> Discussion Board
> View Jobs
Member Area
> Post Your Resume
Employer Only
> View Resumes
> Post Your Job
Account
> Join Now
Posted/Modified on: 04/13/2010 21:17 PDT
Resume Title:
Cost Control, Scheduling, and Project Manager
Contact e-mail:
aborwq@r.postjobfree.com
Contact Phone:
Industry:
Utility(s) and Petro
Desired Location:
open
Willing to Relocate:
Yes
Desired Salary:
> $105,001/yr
Resume:
Pauli Bonner
P.O. Box 509
Marion, CT 06444
Fon: 203-***-****
Cell: 203-***-****
aborwq@r.postjobfree.com@gmail.com
Qualifications Summary:
Cost controls and cost engineering, lead planner/scheduler, senior estimator, project
controls, project manager and project management specialist
Project Experience Summary:
Power Generation ? Nuclear Power, HRSG (simple and combined cycle), Coal (fossil)
Power ? HRSG - Combined Cycles and Simple Cycles: Coal ? Outages; New Construction; and
Refitting Existing Boilers: Existing Coal Plants - New Backend Technology and Boiler
Conversions: Nuclear - New Construction and Existing Online Plants, and Decommissioning
and dismantling
Highways, Bridges, and Subway Tunnel ? Pennsylvania Transportation Department
Institutional, Commercial, and Residential ? Correction Facilities (maximum and minimum
security prisons), Schools (elementary and colleges) Hospitals; Fire Houses; Office
Complexes, Government Complexes; High-rises residential & complexes
Manufacturing (OEM) ? ALSTOM, EIMCO, H-W Refractory and Sikorsky
Industrial ? Mini mill(s) for various metals, cola ovens and bag-houses for steel
production, and industrial plant construction
Government ? Pennsylvania Department of Transportation; Connecticut?s Department(s)
Public Works, Housing, and State Police; Sacramento Municipality Utility District (SMUD);
UKAEA, Scotland; U S Military Power Plant, Fort Greely.
Professional Softwares:
Primavera: P3.0, P3.1, P3e/c5, P3e, P6, P3e4, P6.2, Suretrak; Artemis ? projectview;
Lotus notes; SAP; MS Projects; Timberline; Supplienet; JDEdwards; MS Access, Excel, Word,
Outlook, PowerPoint FrontPage, Photo Draw; QuickBooks Pro; Webpage Data Building; Graneda
Dynamic 4.1.
Significant Experience:
Architectural/Engineering/Construction: Over twenty-five years of experience working with
increasing responsibilities from detailing and design of architectural, civil/structural,
and mechanical projects to being a project manager on various projects. Cost control
construction and decommissioning. Designing and detailing, estimating, and scheduling
actual for drawings, e.g., P&ID, mechanical, civil/structural, specifications, and scope
of work; and conceptual construction projects for owners architects, engineers,
contractors, and subcontractors. Writing architectural and engineering construction
specifications, procedures, reports, and marketing proposals: Checking architectural and
engineering drawings and specifications for accuracy and State/Local building codes and
regulations: Negotiating contracts and writing legal papers for or against claims and
gathering the required data and documents for claims. Worked: Pennsylvania, Utah,
Kentucky, Connecticut, Michigan, North Carolina, Virginia, New Jersey, California,
Missouri/Illinois, Alaska, Wisconsin, Louisiana, Arizona, and Thurso, Scotland.Professional History:
6-2009 to Present: APS (Arizona Public Services): Scheduler: (Artemis Ver.7 Project
View): (Project postponed until 2012) Capital Projects scheduling for plan of the day
(POD) on the cooling tower project and assisted on the reactor cover replacement on Unit
#1, #2 and #3 - Unit #2 for fall outage and schedule development and maintenance. Analysis
both WEC & APS outage schedules for change and conflict. Creating Management matrix charts
for upper managers. Palo Verde, Phoenix, Arizona
.
4-2009 to 5-2009: Entergy: Scheduler/Cost Control: (six week assignment) (Microsoft
Projects ? 2003) Maintaining schedule and creating detailed cost analysis report for the
Security Enhancement Project, and creating detailed cost analysis reports for various
projects. Creating drawings to clarify the perimeter of the fences, walls and the
architecture of room layouts for the Security Enhancement Project and Credit Union,
respectively. Waterford 3 Nuclear Plant, New Orleans, Louisiana.
10-2008 to 2-2009: FP&L: Senior Scheduler: (P3e4 & P36) (project postponed) Creating the
architecture of the master schedules for various projects, using the construction and
scheduling methodology principals and WBS coding for the various capital projects and
outage schedule for the 2009 season. Creating projects? charts and other matrix for
management. Lead team meetings for various projects. Point Beach Nuclear Power Plant, Two
Rivers, Wisconsin.
09-2008 to 10-2008: U.S. Military Power Plant: Master Scheduler Consultant (Microsoft
Projects ? 2007) (six week assignment) Creating the architecture of the master schedule
and built the construction methodology and logic into the schedule according to the
customer?s specifications for the power plant at Fort Greely, Alaska.
01-2008 to 08-2008: Ameren Headquarters: Cost Engineer/Schedule Consultant: (P3e/c5 & P6,
Power Plant CBS): (new VP ? all contractors removed) Implementing the management
procedures, and re-organizing the cost control and scheduling process for better controls
on the company's budget/accruals for over three hundred various projects totaling over 5.5
billion dollars on the eight fossil fuel sites. Maintaining cost schedules of monthly
accruals and forecast. Develop and maintain the various sites' month-end project summary
reports, including maintaining monthly accruals/forecast cost up-dating and reviewing
engineers' grammar and sentence structure on over four separate projects documents the are
later merged into nine various sites' master report for upper management. Test in Access
proved that it wasn't able to handle the merger of separate documents into a master: from
that test - created a web base design which worked very well in expediting the process in
creating the master documents. Reviewed the contractor's EPCM contract and made
suggestions for the President. St. Louis, Missouri/Collinsville, Illinois
07-2007 to 11-07: UKAEA Dounreay Nuclear Plant: (four month assignment) Consultant Design
Estimator: Re-designing (engineering approved methodology of new proposal for design, and
engineering loads for construction estimate); and estimating the construction of the
Prototype Fast Reactor (PFR) decommissioning building prior to dismantling of reactor from
conceptual drawings, specifications, and scope of work due at the end of October. The
construction will be in 2012. Dounreay, Thurso, Scotland, UK
10-2006 to 05-2007: PSEG Power: Consultant Lead Planner/Scheduler/Cost Controller: (P3.1,
SAP, PowerPoint, Excel) Planning and creating a architecture of a conceptual level three
detailed EPC schedule having over 5000 activities for 5 years of outage work and various
subprojects to bring coal boiler into New Jersey?s EPA rules by 2011. Overseeing SS&W.
Writing management reports, month-end projection/actual reports; commodity curves; and
various graphs for senior management review. Hudson, Jersey City, NJ; and Mercer, Trenton,
NJ.
06-2006 to 10-2006: Alstom Powers Corp.: Consultant Planner/Scheduler (P3 and
Tumberline): Statusing and maintaining, and resource loading coal boiler schedule (fossil
fuel). Using Tumberline software to compare schedule and estimate for resources. Walked
down the mechanical systems for the percentage completion for the schedule. Creating excel
formatted and PowerPoint graphs to reflect early-late-earned progress; scheduled various,
and scheduled project indictor for pre-outage and outage for the JHCampbell Plane Unit 3
Conversion to burn western coal, Holland, Michigan.
02-2006 to 06-2006: SMUD (Sacramento Municipal Utility District): Consultant Cost Analyst
Controller/Scheduler (P3 and SAP): Writing Summary/detailed excel reports on the
comparisons of P3 verse SAP. Repair and streamline the scheduling architecture for better-
expedited efficiency for true critical path and true float. Cost analyzing of projected
activity(s) change in the schedule and estimating cost impact. Maintaining and creating
various schedules, reports, and documents (Including Surveillance Procedure Reports and
Routine Reports) for various meetings. Decommissioning/Dismantling Rancho Seco Nuclear
Power Plant, Sacramento, California.
08-2005 to 02-2006: Alstom Powers Corp.: New Equipment (EUB) Project Lead
Planner/Scheduler (P3, P3e/c5, SAP, Suppliernet, and JDEdwards): Planning, creating,
rebuilding, statusing and maintaining new coal boiler schedules (fossil fuel). Using
various softwares in gathering data to up-date the schedule, e.g., JDEwards
(requisitions/purchase orders), Suppliernet (expediting/logistics), and excel format from
the various engineering, purchasing, and logistics departments for the EKPC?s Spurlock#4
project of Mayville, KY. Reconstructing P3.1 model schedule (template) for conversion into
P3e/c5 for the EKPC?s Smith#1 project. Maintaining PowerPoint presentation with project
data for management review of project standing. Successfully negotiated contract schedules
and gathered documents for claims. Windsor, Connecticut.
02-2005 to 06-2005: Sikorsky Aircraft Corporation: Consultant Planner/Scheduler
(Microsoft Project, SAP, P3.5 e/c) Aerospace scheduling for various aircraft projects
schedules. Converting Microsoft Project Schedules into P3e/c: Analyzing, rebuilding, and
creating new schedules in Microsoft Project Creating Power Point Presentation, and various
word/matrix reports for the variety of projects. Build functional data basic (user
friendly) for the sub-project leaders, and taught the functions of various software.
Scheduling and maintaining these various projects in Primavera, and Microsoft. Stratford,
Connecticut.
02-2004 to 02-2005: Strategical Concepts: Consultant Civil/Mechanical Estimator,
Scheduler, was working on various construction projects within Connecticut using P3e and
P3e/c5. Waterbury, Connecticut.
10-2003 to 01-2004: Dominion Power: Consultant Planner/Scheduler (Suretrak, and SAP) for
a coal-burning unit, and a HRSG unit outage. Creating a resource loaded schedule for two
different units. Develop schedule from SAP and a management?s business plan. Coal Burning
Unit with GE steam turbine/generator and a HRSG Unit with GE Generator and Turbine,
Chesterfield, Virginia.
09-2003 to 10-2003: Northeast Generation Service, Inc: Consultant Planner/Proposal
Scheduler (Suretrak, and P3e): Creating and Engineering a conceptual schedule from HRSG
experience and a design drawing for a successful awarded bid proposal. This HRSG is being
built in two stages first a simple cycle, converting into a combined cycle. Engineering
concept the back end of the HRSG where the simple cycle system can function without
interference from the second stage?s construction. 100-Megawatt combined cycle with a GE L
series generator, Long Island, New York.
02-2003 to 07-2003: Northeast Generation Service: Consultant Cost Controller/
Planner/Scheduler (P3, P3e, and Suretrak): Reading the Civil, P&ID(s), mechanical and
related design drawings to create a working EPC schedule with cost resources with over
fifteen hundred activities. Schedule saved as template for future projects. Pratt &
Whitney Swiftpac 54-Megawatt Peak Power Generator, Greenport, New York.
09-2002 to 02-2003: SMUD (Sacramento Municipal Utility District): Consultant cost analyst
controller, and scheduler (P3 and SAP): Running test schedules for evaluation of
scheduling architecture for better expedited efficiency with activity driven scheduling
compared to the resource driven process. The schedule size is three thousand plus
activities with over twenty-five thousand activities? cost resources. Cost analyzing of
projected activity(s) change in the schedule and estimating cost impact. Maintaining and
creating various schedules, reports, and documents (Including Surveillance Procedure
Reports and Routine Reports) for various meetings. Decommissioning Rancho Seco Nuclear
Power Plant, Sacramento, California.
07-2001 to 07-2002: Progress Energy (CP&L): Consultant Lead Planner/Scheduler (P3.1):
Auditing, and analyzing GEMCO schedule plan. Creating illustrations, graphs. Generating,
and managing CP&L schedules for small projects on site. Performing mechanical System(s)
walk-down(s) and researching the P&ID(s) to write tags for system valves and equipment.
Revising commissioning closeout procedures. Systems review for turnover to operations.
Technical review the civil/structural documents and drawings packages for closeout from
construction to operations, and producing special systems packages for operations.
Compiling reports from legal documents compared to contractual agreements (claims);
civil/mechanical cost estimates; writing proposals, Combined Cycle HRSG(s) and Single
Cycle with G.E.?s 7FA generators, Toshiba Steam Turbines, and Nooter/Eriksen Heat Recovery
Steam Generators, Rockingham, North Carolina.
09-2000 to 04-2001: Alstom Powers Corp.: Consultant Planner/Scheduler (P3.1, JDEdwards)
for the OEM combined cycle HRSG(s) manufacturing of their systems. Reconstructing and
maintaining status of schedules. Merging China?s lunar work calendar schedule with
America?s work calendar for a true delivery time frame of equipment to customer. Florida:
Polk County ? A412, Tampa Electric Co.: Arizona: Kyrene, Salt River Project: Texas: Corpus
Christy Energy, Skygen Energy, LLC. Windsor, Connecticut
.
01-1998 to 09-2000: Strategical Concepts: Consultant civil/mechanical Estimator,
Scheduler, Project?s Financial Controller and Construction Marketing for various
construction companies, Waterbury, Connecticut
.
09-1989 to 12 1997: State of Connecticut Government: Consultant
? Public Works: Project Manager: overseeing the construction of new correctional
institutions, and hospital renovations: Hartford, Connecticut.
? Department of Housing: Checking architectural work, specification and building code for
grant funding of projects for elderly, section eight, and low-income tenants: Hartford,
Connecticut.
? Department of State Police: Designing architectural/engineering drawings and
specifications for the various small projects for the State Police. Meriden, Connecticut.
01-1987 to 08-1989: Pine Hill Construction: Senior Estimator and Lead Planner/Scheduler:
Institutional, e.g., schools, churches, fire houses, local government administration
buildings; Residential, e.g., government funded housing and HUD, and high-end income
homes. Plymouth, Connecticut
12-1986 to 12-1987: Brennan Construction: Project Manager and Estimator: Turnkey
construction of manufacturing, industrial, commercial, and institutional construction.
Shelton, Connecticut
03-1986 to 11-1986: Waterbury Foundations: Project Manager and Estimator: Turnkey heavy
projects that require concrete construction, e.g., schools, hospitals, commercial,
residential, institutions, churches, and industrial. Waterbury, Connecticut.
06-1985 to 2-1986: Duquesne Light and Power: New Nuclear Power Plant Construction:
Supervisor: Grouting equipment and writing reports from walking systems, drawings, and
specification. Shippingsport, Pennsylvania.
06-1984 to 05?1985: Green Power Plant: Field Engineer: Construction of coal dumper
hoppers, coal screw slurries, waste water system and cooling towers for power plant.
Owensboro, Kentucky.
06-1981 to 05-1984: Pennsylvania Department of TransportationEstimator
? Various Roads, and Highways throughout the State and Mt. Lebanon Subway
Tunnel
? Scheduler ? Various Roads, Highways, and Bridges
?
Project Manager ? Allegheny Avenue Bridge (raising the bridge higher over active train
tracks). Pittsburgh, Pennsylvania
09-1980 to 09-1981: Pennsylvania Engineering: Detailing and Design Industrial Plants, and
estimating mini-mills, cola ovens and bag houses for steel and metal producing plants.
Pittsburgh, Pennsylvania
03-1978 to 08-1980: EIMCO: Detail/Designer waster water system and tanks systems for
municipalities, coal slurries, chemical industry and refineries. Salt Lake City, Utah
05-1975 to 02-1978: H-W Refractory: Detail/Designer of different application of
refractory in various systems, e.g., power plants, metal production plants, furnaces.
Pittsburgh, Pennsylvania
04-1971 to 04-1975: Ingalls Iron Works: Detailer of Structural Steel. Pittsburgh,
Pennsylvania
Education:
MSM & MBA - two classes Albertus Magnus College
B.S. Marketing/Paralegal Chart Oak State College
A.D. Paralegal Matatuck Community College
A.D. General Studies Naugatuck Valley Community-Technical College (NVC-TC)
A.D. Structural Detailing Dean Institute of Technology
Civil Engineering University of Pittsburgh
English/Writing Central Connecticut State University
Professional Training:
Mediation (Pane of Judges) - Certificate American Arbitration Association
Accounting ? Diploma Southington Continuous Education
Web Page Design - Certificate NVC-TC
Marketing Layout & Design ? Certificate Skillpath
Architectural & Mechanical Engineering Continuous Education
Creative Writing, Grant Proposals, Screen, Magazine, Technical Writing and Editing(s) ?
Certificates NVC-TC
Professional Teaching:
IMTI: 09-1999 to 09-2000 Blue print reading and business math (estimating and accounting)
to students in the trades of HVAC, plumbing, and electrical for licensing by the State of
Connecticut
.
Professional Associations:
SMPS The Society for Marketing Professional Services
ASPE American Society of Professional Estimators
AAA American Arbitration Association
Professional Recognition:
Various letters and an award for professional services
Please send comments, suggestions and problems to: aborwq@r.postjobfree.com
Copyright ? 2003-2005 Cooper Pugeda Management, Inc. All rigths reserved.