Resume of Rhonda Austin
Rhonda Austin
Chattanooga, TN 37416
********@***.***
Professional Objective:
To further advance my knowledge and career in the Nuclear Industry by acquiring a growth-
oriented position that offers both challenges and rewards that allows the contribution of skills
which I have developed through education and experience as a Senior Radiological Control
Specialist and Primavera P6 Release 7.
Education:
Graduated from Chattanooga High School of Performing Arts Chattanooga, TN
1995-1999
Chattanooga State Technical Community College Chattanooga, TN
Engineering Radiation Protection Program
2008-2009
Credits in the following Nuclear Courses:
Radiation Protection and Radiological Health Administration
Nuclear Seminar
Nuclear Physics
Introduction to Health Physics and Industrial Hygiene
Evans Technology, Inc. Oracle Platinum Partner
Primavera P6 Release 7- Client 102
PDUs: 19.5
August 2012
Course Objectives:
Introduction to Primavera Formatting Schedule Data
Project Management Life Cycle Roles & Resources
Data, Navigation & Layouts Assigning Roles
Enterprise Project Structure Assigning Resources & Cost
Creating a Project Analyzing Resources
Creating work break down structure Optimizing the Project Plan
Adding Activities Baselining the project Plan
Creating Relationships Project Execution & Control
Scheduling Reporting Performance
Assigning Constraints Project Web site
Maintaining the Project Documents
Library
1 Page
Resume of Rhonda Austin
Summary of Qualifications:
Bartlett Site Manager and Senior Radiological Control Specialist, I am a highly organized and
focused individual. I have a well-rounded background in training and safety, including those that
must comply with corporate and government guidelines. I have self discipline, attention to detail,
and appreciation of following strict policies and procedures. I have successfully worked to ensure
applicable rules and policies are followed. I professionally interact with all personnel levels within
the plant to ensure that ALARA is practiced, appropriate decontamination techniques are utilized,
and all safety precautions are followed. I have demonstrated proficiency in planning, scheduling
and controlling projects using the Primavera P6 Release 7- Client 102 and completed training at
Evans Technology.
Employment Experience:
11/16/2009 Watts Bar Nuclear Power Plant (Bartlett)
Present Bartlett Site Manager
Duties included: Oversight of contract personnel. Able to communicate with the contractors, client,
and the employer. Tracking and Controlling Contract Expenditures. Understanding and able to
level out work scopes. Able to resolve issues that may arise. Coordinate the scheduling, planning,
training, in/out-processing, security, and etc of all Bartlett contractors. Creating Gantt charts and
organizing schedules. Monitor project budgets and support management with cost estimates.
Performed routine surveys of various areas, Radiography support, Job coverage for various types
of Valve breaching and outage RP support.
09/21/2009 Sequoyah Nuclear Power Plant (Bartlett)
11/11/2009 Health Physics Technician
Duties included: Upper and Lower containment control point duties, performed daily radiation and
contamination surveys of various areas, counted and calculated air sample activity, surveyed tools
and equipment, monitored personnel entering and exiting contaminated areas, conducted RWP
briefings for work in the RCA
08/10/2009 Watts Bar Nuclear Power Plant (Bartlett)
09/18/2009 Health Physics Technician
Duties included: Lower and Upper containment control point duties, performed daily surveys of
various areas, counted and calculated air sample activity, surveyed tools and equipment. Job
coverage in HRA. Monitored personnel entering and exiting contaminated areas, conducted RWP
briefings for work in the RCA
6/02/2008 Watts Bar Nuclear Power Plant (Bartlett)
01/23/2009 Health Physics Technician
Duties included: Support of the free release for Unit 2 Containment and Annulus. In conjunctions
with Millennium s statistical surveys, all surveys were performed and documented on permanent
plant structures and scaffolding. Performed routine surveys for Unit 2 Auxiliary Building. Assisted
in organizing the plan for document control for Millennium and keep all survey documents
recorded and accurately reported. Performed daily radiation and contamination surveys of various
areas, counted and calculated air sample activity, surveyed tools and equipment, conducted RWP
briefings for work in the RCA, Job coverage in HRA under the surveillance of a Sr Technician
4/28/2008 Sequoyah Nuclear Power Plant (Bartlett)
2 Page
Resume of Rhonda Austin
5/25/2008 Health Physics Technician
Duties included: Lower containment control point duties, performed daily radiation and
contamination surveys of various areas, counted and calculated air sample activity, surveyed tools
and equipment, conducted RWP briefings for work in the RCA, Job coverage in HRA under the
surveillance of a Sr Technician. Monitored personnel entering and exiting contaminated areas
3/03/2008 Browns Ferry Nuclear Power Station (Bartlett)
4/27/2008 Health Physics Technician
Duties included: Monitored the RCA boundary entries and exits, assisted Senior HPs while
decontaminating contaminated areas, and assisted SHPs with surveys of different areas. Assisted
with drywell support and monitored teleview. Released materials from CA to RCA and performed
routine surveys. Job coverage in posted HRA and VHRA under the surveillance of a Sr Technician
in drywell, performed daily radiation and contamination surveys of various areas, counted and
calculated air sample activity, surveyed tools and equipment, conducted RWP briefings for work in
the RCA
9/19/2007 Sequoyah Nuclear Power Plant (Bartlett)
10/23/2007 Health Physics Technician
Duties included: Upper containment control point duties included: performed daily radiation and
contamination surveys of various areas, counted and calculated air sample activity, surveyed tools
and equipment, monitored personnel entering and exiting contaminated areas
2/5/2007 Browns Ferry Nuclear Power Station (Bartlett)
4/12/2007 Radiological Control Technician I
Duties included: Performed routine surveys and released material via SAM. Performed personnel
decontamination and back track surveys. Released equipment from contaminated areas to the
RCA. Performed duties at the RCA entries/exits. Performed control point duties at Unit 1 & 2
drywell. Job coverage in posted HRA and VHRA under the surveillance of a Sr Technician in
drywell, performed daily radiation and contamination surveys of various areas, counted and
calculated air sample activity, surveyed tools and equipment, conducted RWP briefings for work in
the RCA
11/13/2006 Sequoyah Nuclear Power Plant (Bartlett)
12/22/2006 Radiological Control Technician I
Duties included: Upper containment control point duties included: performed daily radiation and
contamination surveys of various areas, counted and calculated air sample activity, surveyed tools
and equipment, monitored personnel entering and exiting contaminated areas
8/28/2006 Watts Bar Nuclear Power Plant
11/10/2006 Plant Services
Duties included: Deconning, steam generator platforms, SI-11 access control for upper/lower
containment, Rad-trash/laundry pickup. Interact with all personnel levels within the plant and
supported Radcon to ensure that ALARA is practiced.
3/21/2005 Browns Ferry Nuclear Power Station (Bartlett)
4/15/2005 Health Physics Technician
3 Page
Resume of Rhonda Austin
Duties included: Monitored the RCA boundary entries and exits, assisted Senior HPs while
decontaminating contaminated areas, Job coverage in posted HRA and VHRA under the
surveillance of a Sr Technician performed daily radiation and contamination surveys of various
areas, counted and calculated air sample activity, surveyed tools and equipment, conducted RWP
briefings for work in the RCA
References:
James Williams Orr
Vice President of Operations
BNI Executive Team
800-225-0385ext 1373
John A Adams
Radiation Protection Project Manager
Watts Bar Nuclear Power Plant
MOB 2U-WBN
423/365-8025
Donna J Stevens
Radiation Protection Supervisor
Sequoyah Nuclear Power Plant
SB 2A-SQN
423/843-7082
Anthony Wayne Hooks
Radiation Protection Manager
Watts Bar Nuclear Power Plant
MOB 2U-WBN
423/365-1872
Calvin T. Felton
Radiation Protection-ALARA
Watts Bar Nuclear Power Plant
MOB 2U-WBN
423/365-3886
4 Page