ALAN ARAZA RIVERA
No.*** Palmera Homes IV
Dolores, Taytay Rizal, Philippines
Tel. No.+966*********&+639*********
************@*****.***
PERSONAL PARTICULARS:
Date of Birth: February 12, 1965
Passport No: EB0222643
(Expiration Date- May 14, 2015)
Religion: Roman Catholic
Marital Status: Married
Citizenship: Filipino
II. SUMMARY OF EXPERIENCE:
13 years of total experience;Fabrication &Erection of Steel Structures,
Stadium High Rise Building, Commercial
Building,Warehouses, Cement Plants,Oil/Gas Refinery & Petrochemicals.
III. JOB DESCRIPTION:
Company : SABIC/Saudi Basic & Industrial Corp./Yanbu,Ksa
Position Held: Structural Quality Control Inspector- (August 06,2012-Up to
present)
Project: E&PM/Engineering & Project Management/Polyethylene Terephtalate
PET II Project
Duties & Responsibilities
(Client)
. Review project specifications, standards, international standards,
procedures ITP's/
inspection test plan and approved drawings.
. Responsible/Verify,Check&Monitor inspection item @ site as per ITP's and
Procedures.
. Prepares non-conformance report(NCR), field trouble report(FTR) and
quality deficiency report(QDR) as necessary.
. Report to QA/QC manager for any discrepancies happened during
construction.
. Ensure that all certificates has been sign off by both parties;client and
sub-contractor.
. Coordinates with contractor sub-contractors engineers and inspectors.
. Attend QC and Kick Off meeting once new works to be done.
. Prepares final punchlist defect items and submitted to contractor and sub-
contractors for repair and close out prior for final acceptance.
. Attend safety orientation to prevent from any unsafe condition @ site.
Company : Joint Venture of Rotary Eng'g of Singapore & Petrol Steel Company
Ltd/Jubail Ksa
Position Held: Structural Quality Control Inspector- (Feb. 01, 2011-Feb.
08, 2012)
Project: Satorp/Saudi Aramco Total Refineries & Petrochemicals Ltd.
Refinery Tank Farm Package 6
Duties & Responsibilities
(Main Contractor)
. Participate in the quality audit and assessment of the structural works
as directed by the Head Quality Control
Manager.
. Review of the Contractor/ Sub-Contractor Inspection and Test Plan(ITP)
for con-formance to the specification code and standards and
identification intervention requirements.
. Verify Quality Control Documents in the form of inspection testplan (ITP)
method of Statement (MS) and works instruction and inspection records,
Test certificates are available prior to work commencing.
. Ensure works sequence is planned and controlled via implementation and
adherence to company approved method of statement and work activities.
. Undertake witness, surveillance, actual inspection activities of
structural construction and testing works at site as required by the
inspection and test plan and to verify product conformity and full
compliance with engineering drawings
specifications, code and standards and project contract document.
. Coordinates with the sub-contractor of the interface problems arises
related to other scope to s like mechanical & electrical works.
. Knowledge in ISO 9000:2001
. Ensuring that the production department sub-contractors and supplier are
complying the project quality plans, project specifications and the works
are being started, executed and completed and hand-over as per contract.
. Inspection of different works activities such as pre-fabrication &
erection of heavy steel superstructures and also civil activities like
foundations grouting & fireproofing works.
. Preparing QC procedures, establishing inspection plan, performing
verifications inspections and documentations.
. Prepares non-conformance report(NCR), field trouble report(FTR) and
quality deficiency report(QDR) as necessary.
. Coordinates with contractor sub-contractors engineers and inspectors.
. Attend QC and Kick Off meeting once new works to be done.
. Prepares punchlist defect items and submitted to contractor and sub-
contractors for repair and close out prior for final acceptance.
Company : : GS Engineering & Construction E&C
Position Held: Structural Quality Control Inspector- (July 10, 2009 - Sept.
30, 2010)
Project: Green Diesel Project/Al-Ruwais Refinery, Abu-dhabi(UAE)
Duties & Responsibilities
(Main Contractor)
. Review project specifications, standards, international standards,
procedures ITP's/
inspection test plan and approved drawings.
. Responsible/Verify,Check&Monitor inspection item @ site as per ITP's and
Procedures
Company : Chiyoda Technip Joint Venture(CTJV)
Position Held: Structural Quality Control Inspector- (Mar. 02,2008- Mar.
02, 2009)
Project: (RGX)Ras Gas Expansion Project Train 6,7&(AKG2)Alkaleej Gas Plant
Duties & Responsibilities
(Main Contractor)
. Review project specifications, standards, international standards,
procedures ITP's/
inspection test plan and approved drawings.
. Responsible/Verify,Check&Monitor inspection item @ site as per ITP's and
Procedures
Company : Gama Al-Moushegah Arabia Ltd.
Position Held: Structural Quality Control Inspector- (May 14, 2006- Oct.
05, 2007)
Project: National Petrochemical Industrial Co./Al-Sinaiyah Yanbu, Ksa
Duties & Responsibilities
(Sub-Contractor)
. Review project specifications, standards, international standards,
procedures ITP's/ inspection test plan and approved drawings.
. Check latest revision of AFC drawings that been at site/field and shops.
. Conduct site inspection in accordance with the approved ITP, fill-up
required form and issued checking advise.
. Conduct surveillance inspection regularly in order to prevent violations
to project specs.and standard.
. Check calibration of test equipment/instrument that been used at site.
. Check drawing for any possible changes at site & coordinate with
technical department for as-built preparation.
. Report to QA/QC manager for any discrepancies happened during
construction.
. Ensure that all certificates has been sign off by both parties;client and
sub-contractor.
. Ensure that all certificates has been filed accordingly and traceable.
. Ensure that all materials used for the project are approved by the
client..
. Prepare dossier/matrix-summary of inspection certificates, to closed
punchlist & document acceptance certificates be submitted to client
prior to turn-over of project.
. Safety orientation has been conducted by safety department.
. Ensure that PPE has been issued completely prior to go at site and
fabrication area.
Company : Qatar Space Technology WLL.
Position Held: Fabrication Supervisor - (June 10, 2004 - June 30, 2005)
Project: Al-khalifa Stadium/ Doha,Qatar
Duties & Responsibilities
. Supervising in the execution of works from fabrication to erection.
. Prepares daily, weekly and monthly accomplishment report.
. Assigned detail task and work priorities to the various lines of
supervision in the field.
. Gives guidance and helps shop fabrication/site erection on difficult or
usual problems and selection of techniques and procedures to be applied.
. Prepares inquiries, requisition & anticipating material request prior to
work activities.
. Draws-up sequence/work schedule of fabrication, assembly, installation
and other operations by guidance of immediate superior.
. Perform calculations and estimates equipment list, progress reports and
drawing.
. Check, review works and construction as per plans, drawings and
specifications etc.
. Perform calculations and estimates equipment list, progress reports and
drawing.
Company : Mohammad Al-Mojil Group,Jubail, Ksa
Position Held: : Foreman- Supervisor/ Structural - (May 02, 2002 - June 21,
2003)
Project: United Olefins Project/Ethylene Glycol/Oxide Plant/Jueg
Duties & Responsibilities
. Supervise and responsible for structural steel
delivery,fabrication,assembly & erection works @ site.
. Prepares daily progress/accomplishment report.
. Prepares inquiries, requisition & anticipating material request prior to
work activities.
. Checks and maintain cleanliness in the assigned work area to prevent from
unsafe condition.
Company : Megawide Builders and Dev't. Corporation
Position Held: : Site Steel Engineer - (August 01, 2001 - January 31, 2002)
Project: 1,575 TONS Office and Factory Bldg./Sunshine- Plasticell,Sterling
Technopark,Cavite
Duties & Responsibilities
. Supervise and monitor project according to its schedule.
. Supervising in the execution of works from fabrication, erection & up to
finishing works.
. Prepares daily, weekly and monthly accomplishment report.
. Monitors progress of works in the field and giving emphasis in meetings
the targeted accomplishment for the day, week or month.
. Responsible in initiating improvement on works methodologies.
. Monitors work productivity so that the job is done within the specified
budget.
. Assigned detail task and work priorities to the various lines of
supervision in the field
. Gives guidance and helps shop fabrication/site erection on difficult or
usual problems and selection of techniques and procedures to be applied.
. Prepares inquiries, requisition & anticipating material request prior to
work activities.
. Draws-up sequence/work schedule of fabrication, assembly, installation
and other operations by guidance of immediate superior.
. Perform calculations and estimates equipment list, progress reports
and drawing.
. Check, review works and construction as per plans, drawings and
specifications etc.
Company : Factor A" Incorporated
Position Held: Structural Quality Control Inspector - (June 01, 1998 - Oct.
31, 1998)
Project: 72 Meggawatts Diesel Power Plant/La Paz, Iloilo,City
Duties & Responsibilities
(Client)
. Review project specifications, standards, international standards,
procedures ITP's/
inspection test plan and approved drawings.
. Responsible/Verify,Check&Monitor inspection item @ site as per ITP's and
Procedures.
. Prepares non-conformance report(NCR), field trouble report(FTR) and
quality deficiency report(QDR) as necessary.
. Report to QA/QC manager for any discrepancies happened during
construction.
. Ensure that all certificates has been sign off by both parties;client and
sub-contractor.
. Coordinates with contractor sub-contractors engineers and inspectors.
. Attend QC and Kick Off meeting once new works to be done.
. Prepares final punchlist defect items and submitted to contractor and sub-
contractors for repair and close out prior for final acceptance.
. Attend safety orientation to prevent from any unsafe condition @ site.
Company : BF Metal Corporation/Cainta,Rizal
Position Held: Estimator II- (September 16, 1996 - March 13, 1998)
Project: 1. 10,000 Metric Tons-Apo Cement Plant/Tinaan,Naga,Cebu
2. 3,200 Metric Tons-Intel CV-2/Office & Factory Building
/Bo. Javalera,Gen, Trias,Cavite
3. 2,700 Metric Tons-54 Storey PB Com Tower/Ayala
Avenue,Makati City
Duties & Responsibilities
. Analyzes blueprints,specifications,proposals, and other construction
documents to prepare time,cost,materials, and labor estimates for bidding
construction projects, applying knowledge of specialized
methodologies,techniques,principles and processes.
. Computes cost estimates for materials,purchased and/or leased equipment
subcon- tracted work,production activities and requirements, and labor.
. Prepares preliminary estimates for planning purposes and detailed
itemized estimates base on final plans and specifications.
. Reviews data to determine material and labor requirements and prepares
itemized lists.
. Researches and evaluates subcontractors based on
price,quality,selection,service support,etc. solicits bid proposals.
. Communicate with management to evaluate contract performance.
Company : Steel Centre Phils. Inc.
Position Held: : Fabrication Foreman - (February 14, 1996-July 15, 1996)
Project: 3,500 Metric Tons,Columbia Center Building/NAIA Road,Para-
Naque,City
Duties & Responsibilities
. Supervise and responsible for structural steel works @ fabrication plant.
. Prepares daily progress/accomplishment report.
. Prepares inquiries, requisition & anticipating material request prior to
work activities.
. Checks and maintain cleanliness in the assigned work area to prevent from
unsafe condition.
Company : Patining Construction & Dev't Corporation
Position Held: : Batching Plant Incharge - (March 08, 1995 - December 31,
1995)
Project: 3,000 Cubic Meter Foundation of Finishing Mills - Fortune Cement
Plan/Bo.Mapulo,Taysan,Batangas.
Duties & Responsibilities
. Supervise and responsible for concrete deliveries, site visit and
concrete estimates.
. Maintaining equipment for concrete deliveries.
. Check concrete batch mixture & prepare schedule and record tract time
prior for delivery.
. Maintain cleanliness in the assigned work area to prevent from unsafe
condition.
Company : BF Metal Corporation/Cainta,Rizal
Position Held: Production/Junior Engineer - (August 23, 1993 - March 08,
1995)
Project: 1. 300 Megawatt Combined Cycle Boiler Gas Duct/Limay,Bataan
2. 10,500 Metric Tons-SM Southmall Ayala,Alabang
3. 2,000 Metric Tons-KTI Flue Gas Duct/Limay,Bataan
Duties & Responsibilities
. Analyzes production specification and processes and performs mathematical
calculations to determine production rate, cost, and output.
. Performs general routine tasks or handles a specific unit specialty on a
project, such as taking measurement, perform calculations and preparing
inquiries and requisitions specification, estimates equipment lists,
progress reports and drawing according to specifics detailed
instructions.
. Performs engineering works on a small job or limited portion of large job
requiring independent application of standard methods and procedures to
be applied.
. Draws-up sequence/ work schedule of fabrication, assembly, installation
and other operations by guidance of supervisor and foreman.
. Gives guidance and helps shop fabrication on difficult or usual problems
and selection of techniques and procedures to be applied.
. Deals with conventional and engineering practices but include a variety
of complex phases, such as conflicting design requirement, use of non-
standard or substitute materials requiring broad knowledge of principles
and methods of related areas.
. Checks and maintain cleanliness in the assigned work area to prevent from
unsafe condition.
. Performs other related tasks that maybe assigned by the immediate
superior from time to time.
IV. EDUCATION:
. Bachelor of Science of Civil Engineering - Divine Word College of
Legaspi,City Graduated from (May 1981 to 1986)
V. SKILLS:
. Knowlegeable of Construction Estimates both Civil & Structural Steel
works
. Computer Literate (Software application such as Microsoft Excel,Word &
Visual Basic
VI. SEMINARS & TRAINING ATTENDED:
. 20 to 31 Oct. 1997 Steel Fabrication Works Course
Cons't Manpower Development
Center(CMDC)
Dasmarinas,Cavite,Phils.
. 14 to Nov.06, 1994 General Welding Technology
BF Metal Corporation
Philippines
IV. CHARACTER REFERENCES:
1. Mohammad Azman QC Manager Joint Venture/Rotary &
Petrol Steel Co.
2. Sergio Sarti QA/QC Manager Chiyoda
Technip Joint Venture
3. Leonardo Hernandez Chief Struct'l QA/QC Tecnimont Arabia
Ltd.
4.. Emir Toptas QA/QC Manager Gama Al-
Moushegah Ltd.
I hereby declare that above furnished details are true to the best of my
knowledge.
ALAN ARAZA RIVERA