Post Job Free
Sign in

Project Manager Engineer

Location:
United States
Posted:
December 12, 2012

Contact this candidate

Resume:

Title:Consulting Manager

******@*****.***

Document

Source below

NAME:,

ADDRESS:

ADDRESS2:

CITY:

STATE:

ZIP:

CANDIDATE ID: 2570066

US CITIZENSHIP:

EDUCATION:

EXPERIENCE: 0

WILL RELOCATE: No -

JOB WANTED:

RATE NEEDED:

TELEPHONE:

EMAIL: ******@*****.***

HOMEPAGE:

HOTTEST SKILLS: economic, journal, liability

REVISION:

07

-SEP-02

[1][USEMAP:iogo4.gif]

ENGINEERING CONSULTANT IN WATER RESOURCES

EUNG-CHUN LEE

ROOM 603, JEIL BLDG. 1-13 BYOLYANG-DONG

KWACHON, KYONGGI-DO, KOREA

I : (82)2-507-7270

Fax: (82)2-502-5952

E-mail: [2]******@*****.***

Web : [3]http://www.hitel.net/~hydro9/

W

ORK EXPERIENCE

04/98

- PresentPRIVATE CONSULTANT

Kwachon,Kyonggi-do,Korea

* As a private consultant, Mr. Lee provides consulting services on

water resources engineering covering hydraulics, hydrology, and

hydroelectric development.

1981

- 1998SAMAN ENGINEERING COMPANY

Seoul,Korea

1997

- 1998Project Director and Project Manager

* As the project director, Mr. Lee reviewed the quality of

engineering works and provided guidance to the engineers

participating water resources projects.

* Project manager of Saman for The Design of Seoul-Inchon Navigation

Project, Korea: Saman was responsible for the design of 15-km long

man made navigation canal (

1996

-1998)

* Project manager for The Water Availability Study for Existing Dams

in The Nakdong and Geum River Basins, Korea: The project was aimed

at reevaluating the water supply capability of the dams based on

operation experiences and hydrological data accumulated since they

were in operation (1997-98).

* Yanyang Pumped Storage Power Project, Korea: Reviewed project

layout, prepared power tunnel alignment, and guided hydrologic and

hydraulic works including hydraulic model test and transient

analysis. Project features include upper and lower dams, power

tunnel and 1,000MW underground powerhouse

(

1994-97

).

1993

-1996

Head, Water Resources Department

* As department head, Mr. Lee reviewed, supervised and directed

project works which were managed by his department.

* Project manager for The Kyzylbulkak Hydropower Project,

Kazakhstan: Performed feasibility study for developing the 45MW

run-of-river type hydropower with 95m-high RCC dam

(1996-97)

* Feasibility Study on Water Supply to Pusan-Kyongnam Area Using

Hapchon Dam Storage: Reviewed the water supply availability of

existing Hapchon dam (1995-96)

* Project manager for The Sanchung Pumped Storage Power Project:

Services consist of detailed engineering design and providing

technical advice during construction of the project. Project

features include concrete-faced rockfill dams for upper and lower

dams,1,700m-long power tunnel, 400m-high vertical shaft and

underground cavern which houses 700MW power facilities

(

1993-94).

* Project manager

for The Design of Gulpo River Flood Diversion

Channel: The project, later on, proceeded with the Seoul-Inchon

navigation project making the diversion channel, which is to be

emptied to the sea near Inchon, deeper and wider with the channel

alignment maintained (1992-93).

1984

-1992Chief Engineer

* Project manager for The Feasibility Study of Sanchung Pumped

Storage Power Project, Korea: Project features include

concrete-faced rockfill dams, power tunnel, and underground

powerhouse cavern (1991-92).

* Hydrologist for The Pre-Feasibility Study of Seoul-Inchon

Navigation Project

(

1991-92).

* Resident chief engineer

for The Geumho River Basin Water Supply

Project, Korea: Provided construction supervision and technical

advice during construction of the rockfill storage dam, 2.4km-long

water conveyance tunnel, treatment plant, and water main.

(

1988

-91).

* Hydrologist for Wewak City Drainage Project, Papua New Guinea:

Performed flood study for establishing the detailed drainage plan

in the city (1989).

* Hydrologist for The Peace Dam Project

(

1997-98)

* Project manager for Detailed Engineering Design of Kangnung

Hydropower Project: Project features include 15km-long power

tunnel, 500m of which was of vertical shaft, 72m-high rockfill

dam. and 82MW power facilities

(

1984-88).

* Project manager

for The Pre-Feasibility Studies of 7 Medium Size

Multi-Purpose Dams: Services provided included selection of

damsites and preparation of development schemes (1987-88).

* Hydrologist for The Pemali River Flood Control Project, Indonesia:

Performed flood study and made technology transfer to local

engineers during three-month assignment (1985).

* Project manager for The Feasibility Study of Dogok Hydropower

Project: Services included preparation of development scheme and

economic evaluation of the 35MW hydroelectric project

(

1984-85

).

1981

-1984Senior Civil Engineer

* Project manager for The Optimization Study on Storage Distribution

of Sumjingang Multipurpose Dam: Studied optimum storage allocation

to meet both irrigation demand and maximum power benefit

(1983-84).

* Hydrologist and system analyst for The Juam Multipurpose Dam

Project: Performed hydrologic studies including stream flows and

floods, and reservoir operation study taking into account power

and water supply (1983-84).

* Hydrologist and system analyst for The Hapchon Multipurpose Dam

Project: Performed hydrologic studies including reservoir inflow,

flood frequency, PMF, and Power operation study

(

1982-83).

* Project engineer

for The Feasibility Study on South Han River

Hydropower Sites: Performed hydrologic, hydraulic and power

operation studies to select the most economical system development

scheme containing three interrelated potential reservoir sites,

Doam, HWaui and Pyongchang. Of the three sites Doam has solely

been developed under the name of Kangnung Hydropower Project

(

1982

-83).

* Project engineer

for The Pre-Feasibility Study on South Han River

Hydropower Sites: Performed hydrologic and power studies for the

potential ten hydropower sites (

1981

-82

).

1974

-1981HYUNDAI ENGINEERING COMPANY

Seoul,Korea

Hydrologist and Hydraulic Engineer

* Nation-wide hydrologic studies funded by

IBRD:

Services comprised

collection of hydrologic data, preparation and arrangement of flow

records through construction of stage-discharge relationship for

the gauging stations, recommendation on hydrologic station

networks and control organization, and various analytical studies

including average annual precipitation, flood frequency, and

reliability of reservoir yields by storage (1977-78).

* Muju Pumped Storage Power Project: Hydrologist and team leader for

the detailed design of rockfill dams and ancillary works for upper

and lower reservoirs for 600MW pumped storage project (1979-81).

* Performed hydrologic and hydraulic studies including floods and

river stages required for establishing the master plans of river

maintenance and improvement for more than five major river basins

in Korea (1975-82).

* Lead detailed design of storage dam for water supply to nuclear

powerplant No.7 and 8 (1979-80).

* Lead detailed design of storage dam for water supply to nuclear

powerplant No.9 and 10 (1979-80).

* Imgye Dam Multi-Purpose Development Project: Hydrologist for the

feasibility study of the Multipurpose project including a main

dam, equalizing reservoir, and trans-basin hydropower (1974).

1973

-1974HYUNDAI CONSTRUCTION COMPANY

Seoul,Korea

Civil Engineer

* Involved in stability analysis of embankment

E

DUCATION

1966

-1970

SEOUL NATIONAL UNIVERSITY

* B.S

., Civil engineering

A

WARDS

* Outstanding Staff Award, from Hyundai Engineering Company,1980

* Outstanding Achievement Award, from Ministry of

Construction,Korea,1988

* Technical Award, from Korea Water Resources Association,1998

* Technical Award, from Korea Committee on Large Dams,1996

L

ICENSES

* Registered Professional Civil Engineer, Korea

P

ROFESSIONAL SOCIETY

* Member, Korean Society of Civil Engineers

* Member, Korea Water Resources Association

* Member, Korea National Committee on Large Dams

* Member, American society of Civil Engineers

T

References

1. LYNXIMGMAP:file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/f

etch/url.947840762.8.html#ImageMap1

2. mailto:******@*****.***

3. http://www.hitel.net/~hydro9/

4. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/index.

html

5. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/introd

uce.html

6. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/profil

e.html

7. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/techpr

ofile.html

8. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/servic

e.html

9. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/link.h

tml

10. mailto:Email:******@*****.***



Contact this candidate