Post Job Free
Sign in

Project Manager Construction

Location:
Miami, FL
Posted:
December 11, 2012

Contact this candidate

Resume:

Patria Sanchez

Contact: abp0ck@r.postjobfree.com

Street: ***** ** **** ****

City: Miami

State: Florida

Country: United States

Zip: 33156

Years of Work Experience: 20+

Current Salary: 75K to 99K

Current Duties: Project Architect, Project Manager,

Construction Administration Manager

Looking for: Architecture

Construction

Maximum Travel: 25

Position Type: Either

College Attended: UNPHU - DR

Highest Degree Attained: Masters

Available Start Date: 2008-11-18

Cover Letter

I have enclosed my resume to provide a summary of my qualification and background for your review.

Throughout my career as an Architect, I have maintained the highest performance standards within a diverse range of the architectural process from development of the construction documents and administration to project management which is clearly illustrated by my past successes. As a Construction Administration Project Manager for projects in Miami, Florida, I streamlined operations and reduced project cost by negotiating competitive rates and pricing with subcontractors and providers.

Additionally I facilitated the implementation of design changes and additional services that significantly increased the company's profile.

Currently, I am seeking and association with a company that can benefit from my expertise as an Architect and Construction Manager with excellent organizational and communication skills, an outstanding work ethic and the ability to work equally well in both team oriented and self directed environments.

I would welcome the opportunity to discuss my qualifications and candidacy in further detail. Thank you for your time and consideration.

Resume

Patria E. Sanchez

11064 SW 79th Path, Pinecrest, Fla. 33156

Voice: 786. 245 .9081

E-mail: abp0ck@r.postjobfree.com

Objective:

Pursuing a position in Architecture or Construction Administration Field, in which my skills and abilities would contribute to the development of both, my employer and myself.

Professional Experience:

Graduated Architect that earned a Master degree in Architecture at U.N.P.H.U, D.R. in 1987, with 25 years of professional experience in Design, Architectural document development and M.E.P. coordination. Knowledge of specifications, construction details, general conditions, construction sequences, project documentation and phasing.

Experience managing multiple projects. Production team leadership from Design through Construction Administration. Develop work plan, schedules, manage consultants. Client interface. Submittals and Shop drawing review.

Zyscovich Architects

January 2002

2008

Role: Project Manager Construction Administracion

Responsible for planning, interpreting, organizing, and managing projects through all phases of development. Establishing and monitoring budgets, managing project team and preparing schedules to ensuring efficient utilization of resources.

Overseeing the architectural process from proposal through construction administration on a project.

Responsible for establishing client relationship, directing and monitoring all the following activities:

Preparation/ responding RFIS and BID specifications for remodeling and new construction projects

Recommendations to GC corporate staff, and committees concerning building design and construction.

Planning for all remodeling and new construction by participating in preconstruction planning meetings

Visits all construction projects as needed to assure that plans, specifications, codes and regulations are being observed and followed.

Develops and supervises a quality-control program for materials used in new construction and remodeling.

Reviews and approves for submission bills submitted by building contractors, testing laboratories, consulting engineers and surveying firms.

Recommendations if any project change orders for approval with comment and cost analysis.

Directing site demolition and preparation projects prior to commencement of remodeling or new construction.

Recommendations for acceptance of completion reports and acceptance of remodeling and/or new construction.

Supervises and approves substantial completion and acceptance of warranty work by General contractors.

Verification of General contractor compliance with ADA; other issues regarding public accessibility for all construction projects.

Obtaining and safeguards original blueprints and revisitions [As Built set] for all work accomplished on remodeling or new construction projects.

Maintaining necessary records and prepares periodic field reports for Owner.

Construction Administration Projects

The Meridian Mid raise Multi use Building, Miami Beach. Multiuse development project: office spaces, maintenance facilities.

Grove Garden Mid Raise Residential Building on Coconut Grove [95% completed] Multiuse development project: office spaces, maintenance facilities

The Elan Condominiums [Foundation phase] on 21st and Collins ave. Renovation Multiuse development project: condominiums, retail spaces, maintenance facilities.

Role: Project Architect Production Manager - Quality Control

Responsible for the planning and coordination of the design documentation of a project during Schematic through Construction Document phases in conjunction with the Senior Project Manager. Coordinate work assignments of a diverse project team as well as coordinate with clients, consultants and contractors for a number of Mid-Raise and High-Raise Buildings under construction / Const.Doc and Interior Built out Phase that includes the following:

1390 Brickell Bay -High raise Multi use Building,

The Elan - Mid Raise Residential Building in South Beach.

Doral Shoma Homes - at Doral Recreational Building / Gatehouse

The Grove Garden - Mid raise Multi use Building in Coconut Grove.

Harper Partners- Perez and Perez - Joint Venture

June 2000 - January 2002

Role: Project Manager / Field Architect

American Airlines - North Terminal C-D Infill - 739 G Ramp Interior Finish Out- Miami International Airport.

Compromises the C-D Infill Ramp Finish currently under construction on the North Side of the existing Bldg. Provides Support for permanent and interim baggage System, Ramp operation Break Room relocation, Facilities Maintenance and Lockers Relocation, AA Maintenance Administration Offices as well as Barriers and Pedestrians access of ways and tug drives. Is aprox. 170,000 sq.ft. Project.

American Airlines - North Terminal 739 C - Concourse D Remodel Miami International Airport.

Field verifications for this major building to be constructed under North Terminal Development, to provide design continuity and coordination not already included in other adjacent Projects including Fin-Out (MIA-739G, 739A, 739F and 739H). Coordination of 5 new Gates with existing ones to remain under Project 739G.

Role: Project Architect

American Airlines - North Terminal 739 A C-D Infill Level 2, 3, and 5 Interior Finish Out - Miami International Airport.

Compromises the C-D Infill level 2, 3, and 5 Finish out.

American Airlines - North Terminal 739 F - D Extension Interior Finish Out Miami International Airport.

Involves the design and construction of interior finishes for the d-Extension Bldg. Shell. (741E). This work encompasses approximately 113,000 square feet of space at the ramp level which will be used for administrative offices, restrooms and other support facilities.

American Airlines - D Extension 741 A Building shell. Miami International Airport.

This project includes design and construction of a new building shell that will extend existing Concourse D. This three level concourse structure will enclose approximately 452,000 square feet and will comprise 13 international gates. Work will include demolition and reconstruction of parts of existing concourse D.

Bermello, Ajamil and Partners

Jan 1998 - June 2000

Role: Project Architect - Production Manager Job Captain

Project Designer providing design continuity and leadership throughout the entire project. Developing the initial design concept and coordinates with other team members to further develop the design in final concept, schematic and design development project phases and

Construction Documents on the following High rise buildings:

"Coral View"

"Brickell View" Multiuse development project: office spaces, maintenance facilities

B.A.P. Multiuse development project: office spaces, maintenance facilities, 10 floors of Parking Garage, 485 residential units, approximately 20,000 sq. ft. structure for Storage, Retail and Restaurants.

Wolfberg, Alvarez and Partners

January 1996 -Jan 1998

Role: Project Architect

For a number of Shell and Interior Projects for American Airlines - North Terminal, at Miami International Airport that includes the following:

American Airlines - North Terminal C-D Infill Foundation, Demolition and Shell- Miami International Airport.

Foundation, Demolition and Shell Packages for AA Terminal Concourse C-D Infill at Miami International Airport.

The C-D Infill Shell project will be constructed on the North Side of the existing Bldg.. Is a three story Shell Structure with 570,

000 SF with and elevated guide way structure for the proposed Automated People Mover (APM) and with a structure of approximately 57,000 SF To house the maintenance and storage facility for the APM system. Includes a third component of a ground traffic control tower for American Airlines.

Complete architectural and engineering services for a 267,000 SF development consisting of office, residential, hotel, and retail and entertainment facilities.

City of Coral Gables Maintenance and Storage Facilities, Coral gables, Florida.

Project Architect for the design of a new 425,000 SF multi-use, multi-level maintenance and storage areas.To accommodate the City's fleet maintenance and storage operations. The current facility, located in Coral Gables, houses several of the City's departments and divisions including automotive Parking, public Service, Public Works, and Purchasing

Extended Stay America

Architect for architectural and engineering services for site adaptation of prototype hotel designs for 25 locations throughout the State of Florida.

American Wilderness Experience, Ontario, CA; Grapevine, TX. And Tempe, AZ.

Architect for A/E/I design of three 30,000 SF multi-purpose entertainment centers. Each project includes a restaurant, shops, presentation chambers, geography and animal exhibits, and ancillary support services such as food storage holding pens and kitchens. A mezzanine level of approximately 1,500 SF will be utilized as offices and equipment storage.

Ronald Frazier & Assoc

.

January 1994

- January 1996

Role: Architect

Satellite "E" Expansion of the existing Concourse Satellite at Miami Int.Airport

This project includes design of a new building shell that will expand existing Concourse "E".

Production of Architectural and Engineering Design/ Construction Documents.

Bliss & Nyitray, Inc

. Consulting Structural Engineers /Joint Venture with H.O.K. Architects

June 1992

- December 1994

Role: Project Architect

Design Development and Structural Construction Doc. Phase.

Architectural Production and Structural Coord. / Computerized drafting in AutoCAD

For Sports Facilities, that includes Pro-Player Stadium, Jupiter Sport Facility in Jupiter Fl., Tampa NFL Football Stadium in Tampa Fl., Baltimore NFL Football Stadium known as Cleveland Redskinds NFL Football Stadium in Washington D.C Jacksonville Municipal Baseball Stadium.

Z. W. Jarosz Architects, P.A

.

1991

Role: Independent

Subcontractor - Architect

Complete responsibility for Design Development, Production of Working Drawings in AutoCAD R-13for Windows and Soft desk Architectural 7.2

Coordinate with Clients and Consultants in new Residential built.

Ramn Pacheco, Architect and Planner

1991

Role:

Independent

Subcontractor Architect

Responsible of Design Development, Preliminary Drawings for the City of Coral Gables and Working Drawings for 8 Houses to be built by G.P. Builders III, in Cocoplum, C.G., operating AutoCAD R13 for Dos.

Seckinger and Assoc

., Architects and Interior DesignerFebruary 1991

Role:

Independent

Subcontractor Architect

Schematic Design, Design Development and Construction Documents for "Round Hill Hotel" Villas in Montego-Bay, Jamaica. Working Drawings for 300C- Office Bldg. In Boca Raton, Fla. Operating AutoCAD R12 and Addcad R12.

Archipro Staff, Agency

1990

Architect- AutoCad Operator

for short-term Positions

Duties and responsibility are performing Architectural Design, Working Drawings and Computerized Drafting in new Residential Built and Renovations. Design Ind. Kitchens, VIP Rooms, Bars and Guest Areas for Hotels in South and Central America. Operating Autocad R13, Advance Autocad R12, AEC, ASG and Summa-Digitizer for:

Siskind, Carlson, and Partners, Architects

Margaret Tyler Interiors, Interior Designer

Caribbean Producers LTD

., Ind. Kitchens

Slack and Rodriguez, Interior Designer

Snow wise,

Interior Designer

J.M. Chiew, Architects

1990

Role:

Independent

Subcontractor - Architect - AutoCad Operator

Working Drawings and Construction Documents for Residential -Single Family Homes for Sterling Oaks Patio Homes Community Devopment Operating Autocad R12

R.J. Pujol, Architect

December 1989

- February 1990

Role: Independent

Subcontractor /Architectural Designer - AutoCad R9 / R13 Operator

Complete Responsibility for Design Implementation, Construction Documents, Production of Hand drafting as well as Computerized working drawings in new Residential Projects in Coral Gables, Additions and Remodeling, Medical Offices and Commercial Buildings. Coordinate with Clients and Consultants.

Education:

1982

- 1988 U.N.P.H.U. University, Sto. Dgo, Dominican Republic

MBA

. Architecture, Graduated Summa Cum Laude.

A.T.I. Career Training Center

Miami, Fla.

Autocad Operator / R9 1989

Mech., Elect. Civil and Architectural Designer / Comp. Aid Design Operator, 1990

Computer Communication / Skills :

Microsoft Excel

Microsoft PowerPoint

Knowledge of AutoCAD 2008

Photoshop

Primavera

Microsoft Project

Revit 9.1

Languages:

Fluent in English / Spanish

References :

TGNC Development / Setai Group

Michael Johnson

786-***-****

Soares Da Costa Construction

Ashley Ziel

786-***-****

DDA Eng.

Pedro Duquezna

305-***-****

TLC Eng for Architecture

Angel Lorenzo

305-***-****

Zyscovich Architects

Rafael de la Sierra

305. 372.5222 x 1137

Harper Partners, Inc. /Perez and Perez

James Griffin

305-***-****

Bermello Ajamil and Partners

Willy Bermello

305. 860.3735

Wolfberg Alvarez and Partners

David Wolfberg

305. 666.8562

The Job Seeker's filters are :

Industry - Architecture, Construction

Job Functions - Architects, Computer Aided Design CAD, Management/Admin

US Locations - Florida

-Daytona, Florida-Ft. Lauderdale, Florida-Ft. Myers/Naples, Florida-Gainesville/Jacksonville, Florida-Melbourne, Florida-Miami, Florida-Orlando, Florida-St. Petersburg, Florida-Tallahassee, Florida-Tampa, Florida-West Palm Beach

Country - United Arab Emirates

Salary Requirements - 75K to 99K, 100K to 149K

The Recruiter Network

http://www.TheRecruiterNetwork.com

If you have any questions or suggestions please contact us at the web site.

Thank you66.98.224.79] by mail.easytrieve.com with SMTP (EHLO apple.theorganicnetwork.com)

(ArGoSoft Mail Server Pro for WinNT/2000/XP, Version 1.8 (1.8.9.3)); Wed, 19 Nov 2008 05:56:35 -0600

Received: (qmail 23882 invoked by uid 501); 19 Nov 2008 05:42:11 -0500

Date: 19 Nov 2008 05:42:10 -0500

Message-ID:

abp0ck@r.postjobfree.com>

To: abp0ck@r.postjobfree.com

Subject: Project Architect - CA Manager

From: abp0ck@r.postjobfree.com

Reply-To: abp0ck@r.postjobfree.com

Return-Path:

Dear Recruiter,

TheRecruiterNetwork.com is delivering the following Job Seeker profile. You are receiving this targeted Job Seeker profile because you created a Recruiter account at our web site and this Job Seeker Profile matched your filter selections.

http://www.TheRecruiterNetwork.com

DO NOT REPLY TO THIS EMAIL. If you are interested in this Job Seeker, please contact them directly.

If you wish to CHANGE your filter selections or STOP receiving Job Seeker profiles, please login to our site using this Email address. If you forgot your password we will send you another by clicking on Forgot Password on our home page.

Patria Sanchez

Contact: abp0ck@r.postjobfree.com

Street

: 11064

sw 79th Path

City: Miami

State: Florida

Country: United States

Zip: 33156

Years of Work Experience: 20+

Current Salary: 75K to 99K

Current Duties: Project Architect, Project Manager,

Construction Administration Manager

Looking for: Architecture

Construction

Maximum Travel: 25

Position Type: Either

College Attended: UNPHU - DR

Highest Degree Attained: Masters

Available Start Date: 2008-11-18

Cover Letter

I have enclosed my resume to provide a summary of my qualification and background for your review.

Throughout my career as an Architect, I have maintained the highest performance standards within a diverse range of the architectural process from development of the construction documents and administration to project management which is clearly illustrated by my past successes. As a Construction Administration Project Manager for projects in Miami, Florida, I streamlined operations and reduced project cost by negotiating competitive rates and pricing with subcontractors and providers.

Additionally I facilitated the implementation of design changes and additional services that significantly increased the company's profile.

Currently, I am seeking and association with a company that can benefit from my expertise as an Architect and Construction Manager with excellent organizational and communication skills, an outstanding work ethic and the ability to work equally well in both team oriented and self directed environments.

I would welcome the opportunity to discuss my qualifications and candidacy in further detail. Thank you for your time and consideration.

Resume

Patria E. Sanchez

11064 SW 79th Path, Pinecrest, Fla. 33156

Voice: 786. 245 .9081

E-mail: abp0ck@r.postjobfree.com

Objective:

Pursuing a position in Architecture or Construction Administration Field, in which my skills and abilities would contribute to the development of both, my employer and myself.

Professional Experience:

Graduated Architect that earned a Master degree in Architecture at U.N.P.H.U, D.R. in 1987, with 25 years of professional experience in Design, Architectural document development and M.E.P. coordination. Knowledge of specifications, construction details, general conditions, construction sequences, project documentation and phasing.

Experience managing multiple projects. Production team leadership from Design through Construction Administration. Develop work plan, schedules, manage consultants. Client interface. Submittals and Shop drawing review.

Zyscovich Architects

January 2002

2008

Role: Project Manager Construction Administracion

Responsible for planning, interpreting, organizing, and managing projects through all phases of development. Establishing and monitoring budgets, managing project team and preparing schedules to ensuring efficient utilization of resources.

Overseeing the architectural process from proposal through construction administration on a project.

Responsible for establishing client relationship, directing and monitoring all the following activities:

Preparation/ responding RFIS and BID specifications for remodeling and new construction projects

Recommendations to GC corporate staff, and committees concerning building design and construction.

Planning for all remodeling and new construction by participating in preconstruction planning meetings

Visits all construction projects as needed to assure that plans, specifications, codes and regulations are being observed and followed.

Develops and supervises a quality-control program for materials used in new construction and remodeling.

Reviews and approves for submission bills submitted by building contractors, testing laboratories, consulting engineers and surveying firms.

Recommendations if any project change orders for approval with comment and cost analysis.

Directing site demolition and preparation projects prior to commencement of remodeling or new construction.

Recommendations for acceptance of completion reports and acceptance of remodeling and/or new construction.

Supervises and approves substantial completion and acceptance of warranty work by General contractors.

Verification of General contractor compliance with ADA; other issues regarding public accessibility for all construction projects.

Obtaining and safeguards original blueprints and revisitions [As Built set] for all work accomplished on remodeling or new construction projects.

Maintaining necessary records and prepares periodic field reports for Owner.

Construction Administration Projects

The Meridian Mid raise Multi use Building, Miami Beach. Multiuse development project: office spaces, maintenance facilities.

Grove Garden Mid Raise Residential Building on Coconut Grove [95% completed] Multiuse development project: office spaces, maintenance facilities

The Elan Condominiums [Foundation phase] on 21st and Collins ave. Renovation Multiuse development project: condominiums, retail spaces, maintenance facilities.

Role: Project Architect Production Manager - Quality Control

Responsible for the planning and coordination of the design documentation of a project during Schematic through Construction Document phases in conjunction with the Senior Project Manager. Coordinate work assignments of a diverse project team as well as coordinate with clients, consultants and contractors for a number of Mid-Raise and High-Raise Buildings under construction / Const.Doc and Interior Built out Phase that includes the following:

1390 Brickell Bay -High raise Multi use Building,

The Elan - Mid Raise Residential Building in South Beach.

Doral Shoma Homes - at Doral Recreational Building / Gatehouse

The Grove Garden - Mid raise Multi use Building in Coconut Grove.

Harper Partners- Perez and Perez - Joint Venture

June 2000 - January 2002

Role: Project Manager / Field Architect

American Airlines - North Terminal C-D Infill - 739 G Ramp Interior Finish Out- Miami International Airport.

Compromises the C-D Infill Ramp Finish currently under construction on the North Side of the existing Bldg. Provides Support for permanent and interim baggage System, Ramp operation Break Room relocation, Facilities Maintenance and Lockers Relocation, AA Maintenance Administration Offices as well as Barriers and Pedestrians access of ways and tug drives. Is aprox. 170,000 sq.ft. Project.

American Airlines - North Terminal 739 C - Concourse D Remodel Miami International Airport.

Field verifications for this major building to be constructed under North Terminal Development, to provide design continuity and coordination not already included in other adjacent Projects including Fin-Out (MIA-739G, 739A, 739F and 739H). Coordination of 5 new Gates with existing ones to remain under Project 739G.

Role: Project Architect

American Airlines - North Terminal 739 A C-D Infill Level 2, 3, and 5 Interior Finish Out - Miami International Airport.

Compromises the C-D Infill level 2, 3, and 5 Finish out.

American Airlines - North Terminal 739 F - D Extension Interior Finish Out Miami International Airport.

Involves the design and construction of interior finishes for the d-Extension Bldg. Shell. (741E). This work encompasses approximately 113,000 square feet of space at the ramp level which will be used for administrative offices, restrooms and other support facilities.

American Airlines - D Extension 741 A Building shell. Miami International Airport.

This project includes design and construction of a new building shell that will extend existing Concourse D. This three level concourse structure will enclose approximately 452,000 square feet and will comprise 13 international gates. Work will include demolition and reconstruction of parts of existing concourse D.

Bermello, Ajamil and Partners

Jan 1998 - June 2000

Role: Project Architect - Production Manager Job Captain

Project Designer providing design continuity and leadership throughout the entire project. Developing the initial design concept and coordinates with other team members to further develop the design in final concept, schematic and design development project phases and

Construction Documents on the following High rise buildings:

"Coral View"

"Brickell View" Multiuse development project: office spaces, maintenance facilities

B.A.P. Multiuse development project: office spaces, maintenance facilities, 10 floors of Parking Garage, 485 residential units, approximately 20,000 sq. ft. structure for Storage, Retail and Restaurants.

Wolfberg, Alvarez and Partners

January 1996 -Jan 1998

Role: Project Architect

For a number of Shell and Interior Projects for American Airlines - North Terminal, at Miami International Airport that includes the following:

American Airlines - North Terminal C-D Infill Foundation, Demolition and Shell- Miami International Airport.

Foundation, Demolition and Shell Packages for AA Terminal Concourse C-D Infill at Miami International Airport.

The C-D Infill Shell project will be constructed on the North Side of the existing Bldg.. Is a three story Shell Structure with 570,

000 SF with and elevated guide way structure for the proposed Automated People Mover (APM) and with a structure of approximately 57,000 SF To house the maintenance and storage facility for the APM system. Includes a third component of a ground traffic control tower for American Airlines.

Complete architectural and engineering services for a 267,000 SF development consisting of office, residential, hotel, and retail and entertainment facilities.

City of Coral Gables Maintenance and Storage Facilities, Coral gables, Florida.

Project Architect for the design of a new 425,000 SF multi-use, multi-level maintenance and storage areas.To accommodate the City's fleet maintenance and storage operations. The current facility, located in Coral Gables, houses several of the City's departments and divisions including automotive Parking, public Service, Public Works, and Purchasing

Extended Stay America

Architect for architectural and engineering services for site adaptation of prototype hotel designs for 25 locations throughout the State of Florida.

American Wilderness Experience, Ontario, CA; Grapevine, TX. And Tempe, AZ.

Architect for A/E/I design of three 30,000 SF multi-purpose entertainment centers. Each project includes a restaurant, shops, presentation chambers, geography and animal exhibits, and ancillary support services such as food storage holding pens and kitchens. A mezzanine level of approximately 1,500 SF will be utilized as offices and equipment storage.

Ronald Frazier & Assoc

.

January 1994

- January 1996

Role: Architect

Satellite "E" Expansion of the existing Concourse Satellite at Miami Int.Airport

This project includes design of a new building shell that will expand existing Concourse "E".

Production of Architectural and Engineering Design/ Construction Documents.

Bliss & Nyitray, Inc

. Consulting Structural Engineers /Joint Venture with H.O.K. Architects

June 1992

- December 1994

Role: Project Architect

Design Development and Structural Construction Doc. Phase.

Architectural Production and Structural Coord. / Computerized drafting in AutoCAD

For Sports Facilities, that includes Pro-Player Stadium, Jupiter Sport Facility in Jupiter Fl., Tampa NFL Football Stadium in Tampa Fl., Baltimore NFL Football Stadium known as Cleveland Redskinds NFL Football Stadium in Washington D.C Jacksonville Municipal Baseball Stadium.

Z. W. Jarosz Architects, P.A

.

1991

Role: Independent

Subcontractor - Architect

Complete responsibility for Design Development, Production of Working Drawings in AutoCAD R-13for Windows and Soft desk Architectural 7.2

Coordinate with Clients and Consultants in new Residential built.

Ramn Pacheco, Architect and Planner

1991

Role:

Independent

Subcontractor Architect

Responsible of Design Development, Preliminary Drawings for the City of Coral Gables and Working Drawings for 8 Houses to be built by G.P. Builders III, in Cocoplum, C.G., operating AutoCAD R13 for Dos.

Seckinger and Assoc

., Architects and Interior DesignerFebruary 1991

Role:

Independent

Subcontractor Architect

Schematic Design, Design Development and Construction Documents for "Round Hill Hotel" Villas in Montego-Bay, Jamaica. Working Drawings for 300C- Office Bldg. In Boca Raton, Fla. Operating AutoCAD R12 and Addcad R12.

Archipro Staff, Agency

1990

Architect- AutoCad Operator

for short-term Positions

Duties and responsibility are performing Architectural Design, Working Drawings and Computerized Drafting in new Residential Built and Renovations. Design Ind. Kitchens, VIP Rooms, Bars and Guest Areas for Hotels in South and Central America. Operating Autocad R13, Advance Autocad R12, AEC, ASG and Summa-Digitizer for:

Siskind, Carlson, and Partners, Architects

Margaret Tyler Interiors, Interior Designer

Caribbean Producers LTD

., Ind. Kitchens

Slack and Rodriguez, Interior Designer

Snow wise,

Interior Designer

J.M. Chiew, Architects

1990



Contact this candidate