Matthew M Caulfield
Email: *********@********.***
Address: **** ***** ****** ** **
City: Albuquerque
State: NM
Zip: 87120
Country: USA
Phone: 303-***-****
Skill Level: Senior
Salary Range: 92,000 - 111,000
Willing to Relocate
Primary Skills/Experience:
Project Management - Wal-mart storage move project
Engagement Management - State of NY and USCC
DS4000 (FastT) storage installation, implementation, maintenance
DS5000 storage installation, implementation, maintenance
DS8000 storage installation, implementation, maintenance
ESS (Shark) implementation, maintenance
SVC installation, implementation, maintenance
V7000 storage installation, implementation, maintenance
Nseries (NetApp) installation, implementation, maintenance
Change Control management
SAN Design and implementation
Mcdata EFCM and switch zoning
IBM DCFM and IBM /Brocade switch zoning
Cisco SAN management, implementation and zoning
Cisco Director and Switch Implementation
Cisco CLI and script Implementation
TDMF for IP implementation stand alone and cluster servers
TDMF for Unix implementation
TDMF for zOS implementation
Data migration Windows clusters and stand alone servers
Data migration Unix
Robocopy Windows servers and cluster environments
TPC Tivoli Productivity Center for Data,SVC and Disk implementation version 3.13, 3.1, 3.3,3.0,4.1 and 4.2
TPC reporting and performance monitoring version 3.13, 3.1, 3.3,4.1,4.2
ATL, LTO implementation and management
Windows 2000, 2003,2008, XP Administration
Veritas Netbackup
EMC Navisphere
EMC Storage -Clariion, DMX implementation
StorageTek tape and library systems
Diagnostics and Troubleshooting
Solaris Administration
AIX Administration
Educational Background:
Associates of Applied Science in Electronics Technology
Front Range Community College, United States of America, 1995
Job History / Details:
Storage Information technology specialist with over 25 years of diverse experience in business, medical, manufacturing, and government industry sectors. Specializing in Storage Area Network management with strengths in SAN Design, Raid disk storage, McData switches, and tape backup solutions. Expert skills in troubleshooting and diagnosis. Proven ability to lead, manage, design, plan, and implement IT business solutions that support new applications, processes, and complete lines of business. Consistently recognized for outstanding technical and service delivery performance. Expert leadership and communication skills. Received numerous professional performance awards from the EDS and StorageTek Corporation, including recognition for leadership, planning, and technical ability
Career history 03/2012 10/2012 Presbyterian Health Systems
Systems Engineer II
SVC storage Administration
NetAPP administration
IBM DS8000,DS4800, DS5300
Brocade DFCM administration
06/2006 - to 03/2012 IBM, United States of America
IBM Accredited Advisory IT Specialist
Storage Specialist: IBM, Boulder, CO
* TPC Total Productivity Center Implementation and Admin
* SVC Implementation and management
* (NetApp)Nseries implementation
* Storage Management and administration
* Project Management and implementation
* Engagement Management
* ATL Library and LTO Administration
* TSM experience and management
* (FastT)DS4000 installation and management
* DS8000 Implementation
* Change control management
* Storage design and architecture
* McData, Brocade, Cisco switch management
* TDMF zOS, Unix implementation
* EMC Storage - Clariion, DMX
* Cisco Director /Switch Implementation
* Solaris administration
* AIX administration
12/2005 - 06/2006 IBM (Pomeroy), United States of America
San Enablement Specialist
* Switch and Director diagnostics and troubleshooting
* SAN planning, architecture and design
* Carving of storage Luns on IBM ESS Sharks, FastT-DS4000
* Carving of storage Luns on DS8000 and EMC disk.
* HBA and array tuning
* Lun Balancing
* SAN project Planning
* SVC Implementation and management
* Storage Management
* Project Management
* McData switch management and zoning
* SAN Design
04/2002 - 12/2005 EDS (StorageTek), United States of America
Distributed Systems Senior Technician
* Remote diagnostics of Unix servers and system applications
* Administration of Solaris UNIX servers
* Install and maintain Windows NT/2000 servers
* Troubleshoot Data storage systems
* Remotely resolve system interruptions to restore server
operations
* Configure and resolve issues regarding Engenio storage arrays.
* Install and maintain storage area networks and Blue Arc NAS server equipment
* Configure SAN HBA s
* Configure and maintain Brocade switches
* Install and service CrossRoads Routers
* Change control and Project management
* Team lead
04/1992 - 04/2002 StorageTek, United States of America
Senior System Support Representative
Remotely support Unix servers
Manage and support Engenio storage arrays
Install and maintain Engenio and Clariion disk
Install and maintain StorageTek libraries
Install and maintain StorageTek Tape drives
Install and maintain Sun Servers and workstations
Install and maintain HP servers
Install and implement EMC Clariion and Navisphere
Assignment history 06/2010 - 04/2011 (Acxiom)
11 month(s) Acxiom Staff Augmentaion
Project Description:Implementation and storage monitoring of DS8700, DS8800
Implementation and storage monitoring of DS5300
Implementation and storage monitoring of XIV storage
Implementation and storage monitoring of TPC reporting
installation of Windows OS and TPC servers and CIMOMs
04/2010 - 06/2010 (Harford Insurance)
3 month(s) TPC Implementation
Project Description:Implementation of TPC for reporting on SAN and NAS NetAPP. storage Capacity and performance reporting on E
02/2010 - 04/2010 (GEICO)
3 month(s) GEICO Storage project
Project Description:Implementation of TPC, install TPC agents on multiple clients, Solaris, AIX, Linux servers.
Migration of data to SVC, SVC implementation.
XIV implementation and storage allocation.
12/2009 - 01/2010 Client (Printpack)
2 month(s) SVC DS5300 Implementation and Migration
Project Description:SVC Implementation, migration to SVC managed storage
Implementation of DS5300
Migration planning and migration from IBM Shark to DS5300
AIX host prep
VMware migration
Windows host prep
11/2009 - 11/2009 Client (Level 3 Communications)
1 month(s) SVC Implementation
Project Description:Planning and Implementation of SAN Volume Controller
Set up Managed Disks and Virtual Disks
Set up Storage and Hosts
SAN configuration on Brocade Switches
Storage Configuration
11/2009 - 11/2009 Client (IBM Service Master)
1 month(s) DS8000 and SVC implementation
Project Description:Plan DS8000 implementation
implement Storage on DS8000
Implementation of SVC and Host connections
San configuration
10/2009 - 11/2009 Client (Georgia Technology Authority)
2 month(s) SVC Planning and Documentation
Project Description:Design training Documents for SVC
Site Planning for SVC
Performance planning and design
SAN planning
09/2009 - 11/2009 Client (US Cellular)
3 month(s) Cisco Director Implementation
Project Description:Planning for SAN Migration
Install Cisco 9513 Director Switches
CLI scripting for Cisco Switches
Fabric Manager Implementation
Fabric and Device Manager implementation
06/2009 - 09/2009 Client (US Cellular)
4 month(s) DS8000 Migration and TPC performance monitoring
Project Description:DSCLI DS8000 Scripting
HPUX Unix scripting
TPC implementation and report generation.
Pull TPC reports and design Excel reports and charts
Engagement Management for this project
TPC performance monitoring, charting performance trends.
05/2009 - 06/2009 Client (ACS Dallas)
2 month(s) SVC Flashcopy automation
Project Description:Train admins on Flashcopy implementation for SVC
SVC implementation
Write automation scripts for Flashcopy for SVC
04/2009 - 06/2009 Client (Sungard)
3 month(s) TDMF Migration
Project Description:Support TDMF migrations
TDMF IP Unix several servers
TDMF Solaris, AIX
support and train Sungard admins.
Solaris administration
AIX administration
Planning and implementing migrations.
Troubleshooting migration problems
Provide support throughout migrations.
04/2009 - 04/2009 Client (Kirtland AFB)
1 month(s) Ds8000 Implementation
Project Description:Implement DS8000 storage
Scripting and carving storage
Training of admins
Planning of storage
04/2009 - 04/2009 Client (City of Little Rock)
1 month(s) Ds4000 implementation
Project Description:Implement DS4300 storage,
Upgrade firmware.
Windows 2008 administration
12/2008 - 04/2009 Client (BP America)
5 month(s) Chicago AMDC Infrastructure Build Project
Project Description:Install, Implement and Configure CISCO 9513,9506 Director SAN switches
Write CLI scripts for CISCO switches.
CLI and Fabric Manager Implementation
Configure EMC DX4-480 Storage
Install, Configure SUN M5000 Servers
Configure NetApp 2050 Filers.
Cisco Network (Ip) implementation and cabling.
VTL implementation
Change Control and Documentation
11/2008 - 12/2008 Client (Orleans Parish School District)
2 month(s) Orleans Parish School District SVC Implementation
Project Description:Install and Implement SVC
Install and Implement DS4200 Storage
Install IBM/Brocade SAN32B-3 switches and zoning
Install and configure DCFM (Data Center fabric Manager)
Merge New switches to Old Brocade SAN switches
Create Zoning and Zoneset
Add present DS4700 Storage to SVC
Add old 8255 Blade center and new 8255 Blade center to SVC
Migrate data from Present Storage to Virtual Disks in SVC
10/2008 - 11/2008 Client (Wachovia)
2 month(s) TDMF IP Cluster Migrations
Project Description:Train Client in TDMF Cluster migrations. Implement and monitor TDMF migrations.
Assist in migrations
write play books for admin use
10/2008 - 10/2008 Client (ATT)
1 month(s) SVC Implementation
Project Description:SVC Implementation attachment to EMC DMX storage and Sun Solaris Hosts
Install 4 Nodes and instruct Client in SVC capabilities.
SVC planning and implementation
10/2008 - 10/2008 Client (Lockheed Martin)
1 month(s) SVC implementation
Project Description:SVC Implementation attachment to 4 VMware hosts. Attachment to DS4700 Storage
Zoning to Hosts, SVC, Storage on Brocade (IBM ) switches.
Train Client in SVC system
09/2008 - 10/2008 Client (Turner Broadcasting)
2 month(s) DS4000, Cisco, Linux RedHat Implementation
Project Description:Install DS4700 and DS4800 Storage. Implement, create hosts and allocate storage. Zone using Cisco Fabric Manager and Device Manager. Install IBM x-series servers (3) Install Linux RedHat Enterprize. Install Qlogic HBAs and drivers. Install RDAC and present storage to applications. Install cluster servers.
08/2008 - 08/2008 Client (BNY Mellon)
1 month(s) SDD - AIX upgrade
Project Description:Upgrade SDD on AIX cluster servers, 6 servers to version supported by DS8000
07/2008 - 08/2008 Client (Methodist Medical Center - Houston)
2 month(s) SOFTEK DATA MIGRATION
Project Description:Setup TDMF migration for Windows cluster server. Migrate data.
11/2007 - 11/2007 Client (Cincinnati Children's Hospital)
1 month(s) Data Migration Cincinnati Children's Hospital
Project Description:DS8000 Implementation and installation
TDMF zOS Installation and Implementation
11/2007 - 11/2008 Client (Disney)
13 month(s) Data Migration Services
Project Description:Planning and implementation for Data Migrations
Migration of Data for Microsoft Windows environment. Cluster migration.
Migration of AIX server storage from EMC to IBM DS8000
Robocopy migrations of Windows stand alone and cluster servers
TDMF IP migrations of Windows stand alone and cluster servers
DS8000 installation and configurations.
HBA configurations
TDMF Unix Solaris migrations.
Veritas configuration
EMC storage Configuration
11/2007 - 03/2008 Client (Kootenai Medical Center)
5 month(s) Migration TDMF
Project Description:Installation and implementation of DS4800 storage
TDMF IP Windows migration of FastT to DS4800
Brocade SAN configuration
04/2007 - 10/2007 Client (First Data Corporation)
7 month(s) Storage Consolidation and TPC reporting
Project Description:Implement and monitor TPC for Data
Train FDC Engineers in implementation of TPC for Data
Pull TPC reports and design Excel reports and charts
Create SAN designs and Visio SAN diagrams
Create Power Point Documents for Client presentation
Analysis of TPC reports for Data Rationalization
07/2006 - 03/2007 Client (Wal-mart)
9 month(s) Wal-mart Storage move project
Project Description:Project management of storage frame moves
DS4000 - Installation, implementation and troubleshooting issues
Brocade - switch zoning and maintenance
Disaster recovery
ATL - implementation and maintenance
TSM server - implementation and maintenance
SVC- installation, implementation
Nseries - installation, implementation
Change control