OBJECTIVE
I am a mechanical engineer seeking an engineering position in a result
driven and challenging environment that will utilize my operational
experience in drilling and production.
EDUCATION
University of Texas - Pan American Edinburg, Texas
Bachelor of Science in Mechanical Engineering December 2008
University of Texas at Austin Austin, Texas
Bachelor of Arts in Spanish August 2010
EXPERIENCE
Baker Hughes Claremore, Oklahoma
Progressing Cavity Pumps Engineer January 2012-Present
. Collaborate on any issues with PCP systems with Manufacturing,
Purchasing, Sales & Marketing, Field Service and other product lines.
. Provide support to global regions on tenders, technical equipment
selection, cost estimates and applications support.
. Assist on component failure analysis and testing for product quality
improvement.
. Support regions with revised drawings and translation of equipment needed
for the operation.
. Review and update installation manuals, marketing material and other
assigned projects by management.
Weatherford
Tullow Oil Houston, Texas
Project Engineer September 2010-December 2010
. Provided support on a rig refurbishment for Uganda project, as well as
scope of work for a category IV inspection.
. Assisted project personnel with the assembling of rig components and
testing for commissioning.
. Supervised the MPI (Magnetic Particle Inspections) needed to be completed
on lifting points on the various areas on the rig.
. Gathered certifications on inspections and additional equipment, compiled
lifting gear and pressure relieve valve registry, going over API
specifications to make sure in accordance to standards.
. Aided in organizing AFP's by corresponding AFE in order to have material
in time for the rig to be commissioned.
Weatherford
Ecopetrol Bogota, Colombia
Project Engineer April 2010-September 2010
. Coordinated with operations manager, project manager, and other product
lines for providing support in the start up of the Colombia operation.
. Participated with finance and procurement personnel for the start up on
new project, as well as assist in understanding corporate policies and
how to implement them.
. Worked with operation field superintendents and customer on ensuring
installation for festoon and gumbo box completed on rigs for contract
requirements.
. Aided rig crews and management during skidding and rig moves while
updating checklist and standard operating procedures.
. Guided and coordinated with human resources on setting up monthly formats
for payroll, deadlines, logistics, work visas and roster crew changes.
. Training and working on land rigs with rig crew as well as with the
various product lines on assuring top performance and minimizing
nonproductive time as much as possible.
. Visiting, auditing, and following up with machine shop on drilling
equipment and evaluating repairs and testing for services rendered for
optimal project performance.
Weatherford
PEMEX-Burgos VI Reynosa, M xico
Drilling Engineer July 2009-April 2010
. Assisted with management team to bring about efforts with various day to
day activities for the operation, logistics, procurement, and HR.
. Aided with client, maintenance crew, and management on operational
setbacks, as well as work with fabrication company with drawings and
material needed.
. Worked with maintenance crew and fabrication company on corrective and
preventative actions taken on a telescopic rig (installation of hydraulic
system, three way valve for emergency backup, roofs over motors, camera
(CCTV) system with registry, back up hydraulic system, and ultrasound
test to inspect all welds on mast and pins).
. Monitored daily rig operations to ensure progress of wells, cost
budgeting, and safe practices.
. Maintained invoicing of Rig drilling activities, closeout of safety
incidents, key performance indicators, forecasted revenue, and failure
analysis investigation.
. Assisted with maintenance crew on rig refurbishment on a drilling rig for
a Category IV inspection and management with a scope of work.
Weatherford
PEMEX-ATG Poza Rica, M xico
Drilling Engineer March 2009-July 2009
. Field training on drilling rig to gain an understanding of rig equipment
and well completion procedures.
. Worked with rig personnel to develop for rig specific standard operating
practices for all applicable drilling operations.
. Assist rig personnel on material being received for restocking of
warehouse for minimum and maximum stock levels needed.
. Provided daily rig reports with a team of engineers and field
superintendents of operation necessities for ensuring continued
successful performance.
. Measured the drilling well progress on rigs for improvements on bettering
project expectations and guidelines.
. Formulated crew change schedule to help out on cost minimization for an
18 rig operation.
. Populate templates for ease on a growing operation, calendar scheduling
courses (ex. Rig Pass), and rig up personnel.
Skills / Interests
Computer Skills: Working Knowledge of SAP and AutoCAD. Proficient in
Microsoft Office Applications (Excel, PowerPoint, Word, and Projects).
Certifications/courses
WellCAP, Supervisor Level
Stuck Pipe Prevention
Rig Pass
Mar a Elena Espinoza
( 2001 W Princeton Circle ( Broken Arrow, OK 74012 956-***-**** (
************@*****.*** (