Construction Project

Location:
Houston, TX
Posted:
December 08, 2012

Contact this candidate

Resume:

Posted/Modified on: **/**/****

**:** PDT

Resume Title:

Richard Castillo

Contact e-mail:

*******@*****.***

832-***-****

Industry:

Refineries

Desired Location:

Open

Willing to Relocate:

Yes

Desired Salary:

> $105,001/yr

Planner / P6 V7Scheduler / Estimator

Contractor Coordinator

Summary

I am seeking a Planner, Scheduler, Estimator, Superintendent / Supervisor position within

the oil, gas, and/or power industrial markets. I have over 28+ years of experience in the

construction industry and possess the knowledge and skills to lead assigned crews in daily

activities to ensure a successful project outcome. I have extensive experience in

preparing bids, estimating and planning work, and directing crews through completion of a

variety of construction projects.

Experience

Turner Industries

JUN

. to Present

CCU/SSB T/A 2012

Planning/Scheduling/Estimating in P6-V7 Primavera Also Addendums FCOs, Material: Long

Lead Ordering To Spec and Tracking, Cost Tracking, Implementing Contractor/Vendors

Estimates into Schedule

Sep. to Nov. Nov. to Jun. 2012

Ollephins 3 2011 T/A CFHT/A 2012

Planning/Scheduling/Estimating in P6-V7 Primavera Also Addendums FCOs

Phoenix Services

HyCo Unit

Jan. to Aug

Linde Gas at Celanese Clear Lake Tx.

P6 V7 Scheduler Estimator

Build T/A Schedule in WBS Format

Create Codes and Resources and Look Aheads

Progress Daily Updates

Building Job Packages, Contractor Job Walks for T/A Quotes, Estimating Both Capital and

T/A work. Primavera P6 V7 Scheduler

Ordering all Material, Tracking Long Lead Items. Building Contractor Bid Packages For

Corporate to Send to Companies for Bids.

TIMEC Company Inc

.

2009

to 2009Planner/Scheduler/Estimator

for the CRU-3 HCU GCP and the DCU. Depropanizer Tower,

Deethanizer Tower, Sour water Flash Drum replacements and all piping Involved At the

Tesoro Petroleum Refinery in Wilmington Ca. 90810

TIMEC Company Inc

. Jan. 2008 to Jan. 2009Planner/Estimator

for PTR/PrTr Oct. 2008 Turnaround at Exxon Mobil Torrance CA Refinery

Turn-Around Planning and Field Packages generation for preparation of major turn-around

execution plans

Cost estimating for above turnaround event, as well as other refinery major maintenance

projects

KAP PROJECT SERVICES, EL SEGUNDO, CA 2005 to 2008PLANNER P3E Scheduler

Plan and schedule workflow for each department and operation according to previously

established manufacturing sequences. Prepare work packages for use by client and

contractors that include all relevant documents, drawings, specifications, and material

lists necessary to ensure accurate execution during a project/turnaround.

Confer with department supervisors and engineers to determine status of assigned

projects.

Field-walk jobs to obtain necessary information to plan and estimate. Provide

information to client of discrepancies found in engineering work orders. Input field-walk

data/estimates into database. Confer with scheduler to ensure accuracy in schedule.

Prepare purchase orders to obtain materials, tools and equipment.

Review material lists for conformance to company-standard practices in regards to parts

and materials used.

Arrange in-plant transfer of materials to meet production schedules.

Coordinate for upcoming turnaround projects.

KAP PROJECT SERVICES, Sun Ray, TX 2005 to 2005Planning P3E Scheduling

Planned, Scheduled, T/A

Measured and evaluated effectiveness of safety program using established goals.

Maintained required records.

REPCON, LA PORTE, TX 2004 to 2005CRAFT SUPERVISOR

Interpreted specifications, blueprints and job orders to determine personnel and material

requirements. Assigned work to supervisors. Inspected work in progress to ensure all work

conformed to specifications and that construction schedules were followed. Conferred with

and directed supervisory personnel and subcontractors engaged in planning and executing

work procedures.

DE JEAN COMPANIES, LA PORTE, TX 2003 to 2004SUPERINTENDENT

Directed supervisors in the demolition of an exchanger and reactor head and installation

of a new exchanger and reactor head. Laid out, assembled, installed and maintained pipe

systems, pipe supports and related hydraulic and pneumatic equipment for steam, hot water,

heating, cooling, lubricating, sprinkling and industrial production and processing

systems. Selected type and size of pipe and related materials and equipment, according to

specifications. Job completed on-schedule and within budget.

REPCON CONSTRUCTION, DEER PARK, TX 2003 to 2003GENERAL FOREMAN

Coordinated/supervisor Turnaround

. Met with client and engineering on a daily basis for

updates and progress reports. Verified piping dimensions and spools prior to installation.

Coordinated piping towers and exchanger work to maximize work to ensure minimal downtime.

Work was completed ahead of schedule and in a safe manner.

VARIOUS, TX, TN, LA 1985 to 2003SUPERINTENDENT / GENERAL FOREMAN

Performed in the capacity of Superintendent / General Foreman

for a variety of companies,

such as Zachary Construction, CMI Construction, H&H Construction and Harmony Construction

working in the Oil, Gas & Power Industry. All required the ability to interpret drawings

and specifications, coordinate and assign work to subordinates, order material, and

communicate on a daily basis with client and contractors and ensure a timely and safe

completion of each job.

Education

Ganado High School,

Ganado, TX 1983

H.S

.

Bee County College,

Beeville TX

Oil and Gas Technology, Mechanical Drafting

Skills

I feel that my past experience will allow me to plan, estimate schedule and execute jobs

in a very efficient manor.

Piping and Structural Qualifications: Experienced in Planning, bidding and estimating

jobs, material and equipment to execute work.

Coordinating all aspects of the job, ordering Long Lead items and Tracking them.

Planning Contingency Plans/ Planning Logistics.

Experienced in interpreting Ortho's, P&ID's and Isometric Drawings, C- CAD, Mech.

Drafting.

Experienced in Material Take-Off.

Experienced in Mobilizing and Demobilizing workforce.

Training

Primavera P6 V7 Successfully Passed Basic and Advanced Course PMO Link

P3E Training

TWIC Card

Contractor Coordinator

Supervisory Training Course

OSHA Safety Training Courses

Scaffold Competency by the State of Texas

Welding Procedure / Examination Course

NCCER Inst

Operator Certified (35 tons)



Contact this candidate