Richard Turner
Email: abourr@r.postjobfree.com
Address:
City: Plant City
State: FL
Zip: 33563
Country: USA
Phone: 813-***-****
Skill Level: Any
Salary Range:
Primary Skills/Experience:
Skilled Operation Manager with solid experience managing all levels of multiple projects including budgeting and administration.Experienced Project Manager professional with strong leadership and relationship-building skills.
Educational Background:
High School Dipolma from North East High, St Petersburg FL 1/2001 to 1/1976 (General)
Job History / Details:
Executive Summary
Skilled Operation Manager with solid experience managing all levels of multiple projects including budgeting and administration.Experienced Project Manager professional with strong leadership and relationship-building skills.
Core Qualifications
Background in [industries worked in]
power plants (conventional & nuclear powered)
citrus processing plants
dairies
phosphate mines
phosphoric acid plants
sulfuric acid plants
operated,maintained & repaired 600 & 1200 psi boilers and associated equipment aboard ships
fish oil processing plants
sales
manage projects
estimating
welding experience in tig, mig, stick
Adept in precision and measuring tools
Reading drawings, models and blueprints
Pipe fitting
Pipe welding
Valve repairs
Flexible
Available to work extended hours
Available to work in remote locations for long periods of time
Professional Experience
May 2007 to August 2012
Mid-State Industrial Corp Lakeland, Fl
Project Manager / Sales
Managed projects for power plants, phosphate, chemical, citrus
Worked directly with [departments, clients, management] to achieve successful projects with a perfect safety record.
Planned work and determined appropriate tools and equipment.
Attended pre bids for projects
Quoted projects
Sales
Followed company procedures to maintain a safe and productive work environment in a neat and orderly condition.
For Reference contact: Adam Hart 863-***-****
July 2006 to June 2007
QPS Lakeland, Fl
Division Manager
Managed projects and manpower, ordered material,tools and equipment for power plants and citrus plants, high pressure and low pressure steam systems and turbine related piping and equipment
Quoted projects
Sales
For Reference contact : Lamar Woods 850-***-****
January 2004 to June 2007
Moretrench Tampa, Fl
Superintendent
Supervised projects and employees, ordered material and equipment for the phosphate industry and power plants,pipe fitting & welding,structural steel installation and welding,equipment installation
Quoted jobs and performed some sales.
For Reference contact : Charles Cates
January 2002 to June 2004
CCC Group Bartow, Fl
Superintendent
Supervised projects and manpower for power plants and phosphate related plants,performed some estimating and job planning,pipe fitting & welding structural steel erection and welding,equipment installation
March 2000 to February 2002
Penninsular Engineering Plant City, Fl
Supervisor
Sub-contracted to Cargill Fertilizer, duties included contractor Q/C, estimate capital projects, safety audits on contractors, produce work orders for projects.
For Reference contact : Al Smith 863-***-****
March 1997 to January 2000
DCR Lakeland, Fl
Foreman
Supervised jobs in the citrus industry
pipe fitting and welding
equipment installation
For Reference contact : Chuck Langford
September 1994 to December 1996
Gulf Coast Construction Mulberry, Fl
Pipe Fitter / Pipe Welder
pipe fitting and welding and equipment installation in citrus plants
out of business
April 1991 to July 1994
Acme pump Plant City, Fl
Welder / Mechanic
Fabricate assorted pumps and pump skids, perform service calls
For Reference contact : Wayne Hall
July 1989 to September 1991
Bill Brown Welding Plant City, Fl
Foreman
Supervise crews for repairs on ocean going tug boats and ammonia barges
For Reference contact : Bill Brown
January 1985 to April 1991
Florida Power Corp Crystal River, Fl
Welder / Mechanic
performed welding on boiler tubes and associated piping and structural steel
and performed work on all equipment in the plants
January 1981 to September 1985
CSX Railroad Tampa, Fl
Trackman
performed work on all types of tracks
November 1976 to November 1980
United States Navy New Port, RI
Machinist Mate 3rd class
operated, repaired and maintained 600 psi steam system on a Fram II destroyer, trained on a 1200 psi stationary power plant
was discharged with an honorable discharge
attended :PROPULSION ENGINEERING "A" SCHOOL
ALPHA LAVAL PURIFIERS AND LUBE OIL SYSTEMS
BLUE PRINT READING
VALVE OVERHAUL AND MAINTENANCE
GED
Education
11 North East High St.Petersburg, Fl
GED General
Certificates: PROPULSION ENGINEERING "A" SCHOOL
ALPHA LAVAL PURFIERS AND SYSTEMS
PUMP OVERHAUL AND MAINTENANCE
BLUE PRINT READING
DALE CARNAGY
CONSTRUCTION MANAGEMENT AND ESTIMATING