Post Job Free
Sign in

Plant Engineer

Location:
Raigarh, CT, 496108, India
Salary:
8 laks INR per annum
Posted:
March 08, 2013

Contact this candidate

Resume:

Tapas Anjan Sarangi

Email : ***********@*****.***

Phone : +91-789**-**-*** / 881**-**-***

Experience Summary

I have close to 5 Years of rich experience in Power System Analysis and

Testing of Power system equipment, Protection relays (IEDs) Design and

Development of Schemes through Power system analysis.

I have the experience of working with prestigious clients like SAIL, Aditya

Birla & Jindal to provide solutions for critical problems they faced using

power system analysis tools like MiPower, Etap.

Having practical experience of Electrical Testing of IEDs (Siprotec, Areva,

ABB relays including those used for Generator, Transformer, Motor, Feeder

Protection) using Omicron's Universal Test Module.

Electrical Testing of 250 MW Generators, Exciter & Automatic Voltage

Regulator, Power Transformers up to 315 MVA level.

Goal:

To move into Power System Consultancy Business, working with different

streams of projects to provide the required solutions to clients using my

good analysis and practical skills.

Specialties

- Protection Co-ordination to avoid spurious tripping of relays, Loadflow,

Short circuit, Stability analysis.

- Testing of protection IED's

- Testing of different Modules in Numerical relays using Omicron's

Universal Test Module.

- Testing of EHV equipments.

- Continuously contributing to Productivity enhancement has been my

expertise all along my career

- A preferred resource in testing application of IEDs; adept in MiPower and

ETAP.

Carrier Profile

Dates Organization Designation

01-JULY-2008 to Power Research & Engineer in Power System

24-JULY-2010 Development Studies

Consultant

01-AUG-2010 to till Jindal Power Assistant Manager in

date Limited Electrical Testing

Department

Project Overview

1) SAIL-Bhilai : System study of 7.0 MTPA Expansion

Project

2) Aditya Birla Chemicals India Ltd. : Power System Studies

3) Jindal Stailness Ltd. : Protection Devices

Co-ordination

4) Jindal Power Ltd. : SAP PM Module

5) Jindal Power Ltd. : Implementation of Auto Bus Change

Over Scheme

6) Jindal Power Ltd. : Implementation of 400 kV Line trip

to Generator Tripping scheme

7) Jindal Power Ltd. : HT motor tripping from Bus Relay-

Logic Preparation and execution

Technology

1) Power System Analysis Software - MiPower, working knowledge of ETAP,

CYME

2) Microsoft Office

3) SAP

4) Omicron's Universal Test Module

5) Siemens - DIGSI

6) Micom S1 Studio

7) Areva - e.terra browser

Skillset

1) Designing skills involving Load Flow Analysis, Short Circuit Analysis,

and Transient Stability Study of Generators.

2) Designing Protection System and Co-ordination via relay setting

calculation.

3) Good knowledge of Control Logics.

Qualifications

Degree Institute Major and Year of

Specialization Passing out

Bachelor of Silicon Institute of Electrical & 2008

Technology Technology, Bhubaneswar Electronics Engg.

Accolades

Conferred with Executive of the Month-Feb, 2013 for successfully designing

and implementing Auto Bus Change Over scheme at CTPMCC.

Projects carried out at PRDC

1)

Project System Study for (SAIL) Bhilai Steel Plant

7.0 MTPA Expansion project

Customer Steel Authority of India Limited (SAIL)

Description Coming of 2 X 250 MW power plant and new 7.0

MTPA load's effect on load flow,

short-circuit level, transient cases and

relay co-ordination.Loadflow at the time of

different contingency cases inside plant as

well as in CSEB network.

Role As a Team member, I was involved in Data

Collection of various equipments in the

Plant, verification of data with

M/s.SAIL-BSP's assistant manager and

DGM(ETL).

Drawing of Single Line Diagrams of the whole

plant upto 0.415 kV, Load Flow Simulation,

Various Contingencies, short circuit studies.

Responsibilities Prepared daily status report.

Communicating with the client for requirement

clarification.

Name plate Data Collection of various

equipments of the plant

Understanding the plant working

configuration.

Analyzing software requirements, functional

and technical specifications

Preparing Single Line Diagrams of the whole

plant up to 0.415 kV

Execution of Load Flow Simulation including

whole Western Region Grid, Various

Contingencies cases possible including

outages of some CSEB transmission lines.

Short circuit study (Three phase to ground

fault & SLG) simulation.

Largest Motor starting study.

Discussion with the customers on functional

requirements & results

Providing status update to client

Tools MiPower

Highlights Received appreciation from client for good

data collection and

for the presentation we have given to

M/s.SAIL-BSP's GM (Electrical) and managers

on part completion of the project.

2)

Project System Study for Aditya Birla Chemicals

(India) Ltd

Customer Aditya Birla Group

Description Total plant SLD preparation according to data

collected at site and verified by M/s.ABCIL's

engineer and GM(Electrical).Main problem

faced by M/s.ABCIL is frequent tripping of

islanding relay (Micom P341) and generator

tripping.

Role Involved in Data Collection, verification,

preparation of single line diagram, executing

system study (Load flow, Short circuit,

Transient cases and Relay co-ordination) and

report preparation.

Responsibilities Name plate Data Collection of various

equipments of the plant and verification from

client.

Understanding the plant working

configuration.

Analyzing software requirements, functional

and technical specifications

Preparing Single Line Diagrams of the whole

plant up to 0.415 kV

Execution of Load Flow Simulation with

various contingencies cases possible.

Short circuit study (Three phase to ground

fault & SLG) simulation.

Largest Motor starting study.

Relay co-ordination study.

Discussion with the customers on functional

requirements & Test Results

Providing Status update to client

Tools MiPower

3)

Project Relay Co-ordination Study for Jindal

Stainless Limited

Customer Jindal Stainless Limited, Hisar, Haryana

Description Total plant SLD preparation according to data

collected at site and verified by M/s. JSL's

engineer. Detailed enquiry of main problem

faced by M/s. JSL for frequent tripping of

relay inside plant.

Role Involved in Data Collection, verification,

preparation of single line diagram, executing

system study (Load flow, Short circuit, as a

base for relay co-ordination) and report

preparation.

Responsibilities Name plate Data Collection of various

equipments of the plant and verification from

client.

Understanding the plant working

configuration.

Analyzing software requirements, functional

and technical specifications

Preparing Single Line Diagrams of the whole

plant up to 6.6 kV

Execution of Load Flow Simulation with

various contingencies cases possible.

Short circuit study (Three phase to ground

fault & SLG) simulation.

Relay co-ordination study.

Discussion with the customers on functional

requirements & Test Results

Providing Status update to client

Additional Given MiPower software demonstration to

responsibilities client

Co-ordinated the relays at site after

successful technical discussion with

concerned sub station engineers.

Tools MiPower

Responsibilities at Jindal Power Limited

As a part of Electrical Testing Team, I am looking into the following areas

:

> Planning and Managing Annual Overhauling Testing works.

> Carrying scheduled testing of Electrical Protection Relays (Generator

Protection Relays, Feeder Protection, Bus Protection, Motor

Protection etc.),

> Carrying out In-Depth testing of Protection Relays, Power Transformers

(upto 315 MVA), Rectifier Transformers, Bus Reactor, Automatic Voltage

Regulator, Generator, HT/LT Motors, and Calibration of Measuring

Equipments.

> Responsible for allotment of work to the resources and maintaining the

stock of equipment spares in priority basis.

Achievements at Jindal Power

> As SAP Core Team Member, worked with Accenture's SAP team and

successfully implemented SAP including Preventive Maintenance and Relay

Testing module.

> Prepared Relay Test Bench's concept at Jindal Power and executed the

same successfully.

> Designed Line Trip to Unit Trip scheme and implemented the same.

> Revised the Relay Co-ordination in the entire plant network.

> Modification of protection logic for Bus Change-over Scheme and

implemented the scheme at BOP area.

> Created Protection Logic for Tripping of 6.6 kV motors from Bus PT

relay's output.

Personal Details

Date of Birth 02-03-1985

Nationality INDIAN

Passport Status Present



Contact this candidate