Eugene Cushing
Email: *********@********.***
Address: **** ******* ***
City: Hartwell
State: GA
Zip: 30643
Country: USA
Phone: 225-***-****
Skill Level: Management
Salary Range: $65,000
Willing to Relocate
Primary Skills/Experience:
See Resume
Educational Background:
See Resume
Job History / Details:
Eugene W. "Bill" Cushing
4632 Lavonia Hwy.
Hartwell, GA 30643
Email: *********@********.***,
Cell: 225-***-****
Objective: Challenging long term position with advancement possibilities meeting and exceeding company goals.
Qualifications: Possess excellent work ethics and people skills with twenty-five years' experience in the electrical, electronic and pneumatic process control fields in petroleum refineries, power generation and offshore construction. Trained in Health, Safety and Environmental standards and working as coordinator and supervisor on several projects. On National Registry with National Center for Construction Education and Research (NCCER) as Instrument Technician and Electrician (Cert. #3902322). I have worked in both construction and maintenance projects under contract and general employment in design, upgrade and retrofit of all areas of electrical and instrumentation. Worked with SAP and Maximo in planning, tracking and maintenance scheduling. Knowledgeable in all types of DCS, PLC (Ladder Logic), SCADA, motor control devices (starters, VFDs etc.) and hydraulic systems. With experience in bench calibration, installation, loop verification and tuning. Familiar with NEC and HVAC (Mechanical and Electrical) w/Level II CFC Certification.
Current US Passport exp.08/12/2014, TWIC 04/01/2016, Security and Safety Passport and OSHA Cards.
Education: Graduate Sam Houston High, Moss Bluff, LA 1978
Refinery Process Operations, Sowela Technical School, Lake Charles, LA 1981
Hardware Maintenance and Engineering, ABB MOD 300, Rochester, NY 1991
GE Fanuc PLC Training, Greenville, SC 1992
Plant Engineering, Clemson University Extension, Greenville, SC 1992-1993
OSHA 29 CFR 1910 and 1926, Occupational Safety Consultants, York Tech.,
Rock Hill, SC 1993
Applied Electrical Technology, Athens Tech., Athens, GA 1996-97
OSHA Construction Standards, U.S. Dept. of Labor, Chicago, IL 2001
Field Engineering T/A, GE Power Systems, Schenectady, NY 2002
Experience:
9/12-present Instrument and Electrical
Dynamic Industries, SWN, Clark Natural Gas Compressor Project, Towanda, Pennsylvania
05/11-8/12 Maintenance/ Electrical Supervisor
Shaw Group, Lion Copolymer, Baton Rouge, Geismar, LA
Oversee troubleshooting and repair of process equipment, participate on special electrical and instrumentation projects and upgrades.
10/08-03/11 Human Services Foundation, Baton Rouge, LA
Contractor for electrical renovations and upgrades, for company investments.
06/08-9/08 Maintenance I & E Technician
Vector Electric and Controls, Placid Refinery, Port Allen, LA
Responsible for night shift maintenance assisting plant techs during FCC shutdown
11/07-04/08 I & E Technician
Baker Energy Services, BP Nakika Production Platform
Assisted BP maintenance personnel with preventive maintenance backlogs, calibration checks of field devices and PLC upgrades and card replacement.
02/07-09/07 I & E Technician
Deepwater Specialist, Inc., BP Nakika Production Platform
Assist maintenance to reduce instrumentation backlog and perform annual preventive maintenance on Solar turbines instrumentation.
11/06-01/07 I & E Supervisor
TEST Automation and Controls, TengizChevrOil (TCO), Atyrau Region, Kazakhstan
Responsible for training of nationals on Honeywell HPM and FTAs, control parameters and loop checks for Crude Unit and Utilities.
05/06-10/06 Commissioning I & E Technician
Deepwater Specialist, Inc., BP Thunderhorse Project, MS 778
Controls commissioning and startup of a Production and Drilling platform including Robicon VFDs.
02/06-04/06 Instrument Technician
Turner Industrial Group, Conoco Phillips Refinery, Westlake, LA
Responsible for calibration, checkout of all instrumentation for process control for Premium Coker T/A.
07/05-12/05 I & E Technician
Triad Electric, Citgo Refinery, Sulphur, LA
Responsible for tubing and conduit installation, calibration, checkout of all instrumentation for process control for Cat Cracker T/A.
02/03-05/05 Electrician/Electronic Technician
Global Offshore Industries, Carlyss, LA
Offshore pipelaying and construction of barge equipment and associated systems. With on LM 2500 Turbines. Involved with Behavioral Based Safety Incentive) and SOR (Safety Observation Report) Coach Programs
11/98-08/2002 Commissioning/Startup Controls Engineer/TA, Contracted on various projects:
* Jackson County Project, Georgia Power, Nicholson, GA 8-7EA Simple Cycle Unit with MKV
* Ladysmith Project, Dominion Power, Ladysmith, VA 2-7FA Simple Cycle Units with MKVI
* Santee Cooper Project, Iva, SC 1-7FA Combined Cycle with NEM HRSG and 1-7FA Simple Cycle with MKVI
* Frontier Project, Duke Power, Mission, TX 2-7FA Combined Cycle with MKV
* Sowega Power, Baconton, GA 6 LM6000 Peak Power with Sprint
05/97-10/98 Contract Safety Supervisor, Austin Industrial, Lyondell Chemical
Westlake, LA
10/91-11/97 Plant Engineer/ESH Coordinator, Springs Industries, Hartwell Complex, Hartwell, GA Responsible for all maintenance, upgrades and engineering activities in a finishing plant and WWTP performing all OSHA training and inspections for 29 CFR
With an uncanny ability to grasp and knowledge, excellent work ethics and people skills, with many years in the Instrument and Electrical discipline I believe I could be an asset to your company. Thank you for your time and consideration.
References upon request
File:EWCRESie.doc