painter/maintenance (phx-n-w)
**********@*****.***
Can do most anything.
Joe Anglin **********@*****.***
Experience:
BPI Properties
Maintenance tech/Pest Tech
10/2011 to 2/2012
Turn apartments Make ready,was responcible for setting up bed bug machine and using chemicals.Turned apt.did what needed done.
Arizona Post Masters Glendale, Arizona
Post Installer 06/2008 to 06/2010
Daily operations of routing orders
Drilled holes and bolted metal framework and supports in place with electric drill and wrenches and painted wooden post.
Cut, drilled and fit brackets, to support signs
Prime Time Construction Scottsdale, Arizona
Lead Maintenance Tech 02/2008 to 03/2009
Repaired and maintained physical structures of commercial and industrial establishments, such as office buildings, apartment houses.
Daily operations of scheduling work to be done on constructing homes
Used handtools and power tools.
Replaced defective electrical switches and other fixtures.
Painted structures and repaired woodwork with carpenter's tools.
Repaired plumbing fixtures.
Repaired plaster and laid brick and stucco repair.
Supervised 2 to 3 coworkers.
Keystone Lifestyle Homes Phoenix, Arizona
Superintendant of Construction 02/2001 to 12/2007
Supervised and coordinated activities of workers engaged in maintenance and construction of buildings, grounds and parking facilities.
Executed daily operations of construction of homes.
Inspected premises to determine extent of repairs.
Was instrumental in getting homes built on time.
Supervised workers in repairing and maintaining buildings and parking facilities, removing and replacing top soil, and watering and grading track surface.
Directed workers in planting and plowing vegetation on track oval to renovate track and in planting and trimming flowers, shrubs and grass to maintain landscape.
Supervised and managed contractors up to 35 to 40 contractors.
Inspected completed work for compliance to specifications.
Successfully managed contractors to build and pass inspections.
Made minor equipment repairs and engaged repair personnel for serious malfunctions.
Successfully handled over 250 homes.
Discussed company policies with workers and enforced safety regulations.
Structured and maintained 80 to 90 homes..
Analyzed and resolved work problems and assisted workers in solving work problems.
Trained new workers.
Evaluated workers' performance and provided feedback.
Hired and discharged workers.
Responsible for building and producing liviable homes..
Jims Painting Phoenix, Arizona
Painter 01/2000 to 02/2001
Applied coats of paint, varnish, stain, enamel, and lacquer to decorate and protect interior and exterior surfaces, trimmings and fixtures of buildings and other structures.
Read work orders and received painting instructions from supervisor or homeowner.
Smoothed surfaces with sandpaper, brushes, and steel wool.
Removed old paint from surfaces, using paint remover, scraper, wire brush, and blowtorch to prepare surfaces for painting.
Filled nail holes, cracks and joints with caulk, putty, plaster, and other filler, using caulking gun and putty knife.
Removed fixtures such as pictures and electric switchcovers from walls prior to painting.
Spread dropcloths over floors and room furnishings and covered baseboards, door frames and windows with masking tape and paper to protect surfaces during painting.
Painted surfaces with brushes, spray gun, and paint roller.
Saddleback Apartments Paridise Valley, Arizona
Maintenance/Grounds 03/1997 to 02/2000
Repaired and maintained physical structures of establishments, such as apartment houses .
Used handtools and power tools.
Replaced defective electrical switches and other fixtures.
Painted structures and repaired woodwork with carpenter's tools. Repaired plumbing fixtures.
Repaired plaster and laid brick.
Successfully handled 611 units
Make ready apartments and work orders.
Education:
American Trade Institute Glendale, Arizona
Heating, Ventilation, Air Conditioning & Refrigeration 08/2010
EPA Type 1,2
FORKLIFT CERTIFIED,US FORKLIFT