Ali Aghazadeh, B.Eng., EIT
* ******* ** ****: 905-***-****
Richmond Hill, ON L4S 2R3 ************@*****.*** Cell: 416-***-****
CORE COMPETENCIES
• Over 10 years' extensive experience in EPC oil & gas and industrial projects in the electrical field
• Skilled in basic and detailed designs, feasibility studies, vendor document evaluations, procurement services,
construction work, inspection of electrical equipment and materials
• Thorough knowledge of international standards such as IEC, IEEE, API, BS, IPS, ANSI
• Modeling of electrical network and system studies (load flow, motor starting, short circuit), involving in
3D and/or 2D design and model review
• Applying design knowledge in hazardous area classification, load list, power distribution, grounding,
lighting, technical specification, data sheet, equipment sizing, UPS&DC charger, SLD, I/O list, logic diagram,
schematic wiring diagram, PMS&PDCS, panel arrangement layout, preparing TBE, MTO, man-hour
document, installation details
• Engineering coordination with other disciplines and able to extract necessary information from P&ID's and
mechanical equipment list and responsible to M.O.Ms
• Integrating between the engineering developed by the suppliers and the engineering developed by the
company’s technical departments, ensuring the necessary information are exchanged between them
• Performing test and inspection (FAT), prepared engineering document for pre-commissioning,
commissioning and start-up, site support activities as per project requirement
• Problem solver and decision maker, self-motivated, organized, responsible manner and reliable
• Proficient in Auto CAD, ETAP, Dialux, Calculux, MS Office, as well as familiar with PDMS
WORK EXPERIENCE
Electrical Works as Apprenticeship (Part Time) 2012 - 2013
Shahin Industrial Co. Toronto
Cabling and wiring, installation lighting fixtures, switches and socket outlets in commercial project
Senior Electrical Engineer, Team Leader 2008 - 2012
I.G.C. Co (Iran International General Contractor) Tehran, Iran
Project: LAVAN Island oil refinery upgrading and revamping EPC project in Persian Gulf, Iran
• Utilized ETAP software to prepare load flow, short circuit and motor starting study of electrical network to
optimize generators, transformers and cables sizing by considering the permissible voltage drop and current
• Prepared technical specifications, data sheets, calculations and equipment sizing to procurement services
• Designed MV/LV switch board with maximum reliability and interchangeability by considering appropriate
logic, PLC and protection devices to save cost in project
• Developed hazardous area classification to select exact explosion proof equipment and save cost in project
• Designed earthing, lighting layouts, cable route and cable trench/tray/ladder layouts with minimum conflict to
piping layouts and other equipment
• Prepared electrical load list, cable schedule and cable cutting list to achieve minimum waste in cabling
• Prepared relay setting study and coordination curve documents
• Prepared materials requisition, technical bid evaluation documents (TBE), man-hour and cost estimates
• Reviewed instrument load list to calculate and achieve the optimum size for UPS
Page 1
PDF created with pdfFactory Pro trial version www.pdffactory.com
Ali Aghazadeh, B.Eng., EIT
6 Delisle St Home: 905-***-****
Richmond Hill, ON L4S 2R3 ************@*****.*** Cell: 416-***-****
• Developed interfaces between MV/LV switchboards and RTU control system by preparing interconnection
diagram for IRP (instrument panel)
• Reviewed vendor documents and carried out inspection test of 6KV,7MW steam turbine generator, 6/0.4KV
transformers, UPS & DC charger, HVAC, electrical motors, LV MCC & MV switchgear, VFD panel,
explosion proof materials, LV&MV& control cables, PDCS & PMS
• Prepared documents for extra work based on new requests from client including changes to: budget staffing,
equipment, schedule, and negotiated new terms with client as claim
Senior Electrical Engineer 2006 - 2008
P.E.E.D. Consulting Engineers Co. Tehran, Iran
Project: crude oil pump station EPC project in Ahwaz, Iran
• Design Reviewed for detail documents such as: technical specification, data sheet, calculations, electrical load
list, equipment sizing, SLD and logic diagram, cable route & trench layout, lighting, grounding, HVAC
system and cathodic protection, ETAP report for load flow, motor starting & short circuit study
• Reviewed vendor offers in compliance with project specification, data sheet and drawings and made technical
recommendation to ensure project specifications were met sound and selected effective bid (TBE)
• Participated in technical meeting and procurement services, coordinated and held MOM with other department
and vendors
• Oversaw the testing and inspection of electrical equipment and creative test reports to client
• Contributed in data gathering and technical information about existing turbo pumps units with contractor to
utilize in ETAP model for achieving best situation in motor starting
Electrical Engineer 1999 - 2005
BALAGAR Construction Co, Tehran, Iran
Supervised installation, modification and testing of 6/0.4KV Transformers, LV MCC, LV motors, lighting panels
and lighting fixtures, LV distribution panel boards, explosion proof materials, cable tray & ladders, grounding,
conduits, switch boxes, electrical wiring & cabling, receptacles, paging & fire alarm system and other electrical
components for projects listed below:
• South Pars Gas Field Development Phase One in Persian Gulf, Iran
• Waste Water Treatment project, Varamin, Iran
• Navab Complex Buildings municipal project, Tehran, Iran
EDUCATION & TRAINING
Bachelor of Science in Electrical Power Engineering- Major Power, University of Tabriz, Iran
Successfully completed 180 hours of OSLT in workplace communication skills for technology at Seneca College
Familiar with Canadian electrical code
PROFESSIONAL AFFILIATIONS
Recorded in PEO's official register as a member of (EIT) program and eligible to write (PPE) in Ontario, CANADA
Iranian occupational license for professional engineering (Grade One)
Page 2
PDF created with pdfFactory Pro trial version www.pdffactory.com