JIGNESH SOLANKI
*G GSM & TRANSMISSION NOKIA AND HUAWEI INSTALLATION, COMMISSIONING &
INTEGRATION ENGINEER
professional synopsis
Electronics System Maintenance Engineering with 7 years of
experience in NSN
Installation/Commissioning/Integration/AT
. Proficient in Project management skills like planning, scheduling,
vendor development and management/implementation/GSM
. Motorola BTS Installation and Supervision. BSNL ALCATEL Installation
and supervision
. Knowledge of BTS and MW operations and maintenance on Nokia GSM, (H1,
H2) MW NEC (15 GC and 7GC )
. Widespread knowledge of telecom test equipments including VSWR Meter
(Bird, Anritsu), Power meter (Bird, Anritsu, )
. Successfully Worked 3 projects in 5 years.
. Skilled and motivated with knowledge in CDMA technologies and can
achieve proficiency in any related or specific field in a relatively
short time
. I have the ability to perform quality work within deadlines with or
without direct supervision.
. Good written and oral communications, interpersonal, analytical,
abstract reasoning and organizational skills. Effective Man management,
crisis management, positive and enthusiastic approach, result driven
approach.
. Strong analytical skills, the ability to meet deadlines, multi-task, and
prioritize. (Resource planning, budgeting, costing, profit and Loss
calculations).
work experience
GTL Limited, AHMEDABAD
GSM Project Engineer
Project Details
Project Name: 1.NSN Airtel 1800 band & 900 band GSM WEST
BANGAL
2.NSN-AIRTEL GUJARAT
3. CDMA [MOTOROLA] PROJECT GUJARAT
4.NSN-UNINOR PROJECT GUJARAT
5.NSN VODAFONE ASSAM
6. NSN IDEA PROJECT PATNA BIHAR
7. HUAWEI (tata 2g,3g,cdma) ahmedabad
8. UNINOR MW link
Customer: NOKIA SIEMENS NETWORK, AHMEDABAD.
Project Period: 2.FEB 2005 to till date
Project Size: Testing, Commissioning n Integration of more than
850 BTS sites.
OEM Equipments OEM - NOKIA SIEMENS NETWORK Pvt Ltd.
Used:
Activities
Performed: Installation and Commissioning of BTS equipment.
Survey of sites
Measuring cable loss in different format like
VSWR, RETURN LOSS, CABLE LOSS, DTF as per
customer requirements.
Perform Acceptance test.
Expansion of BTS
Prepare site specific documentation.
Coordinate all project activities with internal
and external agencies involved in the project
including customer, Engineering, etc.
Plan, implement and control project activities to
schedule and resource constraints, and meet
deliverables.
Conduct regular project reviews internally.
work experiNCE
Equipments, tEst & Measuring Instruents, Software & Applications
Telecom Equipments
. GSM
- ANDREW
- POWER WAVE
- KETHERIN
. Microwave
- NEC
- NOKIA
NOKIA HAYBRID LINK
EducAtional Qualification
. Educational Qualification
Exam. Boar/ Pass Year Percentage
Uni.
S.S.C G.S.E.B March 1997. 58.71%
ITI Govt.of July 1999. 74.42%
Electronic Guj.
(Mech.)
Apprentice Govt.of Dec. 2000 66.30%
(Ele. Mech.) Guj.
H.S.C G.S.E.B April 2001 44.33%
BA Guj. Uni. March 2004 54.42%
With (Second
Economics Class)
PASS PORT NO= F2098915
. Currently I working in Installation of HUAWEI(tata 3g.tata gsm.vtl)
operator installation and commissioning
. Site super wiser
. MICROWAVE : (INSTALLATION OF HUAWEI UNINOR MICROWAVE)
. Microwave antenna installation (0.6 mtr, 1.2 mtr, 1.8 mtr, 2 mtr size)
. microwave radio installation and earthing
. Microwave antenna alignment
. Microwave cable connectorization
. Microwave cable routing
. Microwave cable earthing
. Installation, Commissioning and alignment of HUAWEI M/W hop in
18GHz band and 23GHz.
Personal Memoranda
SOLANKI JIGNESH MAHENDRA BHAI
CONTECT NO=760*******/966-***-****
E-mail=****************@*****.**.**
E-Mail=**********@*****.***
Date of birth : 11/09/1982
Address:
24,Purvadeep Society,
Opp.Ambica Hotel,
CTM Char Rasta,
Amraiwadi,
ahmedabad
(solanki jignesh m)