Post Job Free
Sign in

Plant Sales

Location:
Abu Dhabi, AZ, United Arab Emirates
Posted:
March 08, 2013

Contact this candidate

Resume:

Ghulam Mustafa

Personal Information

Date Of birth 1st Nov, 1978

Nationality Pakistani

D/License UAE/Pakistan/ Qatar

Marital Status Married

Phone UAE: +971-**-*******

Pakistan: +927********

Email *************@*****.**.**;

*************@****.**

Correspondence Senior Operation Supervisor ADCO Shah Field PO Box

270 Abu Dhabi UAE

Education

1. M.Sc Process technology and management

University of Strathclyde UK

2. M.Sc Chemistry 1998

University of Sind Jamshoro Pakistan awarded 2nd position Gold medalist

Professional Experiences

Total Experience 16.2

Years

. Abu Dhabi company for onshore oil operations

. Since May 2009

. Operations Supervisor

. Abu Dhabi company for onshore oil operations is the states largest oil

producing company, its operation is in the largest desert, having export

of more than 2 million barrel/day, also Sour gas treatment and export,,

I am the part of the Start up & commissioning team, I am leading the

operation team, My jobs are but not limited to

. Ensure the final Commissioning phase and start up Operations of the

onshore process trains are conducted in safe and effective manner

whist meeting the Company targets.

. Commissioning of Artificial lift oil wells using ESP, water and gas

injection lift wells, Gas processing plant and sales compressors

. Preparing in conjunction with Start-Up Team and Onshore Commissioning

Team, the start up sequence for process plant.

. Carry out the process verification to support the start up procedures

and SIMOP management.

. Assist in preparation of the acceptance requirements of facilities

hand over both for interim and final Operations.

. Well operation of Natural flow wells, Artificial wells, Water

injection and gas compression

. Establish in conjunction with the Start-Up Team, Vendors support

requirements during initial operations.

. Prepare and/or review the individual units start up procedures.

. Attend and participate in "walk downs" of systems to generate punch

lists in conjunction with commissioning teams.

. Assist in preparing preservation plans and procedures.

. Effluent and waste water treatment.

. Assist in developing OJT Strategy & Plan for gradual exposure of Local

staff.

. Assist in defining the safety requirements of facilities start up.

. Assist in validating emission forecast of start up phase.

. RasGas LNG Limited QATAR

. Supervisor

. From Oct 2007 to May 2009

. RasGas is world Class company in Qatar having Sour Gas, LNG,LPG, ethane,

Propane, butane, pentane and Isopentane production, I worked as a Shift

Supervisor for Sour gas treatment, liquid and dry Sulphur handling .

Plant has 1570 MMSCFD capacity and consists on the following unit. I

involve in commissioning of following Units of the plant.

. Responsibilities:

. Operation of gas processing, LPG and sales gas plant including

demethanizer, de-ethanizer, depropanizer, debutanizer, depantanizer and

deisopentanizer

. Lead the team responsible for safe and smooth startup of Sulphur

recovery unit

. Issues and maintains the project operations schedule

. Lead the team for Sulphur recovery unit start up.

. Preparation of daily Commissioning report.

. Good Control on Foxboro I / A 8.3 distributive Control System and

Triconix TMR Process emergency shut down system.

. Supervised the refractory dry out activities of Reaction furnace

and Sour gas incinerator.

. Reviews and understands contract documents, specifications and

drawings of operation under supervision.

. Carryout Loop function test and logic test for newly installed

control system.

. Plan and Carry out activities for QATARIZATION which includes OJT

schedules for National Operators and trainees.

. Markup and update revised as build P & IDs.

ENI PAKISTAN LIMITED

Operation Supervisor

Since March.2003 to Oct 2007

. Bhit Gas Field Plant produces 270 MMscfd Natural Gas for its client

SSGCL using the state of the art technology Cryogenic process for

removal of 18 % Nitrogen in raw Gas. The main processing Plant is

configured as 2x50% identical Trains having design capacity of 135

MMscfd each. I involve in commissioning of the plant. Plant consists

on the following units.

. Plant control is designed by ABB ADVANT -OCS-450 & AC-800 M.

. Plant consists of following units.

. LPG and gas processing plant

. Rolls Royce Gas Turbines for Power Generation. (03turbines each 27

MW)

. Gas Production wells.

. Inlet Separation & Heating.

. DEA, Gas sweetening unit for CO2 removal.

. Gas Dehydration (Molecular Sieve) unit provided by ISG (ITALY).

. Sales Gas Centrifugal Compressors (Man Turbo).

. Gas Metering Station (DANIEL online Gas chromatograph).

. Propane Refrigeration System provided by (TOROMOUNT) USA.

. Rolls Royce Gas Turbines for Power Generation. (03turbines each 27

MW)

. Heating Medium System (TEG).

. Instrument Air Compressor (ATLAS COPCO) with Chiller Package.

. Produced Water Treatment Unit.

. Fuel Gas & Condensate stabilization System.

. Waster Water treatment

. Vent & Flare.

. Fire & Gas Control and Plant ESD System.

PROFESSIONAL EXPERIENCE IN FFBL:

. Oct 1999 to March 2003

. Panel Operator

. Urea plant is designed by Stamicarbon having capacity 1670 MTPD

used CO2 stripping process controlled by DCS Bailey Infi-90

France. Prepare 96% Urea solution liquid.

. EXPERIENCE OF STARTUP ACTIVITIES

. I have participated in the following activities at the urea plant

with our project team DESCON (Pakistan), KREBS (France) and

KLOCKNER (Germany).

. Erection, Pre-commissioning, commissioning.

. Waste water treatment

. Steam blowing water runs.

. Water flushing and chemical cleaning.

. Instrumentation and process control loops checks.

. Cold startup, Actual startup.

Engro Vopak terminal ltd. (Formerly Paktank Terminal ltd).

. January 1999 to October 1999

. Operator

. Engro Vopak terminal limited (formerly known as Engro Paktank

terminal Limited Karachi).

. I was responsible for ship handling, analyses, unloading and storage

of different chemicals through loading arms. Such as Paraxylene,

Acetic acid, LPG (Liquefied Petroleum Gas) VCM (Vinyl Chloride

Monomer), ACN (Acryl Nitrile Monomer) and Phosphoric Acid

. Participated in Erection, Commissioning, Nitrogen blowing of

liquefied Petroleum gas,

. ACN and VCM. Working on EVTL's own jetty, including marine loading

arms operation and pigging operation.

ENGRO CHEMICAL PAKISTAN LIMITED (Formerly Exxon Chemical Pakistan ltd)

. January1997 to December 1998

. Operator

. I have been worked on the following sections at Urea Plant. I

remain involve in the commissioning of Gas Turbines of power house

. Gas Turbines Mark V (each 12MW)

. HP synthesis.

. CO2 Compressor. (Steam turbine driven)

. Recovery and Decomposition.

. Periling section

Professional Trainings

. "Sulphur Recover Unit" Training session by Sulphur experts from

USA through Howard technology.

. "Amine Treating" Training session by Amine experts USA of Howard

technology.

. "Reaction Furnace Burner" Training session by ZEECO Inc. Texas,

USA.

. "Sulphur Incinerator Burner" Training session by JOHN ZINK Inc.

Canada

. Fire fighting training from Karachi University.

. National Environmental conference in Sind University.

. ISO 9000 training from Engro Chemical Pakistan Ltd.

. Fire Fighting Training at Bhit Gas Field conducted by EUOROLINK

(UAE).

. Fire & Gas leakage handling courses at Fauji Jordan Fertilizer

Company Limited, Port Qasim, KARACHI.



Contact this candidate