ENGINEERING CONSULTANT IN WATER RESOURCES
EUNG-CHUN LEE
ROOM 603, JEIL BLDG. 1-13 BYOLYANG-DONG
KWACHON, KYONGGI-DO, KOREA
I : (82)2-507-7270
Fax: (82)2-502-5952
E-mail: [2]******@*****.***
Web : [3]http://www.hitel.net/~hydro9/
W
ORK EXPERIENCE
04/98
- PresentPRIVATE CONSULTANT
Kwachon,Kyonggi-do,Korea
* As a private consultant, Mr. Lee provides consulting services on
water resources engineering covering hydraulics, hydrology, and
hydroelectric development.
1981
- 1998SAMAN ENGINEERING COMPANY
Seoul,Korea
1997
- 1998Project Director and Project Manager
* As the project director, Mr. Lee reviewed the quality of
engineering works and provided guidance to the engineers
participating water resources projects.
* Project manager of Saman for The Design of Seoul-Inchon Navigation
Project, Korea: Saman was responsible for the design of 15-km long
man made navigation canal (
1996
-1998)
* Project manager for The Water Availability Study for Existing Dams
in The Nakdong and Geum River Basins, Korea: The project was aimed
at reevaluating the water supply capability of the dams based on
operation experiences and hydrological data accumulated since they
were in operation (1997-98).
* Yanyang Pumped Storage Power Project, Korea: Reviewed project
layout, prepared power tunnel alignment, and guided hydrologic and
hydraulic works including hydraulic model test and transient
analysis. Project features include upper and lower dams, power
tunnel and 1,000MW underground powerhouse
(
1994-97
).
1993
-1996
Head, Water Resources Department
* As department head, Mr. Lee reviewed, supervised and directed
project works which were managed by his department.
* Project manager for The Kyzylbulkak Hydropower Project,
Kazakhstan: Performed feasibility study for developing the 45MW
run-of-river type hydropower with 95m-high RCC dam
(1996-97)
* Feasibility Study on Water Supply to Pusan-Kyongnam Area Using
Hapchon Dam Storage: Reviewed the water supply availability of
existing Hapchon dam (1995-96)
* Project manager for The Sanchung Pumped Storage Power Project:
Services consist of detailed engineering design and providing
technical advice during construction of the project. Project
features include concrete-faced rockfill dams for upper and lower
dams,1,700m-long power tunnel, 400m-high vertical shaft and
underground cavern which houses 700MW power facilities
(
1993-94).
* Project manager
for The Design of Gulpo River Flood Diversion
Channel: The project, later on, proceeded with the Seoul-Inchon
navigation project making the diversion channel, which is to be
emptied to the sea near Inchon, deeper and wider with the channel
alignment maintained (1992-93).
1984
-1992Chief Engineer
* Project manager for The Feasibility Study of Sanchung Pumped
Storage Power Project, Korea: Project features include
concrete-faced rockfill dams, power tunnel, and underground
powerhouse cavern (1991-92).
* Hydrologist for The Pre-Feasibility Study of Seoul-Inchon
Navigation Project
(
1991-92).
* Resident chief engineer
for The Geumho River Basin Water Supply
Project, Korea: Provided construction supervision and technical
advice during construction of the rockfill storage dam, 2.4km-long
water conveyance tunnel, treatment plant, and water main.
(
1988
-91).
* Hydrologist for Wewak City Drainage Project, Papua New Guinea:
Performed flood study for establishing the detailed drainage plan
in the city (1989).
* Hydrologist for The Peace Dam Project
(
1997-98)
* Project manager for Detailed Engineering Design of Kangnung
Hydropower Project: Project features include 15km-long power
tunnel, 500m of which was of vertical shaft, 72m-high rockfill
dam. and 82MW power facilities
(
1984-88).
* Project manager
for The Pre-Feasibility Studies of 7 Medium Size
Multi-Purpose Dams: Services provided included selection of
damsites and preparation of development schemes (1987-88).
* Hydrologist for The Pemali River Flood Control Project, Indonesia:
Performed flood study and made technology transfer to local
engineers during three-month assignment (1985).
* Project manager for The Feasibility Study of Dogok Hydropower
Project: Services included preparation of development scheme and
economic evaluation of the 35MW hydroelectric project
(
1984-85
).
1981
-1984Senior Civil Engineer
* Project manager for The Optimization Study on Storage Distribution
of Sumjingang Multipurpose Dam: Studied optimum storage allocation
to meet both irrigation demand and maximum power benefit
(1983-84).
* Hydrologist and system analyst for The Juam Multipurpose Dam
Project: Performed hydrologic studies including stream flows and
floods, and reservoir operation study taking into account power
and water supply (1983-84).
* Hydrologist and system analyst for The Hapchon Multipurpose Dam
Project: Performed hydrologic studies including reservoir inflow,
flood frequency, PMF, and Power operation study
(
1982-83).
* Project engineer
for The Feasibility Study on South Han River
Hydropower Sites: Performed hydrologic, hydraulic and power
operation studies to select the most economical system development
scheme containing three interrelated potential reservoir sites,
Doam, HWaui and Pyongchang. Of the three sites Doam has solely
been developed under the name of Kangnung Hydropower Project
(
1982
-83).
* Project engineer
for The Pre-Feasibility Study on South Han River
Hydropower Sites: Performed hydrologic and power studies for the
potential ten hydropower sites (
1981
-82
).
1974
-1981HYUNDAI ENGINEERING COMPANY
Seoul,Korea
Hydrologist and Hydraulic Engineer
* Nation-wide hydrologic studies funded by
IBRD:
Services comprised
collection of hydrologic data, preparation and arrangement of flow
records through construction of stage-discharge relationship for
the gauging stations, recommendation on hydrologic station
networks and control organization, and various analytical studies
including average annual precipitation, flood frequency, and
reliability of reservoir yields by storage (1977-78).
* Muju Pumped Storage Power Project: Hydrologist and team leader for
the detailed design of rockfill dams and ancillary works for upper
and lower reservoirs for 600MW pumped storage project (1979-81).
* Performed hydrologic and hydraulic studies including floods and
river stages required for establishing the master plans of river
maintenance and improvement for more than five major river basins
in Korea (1975-82).
* Lead detailed design of storage dam for water supply to nuclear
powerplant No.7 and 8 (1979-80).
* Lead detailed design of storage dam for water supply to nuclear
powerplant No.9 and 10 (1979-80).
* Imgye Dam Multi-Purpose Development Project: Hydrologist for the
feasibility study of the Multipurpose project including a main
dam, equalizing reservoir, and trans-basin hydropower (1974).
1973
-1974HYUNDAI CONSTRUCTION COMPANY
Seoul,Korea
Civil Engineer
* Involved in stability analysis of embankment
E
DUCATION
1966
-1970
SEOUL NATIONAL UNIVERSITY
* B.S
., Civil engineering
A
WARDS
* Outstanding Staff Award, from Hyundai Engineering Company,1980
* Outstanding Achievement Award, from Ministry of
Construction,Korea,1988
* Technical Award, from Korea Water Resources Association,1998
* Technical Award, from Korea Committee on Large Dams,1996
L
ICENSES
* Registered Professional Civil Engineer, Korea
P
ROFESSIONAL SOCIETY
* Member, Korean Society of Civil Engineers
* Member, Korea Water Resources Association
* Member, Korea National Committee on Large Dams
* Member, American society of Civil Engineers
T
References
1. LYNXIMGMAP:file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/f
etch/url.947840762.8.html#ImageMap1
2. mailto:******@*****.***
3. http://www.hitel.net/~hydro9/
4. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/index.
html
5. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/introd
uce.html
6. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/profil
e.html
7. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/techpr
ofile.html
8. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/servic
e.html
9. file://localhost/home/beta/Easytrieve/cvsroot/root/data/www.altavista.com/fetch/link.h
tml
10. mailto:Email:******@*****.***