Cell: 412-***-****
Pittsburgh, PA ***** abowad@r.postjobfree.com
Facilities / Construction Engineer in the Natural Gas Industry
? Experience in wastewater treatment facility design, and engineering in high-volume manufacturing
? Executed design of treatment plant with anaerobic digesters and biogas compressors, which treated
client s wastewater and produced biogas used to fuel boilers
? Supervised teams of maintenance mechanics successfully on capital projects that resulted in $7,000
savings
? Efficiently lead team of designers, and engineers to complete process and equipment design of water
treatment facilities within budget
E XPERIENCE
Engineers Without Borders, Pittsburgh, PA
? Well versed in municipal project specifications and permitting
2010 Present
CO-PROJECT MANAGER AND PIPING TEAM LEADER
(VOLUNTEER)
? Traveled to Tingo Pucara, Ecuador with a team of engineers and students and assessed conditions
and geography in a poor rural community, which is in need of a water supply system
? Helped run meetings for project team that designed the water supply system for the community
? Mentored engineering students who created AutoCAD drawings and specified equipment
? Completed calculations, drawings, and bill of materials for a pipeline that will run up a mountain
? Completed preliminary designs for P&ID, and tank and pump arrangement
Siemens Water Technologies / US Filter / Oxford Solutions
2004 to 2010
Warrendale, PA
PROJECT ENGINEER
? Lead Engineer for engineering wastewater treatment systems (up to $13 million)
? Integrated packaged equipment systems and buyout equipment into one system
? Utilized client technical specifications and internal engineering standards to deliver process, facility and
equipment design to the client
? Equipment design experience: pumps, agitators, tanks, gas compressors, clarifiers, continuous
backwash gravity filters, anaerobic reactors/digesters, aerobic treatment, scrubbers, screw conveyors,
chemical feed, air compressors, valves, instrumentation, and piping.
? Developed a scope of work documentation package that described the repair of a municipal sewage
collection system to comply with DEP standards, Completed necessary permit applications, and
Developed detailed cost estimate
? Lead team of drafters, electrical engineers and project engineers to produce project deliverables.
? Managed and updated schedule so that team members were aware of deadlines and labor forecasts
? Communicated expectations and schedule to labor resources to ensure budget and deadlines were met
? Developed scope of work documents and purchase requisitions for equipment
? Collaborated with field service technicians to solve equipment start-up problems
? Established myself as the go to team member to utilize software that calculated pump sizing
Performance Friction Corporation, Clover, SC 2003 to 2004
PROCESS ENGINEER
? Lead mechanical engineer on a project team that designed and installed new powdered metal batching
process which reduced scrap by 10% plant-wide;
? Supervised team of pipe fitters, welders, electricians, and riggers to complete installation of liquid ring
vacuum pump, water chiller and heater, and process equipment on schedule
C RAIG L. J OHNSTON, EIT
2312 Sarah St
Cell: 412-***-****
Pittsburgh, PA 15203 abowad@r.postjobfree.com
Instituted equipment design changes that increased process capability (CpK) and improved
housekeeping.
? Reduced equipment downtime by 25% by modifying preventative maintenance schedules and following
up with mechanics after PMs were complete.
? Improved data accuracy by changing Statistical Process Control (SPC) sampling methods.
? Supervised plant maintenance staff in relocating two production lines while allowing plant to operate
without affecting production schedule
Guardian Industries Corp., Lewistown, PA 2001 to 2002PROCESS ENGINEER
? Implemented and organized the plant-wide transition to a new material handling method, which resulted
in $25,000 annual savings in materials
? Leader of continuous improvement initiative to design and install a hydraulic system for loading product
into processing equipment, which improved safety of material handling.
MAINTENANCE COORDINATOR
(MARCH 2002 AUGUST 2002)
? Planned and supervised complex repairs to capital equipment.
? Implemented facility wide repairs and retrofits in order to meet corporate environmental requirements .
? Coordinated maintenance staff responsible for completing PM schedules, repairing equip ment
breakdowns, making equipment upgrades, and general facilities maintenance.
PRODUCTION SUPERVISOR
(OCTOBER 2001 DECEMBER 2001)
? Supervised employees who were responsible for meeting daily goals for custom fabricated as well as
high volume product lines.
? Identified opportunities and implemented solutions to product quality and operator productivity issues.
Excel Technology, Pittsburgh, PA 2000TEST ENGINEER (Contract)
? Tested products during R&D; Completed set up, data acquisition, analysis, and reporting.
? Conceived mechanical design to achieve accurate and repeatable performance of laboratory ovens.
Invensys Appliance Controls, New Stanton, PA 1999 to 2000PRODUCT ENGINEER
? Designed modular testing equipment used to measure performance of electromechanical controls.
? Maintained equipment and directed technicians in completing performance testing in R&D of controls.
C OMPUTER S KILLS
SAP, JD Edwards, Microsoft
Office
E DUCATION
B.S.
MECHANICAL ENGINEERING UNIVERSITY OF ROCHESTER, Rochester, NY
V OLUNTEER E XPERIENCEBig Brothers Big Sisters o f Greater Pittsburgh2008Present
R EFERENCES AVAILABLE UPON REQUEST
C RAIG L. J OHNSTON, EIT
2312 Sarah S