Michael R. Fontenot

825 Laura Ln.

Vidor, Tx. 77662

Home: 409-***-****

Cell: 409-***-****

E-mail: aboy5v@r.postjobfree.com

Qualifications:

Sixteen plus years of comprehensive strategic planning and scheduling experience in Project Controls Oil and Gas Industries.

Proficient in the Initiation, Preparation, Execution, & Termination Phases of Turnarounds

Demonstrated Master Planning and Master Scheduling abilities for oil & gas industries.

Demonstrated ability to adapt and implement technological changes.

Proven problem solving abilities, including root case analysis of operational problems.

Proficient in Cost Accounting through Planning, Scheduling and Procurement activities.

Proficient in all Primavera Software P3 P6 P6.1, P7.0,P8.1

Proficient in SDK Software Development Kit for Primavera Importing & Exporting.

Proficient in MS MPP, MS Excel, MS Word, MS PowerPoint, MS Outlook.

Excellent knowledge of oil & gas industry standards, specifications, and regulations.

The ability to understand engineering documents, codes and brands.

The ability to monitor and report project budget, schedule, and scope status.

The ability to read contracts and interface information directly into P6 schedule.

Excellent knowledge of cradle to grave scheduling from concept, design, engineering, procurement, fabrication & mechanical completion to systems completion.

Professional Experience:

Proficient in Gantt Charts corresponding with earned value analysis.

Proficient in detailed P6 & P7 job plan packages, (resource and duration loaded).

Proficient in P6 & P7 schedule shell & infrastructure to include calendars, resource codes, activity codes, project codes, global codes & filtering codes including various layouts for clients.

Develop P6 & P7 Master Schedule for Process, I&E, & Mechanical divisions.

Supported JV Engineering Project Controls efforts to: replace Valero?s Three Rivers Refinery Fluid Catalytic Converter Reactor (FCCU)-(FCC Rx) and associated Riser Top Temperature (RTT), build a Selective Catalytic Reducer (SCR), and multiple Heater & Boiler Re-tube.

Supported Becht Eng. efforts to: Upgrade 26 substations and UPS Systems at Three Rivers Tx. Valero.

Proficient in setting up & developing integrated P6 Master Schedule for multiple clients and execution vendors.

Proficient in Unit walk downs and audit on equipment and piping.

Knowledge of Towers, Pressure Vessels, Exchangers, Heaters, Reactors, Tanks, Cyclones, Amine Units, Alky Units, Crude Units, Hydrogen Units, Diesel Hydrotreater

Work with Valero Plant Manager & Construction Coordinators to plan field activities.

Maintain daily and monthly and reports for Project Controls Manager.

Develop job scope with Weatherford Int. area production coordinator, area maintenance supervisor and engineers.

Supported Weatherford Int. In onshore & offshore operations and developed Master Schedules for multiple clients and vendors.

Out to sea site visits with Weatherford Int. for hub & flex joint progress verifications.

Weatherford International

Process Controls / Lead Planner / Lead Scheduler

BP/ExxonMobil/Shell/Conoco Phillips/Chevron

Houston, Tx. Nov. 07, 2011 to May 11, 2012

Developed an Integrated Primavera P6 Master Schedule for multiple EPC Offshore Hubs for Marine Well Containment Vessel Company & Clients: (BP/ExxonMobil/Conoco Phillips/Shell/Chevron).

Analyze multiple master schedules for clients & sub-contractors to ensure Primavera P6 databases are in sequence with in-progress projects.

Ensure contractor and vendor schedules for offshore hubs are in compliance with project specifications.

Ensure sub-contractor schedule for offshore flex joint installations are in compliance with project specifications.

Maintain project related primavera P6 database schedule files, codes, calendars, etc.

Report weekly look-a-heads and critical path schedules to contractor and company reviews.

Conduct weekly critical path review meetings with contractor & company.

Responsible for the cost/scheduling and contract administration activities for the fabrication yard facilities

Compile contractor and sub-contractor progress reporting into overall project progress system.

Developed detailed work packages for proper step-out of each scheduled job.

Developed detailed work books for supervision and foremen for continued progress.

Provide schedule & progress measurement updates to weekly and monthly reports per project specification.

Interface with other contractor disciplines (engineering, procurement, and construction, completions) to develop & maintain the schedule and progress databases as required.

Becht Engineering

Eagle Ford Crude & Electrical Expansion

Lead T/A Planner / Scheduler (Mechanical and I&E)

Valero Oil & Gas Refinery

Three Rivers, TX June 2011- Oct. 2011

Responsible for developing the Turnaround P7.0Master Schedule for the Valero refineries FCCU/FGRU/HGRU/SRU/DHT/ALKY Shutdowns and the Valero Electrical Reliability Expansion Projects, also for all sub contractors & vendors.

Assisted Turnaround Manager in the initiation, preparation, execution, and termination of Turnaround Procedures.

Co-Chaired Steering Group meetings for policy, strategy and to monitor progress and performance of the Turnaround.

Assisted in the organization structure for the plant team in negotiation changes.

Developed detailed work packages for proper step-out of each scheduled job.

Developed detailed work books for supervision and foremen for continued progress.

Creating Progress curves and assigning resource curves to a resource role.

Verified all Activities to ensure jobs can be done in a safe & proficient manner.

Work with Primavera 7.0 for planning and scheduling.

Resource Loaded Man-hours and cost into the Primavera 7.0 schedule, including material, equipment and subcontractors.

Work with Construction Manager to Plan Field Activities.

Assisted Plant Manager in the development of Contingency Planning for discovery work.

Work closely with various project managers to analyze contractor performance.

Maintained daily and monthly and reports for Project Controls manager.

Areva Engineering

Electrical & Crude Expansion

Lead T/A Planner / Scheduler (Mechanical and I&E)

Total Chemical Refinery

Groves, Tx. June 2010 to January 2011

Assigned to the GIS Project (Gas Insulated Switchgear) and Turnaround for TOTAL Petrochemicals Planning/Scheduling Team.

Responsible for detailed engineering and mechanical P6 Master Schedule for TOTAL Petrochemicals.

Developed detailed work packages for proper step-out of each scheduled job.

Developed detailed work books for supervision and foremen for continued progress.

Developed Master Schedule for Total Refinery FCCU/FGRU/HGRU/SRU/DHT Turnarounds and all sub-contractors.

Assisted Management TOTAL Petrochemical team in the initiation, preparation, execution, and termination phases.

Primavera P6 to generate reports and look ahead schedules, and I&E coding.

Interfacing directly with client and contractor to ensure correct work scope, durations, and resources are captured in schedule.

CDI Engineering

Lyondell Refinery

Lead T/A Planner / Scheduler (Mechanical and I&E)

Houston, Tx. July 2008 to Aug. 2009

P6 Planning and Scheduling all electrical and mechanical activities for Lyondell Turnaround for multiple Unit Shutdowns FCCU/FGRU/HGRU/SRU/CRU.

Responsible for the development of P6 Master Schedule for Lyondell Refinery.

Responsible for developing detailed unit start up activities for unit operations.

Responsible for developing detailed work packages for multiple scheduled jobs.

Responsible for developing detailed work books for supervision and foremen.

Responsible for developing new infrastructure for document control library.

Walking down packages to insure proper step out is in accord with job.

Reported all significant changes directly to Project Manager.

ExxonMobil

LNG Terminals

Lead Planner/Scheduler

Sabine Pass, Tx. Feb. 2007- Dec. 2007

Planned and Develop Primavera & MPP Master Schedule for ExxonMobil?s LNG 230 kV High Lines, 230kV Substations, LNG Terminals, New Process Units, Refrigeration Units and Pressurized LNG Sphere Tanks.

Reported all major changes directly to ExxonMobil Project Manager.

Developed detailed work packages for LNG Terminals, Substations, & High Lines.

Maintained daily and monthly Primavera reports for Project manager.

Budgeting and forecasting and generating monthly reports.

Cost reporting schedule and distribution list.

Co-Chaired formal agenda meetings to clearly define work objectives.

Review LNG Terminals, Substation and MCC data packages and specifications to procure materials from Powell Industries.

Turner Group Corp.

Conoco Phillips

Westlake Petrochemical Refinery

Lead T/A Planner / Scheduler (Mechanical and I&E)

Sulphur, LA. July 2006- Jan. 2007

Planned & Scheduled all Multiple Unit Turnarounds for Conoco Phillips.

Field verified all jobs to ensure jobs can be done in a safe & proficient manner.

Reported significant issues directly to the Turnaround Manager.

Ensured the collection and collation of basic data.

Responsible for developing detailed work packages for multiple scheduled jobs.

Responsible for developing detailed work books for supervision and foremen.

Assisted in developing turnaround steering group ensuring the success of the Turnaround.

Advised steering group on specific Turnaround requirements.

Responsible for interacting with Vendors for procuring all turnaround material.

Maintained daily and monthly reports for Project manager.

Monitored Progress against turnaround objectives.

Integrated schedules from engineering, logistics, and subcontractors.

Turner Group Corp.

Citgo Oil, Gas and Lubricants Refinery

Lead T/A Planner / Scheduler (I&E and Mechanical)

Sulphur, LA March 2005- July 2006

Planned all turnaround projects and shutdowns projects for Citgo Oil.

Field verified all jobs to ensure jobs can be done in a safe & proficient manner.

Primavera Software and SAP were used for the planning and scheduling of turnaround.

Responsible for developing detailed work packages for multiple scheduled jobs.

Responsible for developing detailed work books for supervision and foremen.

Assisted in developing turnaround steering group ensuring the success of the Turnaround.

Responsible for interacting with Vendors for procuring all turnaround material.

Maintained daily and monthly reports for Project manager.

Monitored Progress against turnaround objectives.

Integrated schedules from engineering, logistics, and subcontractors.

CB&I Constructors

Air Liquide Hydrogen Plant

Project Field Planner/Scheduler

El Segundo, CA March 2002- Feb. 2005

Planned all new capital projects for Air Liquide Hydrogen Plant.

Responsible for the day to day Project control and planning.

Field verified jobs to ensure jobs can be done in a safe & proficient manner.

Primavera Project Planner P3 for planning and scheduling activities.

Maintained weekly and monthly reports for construction manager.

Budgeting and forecasting, generating monthly reports.

Review engineering drawings and specification to procure materials needed.

SLC Southwestern Line Constructors

Planner / Scheduler

Houston, Tx. November 2000- February 2002

Generating Primavera 3.1 schedules and reports for Siemens Companies.

Produced P3 schedules and reports for Siemens Project Manager.

Managed turnarounds, maintenance, and working with engineering.

Procured all materials for job site including mechanical, electrical and civil materials.

Working Industrial process duties include troubleshooting installing and maintaining plant electrical systems. Installation of switchgear and MCCs.

Knowledge and use of Productivity tools:

Proficient in MS Office Applications MS Excel,

MS PowerPoint, MS Access, MS Word

Proficient in SDK Software Development Kit

Proficient in Primavera Project Planner 6.2

Proficient in Primavera Project Planner 7.0

Proficient in Primavera Project Planner 8.1

Proficient in Microsoft Project 2003-2007

Email: aboy5v@r.postjobfree.com

aboy5v@r.postjobfree.com

Copyright © 2003-2005 Cooper Pugeda Management, Inc. All rigths reser