Post Job Free
Sign in

Project Manager

Location:
Albuquerque, NM
Posted:
October 05, 2012

Contact this candidate

Resume:

Matthew M Caulfield

Email: *********@********.***

Address: **** ***** ****** ** **

City: Albuquerque

State: NM

Zip: 87120

Country: USA

Phone: 303-***-****

Skill Level: Senior

Salary Range: 92,000 - 111,000

Willing to Relocate

Primary Skills/Experience:

Project Management - Wal-mart storage move project

Engagement Management - State of NY and USCC

DS4000 (FastT) storage installation, implementation, maintenance

DS5000 storage installation, implementation, maintenance

DS8000 storage installation, implementation, maintenance

ESS (Shark) implementation, maintenance

SVC installation, implementation, maintenance

V7000 storage installation, implementation, maintenance

Nseries (NetApp) installation, implementation, maintenance

Change Control management

SAN Design and implementation

Mcdata EFCM and switch zoning

IBM DCFM and IBM /Brocade switch zoning

Cisco SAN management, implementation and zoning

Cisco Director and Switch Implementation

Cisco CLI and script Implementation

TDMF for IP implementation stand alone and cluster servers

TDMF for Unix implementation

TDMF for zOS implementation

Data migration Windows clusters and stand alone servers

Data migration Unix

Robocopy Windows servers and cluster environments

TPC Tivoli Productivity Center for Data,SVC and Disk implementation version 3.13, 3.1, 3.3,3.0,4.1 and 4.2

TPC reporting and performance monitoring version 3.13, 3.1, 3.3,4.1,4.2

ATL, LTO implementation and management

Windows 2000, 2003,2008, XP Administration

Veritas Netbackup

EMC Navisphere

EMC Storage -Clariion, DMX implementation

StorageTek tape and library systems

Diagnostics and Troubleshooting

Solaris Administration

AIX Administration

Educational Background:

Associates of Applied Science in Electronics Technology

Front Range Community College, United States of America, 1995

Job History / Details:

Storage Information technology specialist with over 25 years of diverse experience in business, medical, manufacturing, and government industry sectors. Specializing in Storage Area Network management with strengths in SAN Design, Raid disk storage, McData switches, and tape backup solutions. Expert skills in troubleshooting and diagnosis. Proven ability to lead, manage, design, plan, and implement IT business solutions that support new applications, processes, and complete lines of business. Consistently recognized for outstanding technical and service delivery performance. Expert leadership and communication skills. Received numerous professional performance awards from the EDS and StorageTek Corporation, including recognition for leadership, planning, and technical ability

Career history 03/2012 10/2012 Presbyterian Health Systems

Systems Engineer II

SVC storage Administration

NetAPP administration

IBM DS8000,DS4800, DS5300

Brocade DFCM administration

06/2006 - to 03/2012 IBM, United States of America

IBM Accredited Advisory IT Specialist

Storage Specialist: IBM, Boulder, CO

* TPC Total Productivity Center Implementation and Admin

* SVC Implementation and management

* (NetApp)Nseries implementation

* Storage Management and administration

* Project Management and implementation

* Engagement Management

* ATL Library and LTO Administration

* TSM experience and management

* (FastT)DS4000 installation and management

* DS8000 Implementation

* Change control management

* Storage design and architecture

* McData, Brocade, Cisco switch management

* TDMF zOS, Unix implementation

* EMC Storage - Clariion, DMX

* Cisco Director /Switch Implementation

* Solaris administration

* AIX administration

12/2005 - 06/2006 IBM (Pomeroy), United States of America

San Enablement Specialist

* Switch and Director diagnostics and troubleshooting

* SAN planning, architecture and design

* Carving of storage Luns on IBM ESS Sharks, FastT-DS4000

* Carving of storage Luns on DS8000 and EMC disk.

* HBA and array tuning

* Lun Balancing

* SAN project Planning

* SVC Implementation and management

* Storage Management

* Project Management

* McData switch management and zoning

* SAN Design

04/2002 - 12/2005 EDS (StorageTek), United States of America

Distributed Systems Senior Technician

* Remote diagnostics of Unix servers and system applications

* Administration of Solaris UNIX servers

* Install and maintain Windows NT/2000 servers

* Troubleshoot Data storage systems

* Remotely resolve system interruptions to restore server

operations

* Configure and resolve issues regarding Engenio storage arrays.

* Install and maintain storage area networks and Blue Arc NAS server equipment

* Configure SAN HBA s

* Configure and maintain Brocade switches

* Install and service CrossRoads Routers

* Change control and Project management

* Team lead

04/1992 - 04/2002 StorageTek, United States of America

Senior System Support Representative

Remotely support Unix servers

Manage and support Engenio storage arrays

Install and maintain Engenio and Clariion disk

Install and maintain StorageTek libraries

Install and maintain StorageTek Tape drives

Install and maintain Sun Servers and workstations

Install and maintain HP servers

Install and implement EMC Clariion and Navisphere

Assignment history 06/2010 - 04/2011 (Acxiom)

11 month(s) Acxiom Staff Augmentaion

Project Description:Implementation and storage monitoring of DS8700, DS8800

Implementation and storage monitoring of DS5300

Implementation and storage monitoring of XIV storage

Implementation and storage monitoring of TPC reporting

installation of Windows OS and TPC servers and CIMOMs

04/2010 - 06/2010 (Harford Insurance)

3 month(s) TPC Implementation

Project Description:Implementation of TPC for reporting on SAN and NAS NetAPP. storage Capacity and performance reporting on E

02/2010 - 04/2010 (GEICO)

3 month(s) GEICO Storage project

Project Description:Implementation of TPC, install TPC agents on multiple clients, Solaris, AIX, Linux servers.

Migration of data to SVC, SVC implementation.

XIV implementation and storage allocation.

12/2009 - 01/2010 Client (Printpack)

2 month(s) SVC DS5300 Implementation and Migration

Project Description:SVC Implementation, migration to SVC managed storage

Implementation of DS5300

Migration planning and migration from IBM Shark to DS5300

AIX host prep

VMware migration

Windows host prep

11/2009 - 11/2009 Client (Level 3 Communications)

1 month(s) SVC Implementation

Project Description:Planning and Implementation of SAN Volume Controller

Set up Managed Disks and Virtual Disks

Set up Storage and Hosts

SAN configuration on Brocade Switches

Storage Configuration

11/2009 - 11/2009 Client (IBM Service Master)

1 month(s) DS8000 and SVC implementation

Project Description:Plan DS8000 implementation

implement Storage on DS8000

Implementation of SVC and Host connections

San configuration

10/2009 - 11/2009 Client (Georgia Technology Authority)

2 month(s) SVC Planning and Documentation

Project Description:Design training Documents for SVC

Site Planning for SVC

Performance planning and design

SAN planning

09/2009 - 11/2009 Client (US Cellular)

3 month(s) Cisco Director Implementation

Project Description:Planning for SAN Migration

Install Cisco 9513 Director Switches

CLI scripting for Cisco Switches

Fabric Manager Implementation

Fabric and Device Manager implementation

06/2009 - 09/2009 Client (US Cellular)

4 month(s) DS8000 Migration and TPC performance monitoring

Project Description:DSCLI DS8000 Scripting

HPUX Unix scripting

TPC implementation and report generation.

Pull TPC reports and design Excel reports and charts

Engagement Management for this project

TPC performance monitoring, charting performance trends.

05/2009 - 06/2009 Client (ACS Dallas)

2 month(s) SVC Flashcopy automation

Project Description:Train admins on Flashcopy implementation for SVC

SVC implementation

Write automation scripts for Flashcopy for SVC

04/2009 - 06/2009 Client (Sungard)

3 month(s) TDMF Migration

Project Description:Support TDMF migrations

TDMF IP Unix several servers

TDMF Solaris, AIX

support and train Sungard admins.

Solaris administration

AIX administration

Planning and implementing migrations.

Troubleshooting migration problems

Provide support throughout migrations.

04/2009 - 04/2009 Client (Kirtland AFB)

1 month(s) Ds8000 Implementation

Project Description:Implement DS8000 storage

Scripting and carving storage

Training of admins

Planning of storage

04/2009 - 04/2009 Client (City of Little Rock)

1 month(s) Ds4000 implementation

Project Description:Implement DS4300 storage,

Upgrade firmware.

Windows 2008 administration

12/2008 - 04/2009 Client (BP America)

5 month(s) Chicago AMDC Infrastructure Build Project

Project Description:Install, Implement and Configure CISCO 9513,9506 Director SAN switches

Write CLI scripts for CISCO switches.

CLI and Fabric Manager Implementation

Configure EMC DX4-480 Storage

Install, Configure SUN M5000 Servers

Configure NetApp 2050 Filers.

Cisco Network (Ip) implementation and cabling.

VTL implementation

Change Control and Documentation

11/2008 - 12/2008 Client (Orleans Parish School District)

2 month(s) Orleans Parish School District SVC Implementation

Project Description:Install and Implement SVC

Install and Implement DS4200 Storage

Install IBM/Brocade SAN32B-3 switches and zoning

Install and configure DCFM (Data Center fabric Manager)

Merge New switches to Old Brocade SAN switches

Create Zoning and Zoneset

Add present DS4700 Storage to SVC

Add old 8255 Blade center and new 8255 Blade center to SVC

Migrate data from Present Storage to Virtual Disks in SVC

10/2008 - 11/2008 Client (Wachovia)

2 month(s) TDMF IP Cluster Migrations

Project Description:Train Client in TDMF Cluster migrations. Implement and monitor TDMF migrations.

Assist in migrations

write play books for admin use

10/2008 - 10/2008 Client (ATT)

1 month(s) SVC Implementation

Project Description:SVC Implementation attachment to EMC DMX storage and Sun Solaris Hosts

Install 4 Nodes and instruct Client in SVC capabilities.

SVC planning and implementation

10/2008 - 10/2008 Client (Lockheed Martin)

1 month(s) SVC implementation

Project Description:SVC Implementation attachment to 4 VMware hosts. Attachment to DS4700 Storage

Zoning to Hosts, SVC, Storage on Brocade (IBM ) switches.

Train Client in SVC system

09/2008 - 10/2008 Client (Turner Broadcasting)

2 month(s) DS4000, Cisco, Linux RedHat Implementation

Project Description:Install DS4700 and DS4800 Storage. Implement, create hosts and allocate storage. Zone using Cisco Fabric Manager and Device Manager. Install IBM x-series servers (3) Install Linux RedHat Enterprize. Install Qlogic HBAs and drivers. Install RDAC and present storage to applications. Install cluster servers.

08/2008 - 08/2008 Client (BNY Mellon)

1 month(s) SDD - AIX upgrade

Project Description:Upgrade SDD on AIX cluster servers, 6 servers to version supported by DS8000

07/2008 - 08/2008 Client (Methodist Medical Center - Houston)

2 month(s) SOFTEK DATA MIGRATION

Project Description:Setup TDMF migration for Windows cluster server. Migrate data.

11/2007 - 11/2007 Client (Cincinnati Children's Hospital)

1 month(s) Data Migration Cincinnati Children's Hospital

Project Description:DS8000 Implementation and installation

TDMF zOS Installation and Implementation

11/2007 - 11/2008 Client (Disney)

13 month(s) Data Migration Services

Project Description:Planning and implementation for Data Migrations

Migration of Data for Microsoft Windows environment. Cluster migration.

Migration of AIX server storage from EMC to IBM DS8000

Robocopy migrations of Windows stand alone and cluster servers

TDMF IP migrations of Windows stand alone and cluster servers

DS8000 installation and configurations.

HBA configurations

TDMF Unix Solaris migrations.

Veritas configuration

EMC storage Configuration

11/2007 - 03/2008 Client (Kootenai Medical Center)

5 month(s) Migration TDMF

Project Description:Installation and implementation of DS4800 storage

TDMF IP Windows migration of FastT to DS4800

Brocade SAN configuration

04/2007 - 10/2007 Client (First Data Corporation)

7 month(s) Storage Consolidation and TPC reporting

Project Description:Implement and monitor TPC for Data

Train FDC Engineers in implementation of TPC for Data

Pull TPC reports and design Excel reports and charts

Create SAN designs and Visio SAN diagrams

Create Power Point Documents for Client presentation

Analysis of TPC reports for Data Rationalization

07/2006 - 03/2007 Client (Wal-mart)

9 month(s) Wal-mart Storage move project

Project Description:Project management of storage frame moves

DS4000 - Installation, implementation and troubleshooting issues

Brocade - switch zoning and maintenance

Disaster recovery

ATL - implementation and maintenance

TSM server - implementation and maintenance

SVC- installation, implementation

Nseries - installation, implementation

Change control



Contact this candidate