Consultant Profile: Sharique Ahmad Khan
Location: Kolkata, India +91-990*******
Experience: 8.2 yrs.
Title: Technical manager, Radio network consultant.
Area of Expertise.
> Proficient in Network Performance, Project Management, NPI
Monitoring - GSM/ WCDMA / HSPA+ and Radio Optimization.
> Pre-Sales Ericsson Team for PRICING and PRODUCT STRATEGY.
> Auditing RFP and BOQ's Internal / External vendors.
> RNC ( P 6.0, W10, W11 A & W12 B/ SWITCH and e-NODE Radio Network
Tuning,
> Experience of 4- Green Field Networks Launch Projects. (Integration
and PM)
> Experience of 3- 3G swap projects.( Initital Tuning and Optimization)
> Experience of 4- Abroad 3G - NPI Project, Tuning- Optimisation
Projects) Bhutan and Indonesia and Thailand (Advance Optimization,
KPI Targets, Initial Tuning)
> Knowledge of telecom test equipments including TEMS Investigation all
versions, CAIT 3.4, ESPA, ITK 2.0.1 -1 Release ( ISP Tool Kit),
GLADIATOR, Actix, ASSET- Aircom Enterprise Edition, Schema
(Frequency/Neighbour Planning), TCPU (TEMS CELL PLANNER), ATOLL, U-NET
( Planning Tool Huawei), LMT-2000 ( BSC Parameter Tool- Huawei), PROBE
(Drive Test Tool) Eye-Spot (real time Optimization Tool), MOSHELL,
WINFOIL,
Professional Synopsis
Achievements:
. Best cost effective Optimization and 3G services with SALES TEAM
delivery in Assam North-East, received EAGLE AWARD, Ericsson by Mr.
Col Mohla (Operation head -Ericsson India).
. 'Letter of Appreciation' with Cash Award from Mr. Rajesh Kumar Shukla,
Director, Head - System engineering for achievement on different 3G
projects rollout & optimisation activity.
. Worked as a Flexi Trainer for WCDMA Functionality and Optimization for
East Ericsson circle.
. Make first Speech and Video Call for BSNL-3G in NESA Circle.
. Best Technical Performer, for RF Planning during the year 2007-2008 by
Mr. Sandeep Aswal. (CTO Vodafone Essar, H.P).
. Handling all the WCDMA escalation for all the 7 circles of NESA,
India.
. Awarded twice BRAVO CARD WINNER for Planning during the year 2005-2006
Mr.Rakesh Ratan ( Country Lead, Unitech Delhi)
. Awarded as PROJECT STAR for Huawei Aircel during year 2009 by Mr
Satyapal Rana (Project Manager, Huawei Telecom India Pvt Ltd).
Work Experience- (Cellular Industry)
Organization : Ericsson Global RINA ( India ) - KOLKATA.
Duration : August-2012 till date
Designation : TECHNICAL MANAGER, Pre Sales Radio Team.
Projects / Operator: Maxis -AIRCEL, 2G and 3G Expansion and
Optimization.
Organization : Ericsson Global RASO ( BANGKOK ) - Thailand.
Duration : Jan -2012 to July 2012
Designation : TECHNICAL MANAGER, Radio Optimization and
Planning.
Projects / Operator: AIS - 3G Advance Optimization and Modernization.
Organization : Ericsson Global RASO ( JAKARTA )- INDONESIA.
Duration : Sep -2011 to Dec - 2011
Designation : SENIOR ENGG, Network and Tech Consultant.
Projects / Operator: INDOSAT - 3G Swap Project and Capacity Planning.
Organization : Ericsson RASO ( JAVA )- INDONESIA.
Duration : June -2011 to August - 2011
Designation : SENIOR ENGG, Network and Tech Consultant.
Projects / Operator: XL- AXIS - 3G Expansion and Special Project
Organization : Ericsson RCNA ( Bhutan ).
Duration : Apr -2011 to July -2011
Designation : Senior Engg Network and Tech Consultant.
Projects / Operator: BT Ltd. -3G Network Optimization
Organization : Ericsson RINA.(India)
Duration : September -2009 - April 2011
Designation : Senior Engg Network and Tech Consultant -
Advise.
Projects / Operator: Maxis-Aircel -Network Optimization- 2G and 3G.
BSNL, Planning and Optimization 2G and 3G.
Work Experience (PREVIOUS EMPLOYER)
Organization : Huawei India Pvt Ltd.
Duration : Mar-09 to Sep-09.
Designation : Assistant Manager RF Planning, Networks.
Profile : IDEA (Kolkata and ROB) launch, Planning and
Optimization.
Organization : Vodafone Essar Spacetel Ltd, India.
Duration : February-07 to March-09.
Designation : Sr.Engineer RF Planning, Networks.
Profile : Vodafone Launch (Planning and Optimization) H.P,
India
Organization : Global Telecom (GTL), India.
Duration : April-05 to February-07.
Designation : Engineer RF Planning, Networks.
Profile : Hutchison, Huawei, Reliance- India. Radio Networks.
Testing Equipment Tools Exposure:
. Drive Test: - Ericsson's TEMS Investigation (GSM / WCDMA). ACTIX,
NASTAR
. RF Planning: - TEMS Cell Planner 9.1.0, MCOM, MapInfo, UNET, ASSET.
. Post Processing Tools :-Statics, Business Object,Secure CRT, CAIT
. 2G Performance: - RPMO, RNO, MRR, FAS, NCS/NOX,ESPA, LMT-2000
. 3G Performance:- NCS,WNCS,WMRR,UETR,CTR,GPEH, Ne Explorer, CITRIX,
ESPA, ITK, GLADIATOR
. Parameter Change:- Winfield, MOSHEL
. System Proficiency :
o Ericsson System- 2G / 3G and LTE
o Nortel System- 2G
o Nokia Siemens Network-2G
o Huawei Technologies- 2G
PROFESSIONAL SKILL
ERICSSON, (South Asia - Thailand and Indonesia)
WCDMA (2nd Carrier Deployment and RBS SWAP - 6K Series) and HSPA+
. Optimization of UMTS sites based on Coverage_RSCP, Quality_Ec/Io,
Pilot pollution, Missing neighbors, Soft Handovers and IRAT Handovers
using drive test data.
. Introduction of NEW SERVICES and SOLUTION.
. Trial and Testing of NEW FEATURES in W12 B.
. Audit BOQ's and RFP within team and co-ordinated with different
vendors.
. Optimize to improve Ec/Io (Reduce Pilot Pollution) and improving
RSCP of dominant cell.
. Adding missing 3G-3G neighbors and deleting the long neighbors from
the neighbor list.
. Having idea about power control (Open loop, Inner or fast closed
loop and outer loop).
. Quality of services.
. Managing customer complaints for HSPA throughput after looking for
no of codes used for PS call.
. Analyzing the HSDPA data in terms of CQI, No of HS-DSCH codes, UE
category, the changing Modulation type, the Transport Block size
depending upon the modulation and CQI value, the BLER value.
. Checking Pilot Pollution using PCTEL Seegull 3G scanner.
. Capacity monitoring in terms of channel element usage, number of
simultaneous HSDPA users, UL received power (Prx), downlink
channelization codes, downlink transmit power.
. Optimization of existing & new network which includes KPI analysis
such as CSSR, RAB-RRC setup & retention, call drop, pilot pollution
(Inbound-Outbound), handover & handoff problems (Softer, Soft, Hard,
IRAT),handoff overhead, power control, cell breathing etc.
. HSDPA/HSUPA throughput analysis & rectifying related slow throughput
problem.
. Excellent parameter knowledge event 1A, 1B, 1C, 1D, 2D & 2F, 6A, 6B
etc.
. Involved in Customer/Client 3G Performance Meetings.
. Node B and RNC wise RF parameters planning.
. Define optimal neighbor relationships.
. Study traffic and resource utilization figures and make suggestions,
Dimensioning of RAN Network (CEs, Channel Cards, Node Bs, RNCs) for
coverage and capacity and quality requirements.
. Perform CPICH and channel power allocation.
. Analysis of site performance after integration using drive test
measurements.
. Responsible for reducing congestion and drops, improving the IRAT
Handover, Soft Handover, Location Update, Paging, CSSR, RRC Connection
& RAB Establishment Success rate in the 3G RAN network for all Voice,
Video Packet & High Speed.
ERICSSON, (India)
WCDMA (HSPA + / Network Performance and Optimisation)
. Includes Planning Node-B locations using TEMS Cell Planner, by
Prediction plots analysis of best server CPICH RSCP, CPICH Ec/No,
Downlink Throughput, Handover overlaps SHO on a ATM network.
. Link budgeting/ Power Budgeting of WCDMA using RNPT for different
clusters DU/U/S/R/I.
. Optimizing the neighbor lists of each sector by detailed analysis of
on field data collected by doing drive test and using MAP Info (TRF
tool), MCOM and OSS SHO_Evolution Report.
. Planning of Scrambling codes, LAC, RAC & SAC per Node B/RNC as per
CCR.
. NodeB and RNC Data Building, such as UTRAN Cell parameters, PS/HSDPA
Parameters, IRAT parameters, using CCR form to upload in OSS/RNC to
create new NodeB and update the network.
. Performance analysis of IRAT handovers, BLER & Ec/No, Pilot pollution,
RAB Speech, Video, R99 and HSDPA calls using drive logs, L3 RRC
messages and Network reports.
. Analysis and network tuning from the report available in OSS i.e. BO
reports, WNCS, WMRR, GPEH, UTER, CTR.
. Drilling down the log files using TEMS Route Analysis.
. Monitoring counters for 3G KPI like RRC Connection, RAB release,
IRAT, HSPA,
. Test and Implementation of HSDPA of 14.4 and 21.1 Mbps and EUL 2.0
Mbps
. IuR implementation for a test node b.
. Creating and analyzing scripts at RNC and Node b level.
. Analysing of PMR, K-GET, TEMS 3G drive test logs and 3G KPI reports
and RF Parameter audit based on the extracted reports.
. Deploying and implementation of HS 14.4 and HS 21 Mbps, cost effective
HS optimization on ATM based network.
. WCDMA BSS: Configuring ATM based traffic on each node and RNC as per
designed HLD.
. Generating scripts for IRAT and UTRAN relations.
. Testing IP's on SGSN and RNC for 3G nodes.
. Command line changes thru Secure CRT and winFIOL.
. Loading of Node licenses and up gradation to 14.4 lic thru RBS / RNC
Element Manager
GSM
. Includes Planning of New/Redeployed and Swap sites for Assam
circle.
. Optimization of Swap, New and Redeployed sites for Coverage AT
requirements.
. KPI monitoring, QOS analysis and maintenance, Parameter mapping and
fine tuning.
. Coverage and Edge/GPRS AT for Swap, New and Redeployed sites.
. Maintaining complete document and preparing weekly report for future
AT requirement of 2G and 3G.
. Dual band optimization (900 and 1800).
. Client meeting and knowledge sharing thru arranging video and voice
conferences.
. Customer management & handling 2nd level escalation for BSNL regarding
technical & performance issues.
. Ensure availability of required resources and tools
. Handled the swap from Nortel to Ericsson
Training and Workshops
. Training in Vodafone, Orissa (7thDec'08), for Eye Spot Tool - Real-
Time Optimization tool with OMCR metrics and report generation.
. Training by Ericsson India at various location for various skill set
1. WCDMA- Air Interface, Gurgaon Ericsson Training Academy
2. WCDMA- Initial tuning, Mumbai Ericsson Training Academy
3. WCDMA- HSDPA, Gurgaon Ericsson Training Academy
4. 3G Protocols and Procedure, Gurgaon Ericsson Training Academy
5. GPRS/EDGE Handling, Kolkata Ericsson Training Academy
. Workshop on LTE -Basic Deployment and Initial Tuning, Banglore- India.
. Training in Vodafone, Chandigarh(15th Jan) for TCPU- TEMS Cell Planner-
Planning Tools used for calculating Path Loss and plotting prediction
and also for planning new sites and capacity planning.
. Workshop attended by Nokia Siemens Network on the upcoming BSS/OSS/RF
(Planning and Optimization Tool).
. Training in Huwaei, Gurgaon (12th Jan to 25th Jan 07) -Frequency
Planning, Capacity Planning, Coverage Planning, Estimation tools,
Prediction Tools, Drive Test.
. Workshop on "Texas-TMS320C6713 Digital Signal Processor" organized by
Dept of Instrumentation Engg., IIT (Delhi), in association with Cranes
Software International Ltd.
. Training on CW in Telecommunication Network Solution (TNS), Noida
(10th may to 5th June '05).
Education
Post Graduation : MBA-Telecom and Operation Management.
University : National Institute of Management, Maharashtra
-Mumbai
Graduation : B.Tech. {Computer and Information Technology}
University : JAYPEE University of Information Technology
Educational Background:
PGDBM Telecom Operation Maharashtra University, A
Management. National Institute of
( Online, EPYP) Management, Mumbai
B.Tech Computer Engg and Jaypee University of 62.07%
Information Information Technology, H.P.
Technology.(
Regular)
12th I.Sc Board. International School 62%
10th I.C.S.E Board International School 69%
Personal Profile
Father's name : Md. Gheyas Uddin
Address : C/O Student Book House, Data Market
Opp: P.U
Library, Patna-6
Passport Nos. : F9881041 (2016)
Nationality : Indian
Sex : Male / Unmarried.
Email ID : ******.***@*******.***
******.*****@*****.***
Reference
Line Manager : Mr Indranil Hui (GM, Ericsson, Kolkata ):
********.***@********.***
. Mr.Ashis Das, (GM, Ericsson Kolkata)
. Mr. Kapil Satsangi ( EGI - Resource Head_ India)
. Mr. Idris Mzein (GM, EGI- India)
. Mr. Sandeep Aswal CTO ( Vodafone, Delhi- India)