Directed supervisors in the demolition of an exchanger and reactor head and installation
of a new exchanger and reactor head. Laid out, assembled, installed and maintained pipe
systems, pipe supports and related hydraulic and pneumatic equipment for steam, hot water,
heating, cooling, lubricating, sprinkling and industrial production and processing
systems. Selected type and size of pipe and related materials and equipment, according to
specifications. Job completed on-schedule and within budget.
REPCON CONSTRUCTION, DEER PARK, TX 2003 to 2003GENERAL FOREMAN
Coordinated/supervisor Turnaround
. Met with client and engineering on a daily basis for
updates and progress reports. Verified piping dimensions and spools prior to installation.
Coordinated piping towers and exchanger work to maximize work to ensure minimal downtime.
Work was completed ahead of schedule and in a safe manner.
VARIOUS, TX, TN, LA 1985 to 2003SUPERINTENDENT / GENERAL FOREMAN
Performed in the capacity of Superintendent / General Foreman
for a variety of companies,
such as Zachary Construction, CMI Construction, H&H Construction and Harmony Construction
working in the Oil, Gas & Power Industry. All required the ability to interpret drawings
and specifications, coordinate and assign work to subordinates, order material, and
communicate on a daily basis with client and contractors and ensure a timely and safe
completion of each job.
Education
Ganado High School,
Ganado, TX 1983
H.S
.
Bee County College,
Beeville TX
Oil and Gas Technology, Mechanical Drafting
Skills
I feel that my past experience will allow me to plan, estimate schedule and execute jobs
in a very efficient manor.
Piping and Structural Qualifications: Experienced in Planning, bidding and estimating
jobs, material and equipment to execute work.
Coordinating all aspects of the job, ordering Long Lead items and Tracking them.
Planning Contingency Plans/ Planning Logistics.
Experienced in interpreting Ortho's, P&ID's and Isometric Drawings, C- CAD, Mech.
Drafting.
Experienced in Material Take-Off.
Experienced in Mobilizing and Demobilizing workforce.
Training
Primavera P6 V7 Successfully Passed Basic and Advanced Course PMO Link
P3E Training
TWIC Card
Contractor Coordinator
Supervisory Training Course
OSHA Safety Training Courses
Scaffold Competency by the State of Texas
Welding Procedure / Examination Course
NCCER Inst
Operator Certified (35 tons)