DERWIN RICHMOND
Cell: 336-***-****
Greensboro, NC 27406
Home: 336-***-****
********.***.***@*****.***
SUMMARY
More than 10 years' experience with civil engineering in the creation of
detailed drawings and design layouts for over 100 bridges throughout the
east coast. Demonstrated knowledge of shop practices relative to the
manufacturing environment. Work well independently or in a team setting.
Detail oriented, with excellent communication skills. Knowledge of AASHTO
and multiple state Department of Transportation specifications. Working in
aspects of Civil, Electrical, Architectural, and Mechanical Engineering
over a 13 year period.
SOFTWARE
Skills: AutoCAD 2011, AutoCAD LT, FlyCAD-LASIT, Microsoft Office: Word
(200+ hours), Excel (100+ hours), Outlook (200+ hours), PowerPoint (50+
hours), Brady Markware
Knowledgeable: SolidWorks, Rhino 3D, Inventor, Revit, 3D Studio MAX
EDUCATION
ITT Technical Institute - Computer Drafting and Design
Associate of Applied Science degree, anticipated graduation June, 2013
PROFESSIONAL EXPERIENCE
Nestle USA (Adecco Technical Professionals-Contract Position) Danville,
VA/Food Manufacturing Company/
CAD Operator, 06/2012 - Present
. Create templates and layouts of the plant floor.
. Scale equipment and place in relation to the plant rooms and floor
plan.
. Update CAD drawings, create and organize labels for plant equipment.
. Asset counting and capital resolution using AutoCAD 2011
Purolator-Facet, Inc. (Express Employment Professionals-Contract Position)
Greensboro, NC/Filtration Company/
Laser Marking Programmer, 09/2011 - 04/2012
. Create programs specifications for laser markings utilizing FlyCad-
LASIT.
. Document changes in excel for changes made to product.
. Assist packaging engineers with laser markings and labeling to
identify product.
Hirschfeld Industries Bridge - Greensboro, NC/Steel Manufacturing Company/
AutoCAD Draftsman, 06/2000 - 11/2010
. Performed data analysis and provided recommendations to achieve
completion of detailing bridges for the shop to cut, burn, paint, and
erect in the field.
. Worked with the purchase of material with in billing of material
through requisitions.
. Detailed structural beams, cross frames, girders, sole plates, and
brackets using AutoCAD 2011.
Notable Bridge Projects
> The Central Artery/Tunnel Project - "The Big Dig" (Boston, MA) -
2005
> Cooper River Bridge - (Charleston, SC) - 2004
> Woodrow Wilson Bridge Expansion - (Washington, DC) - 2002