Nino Luciano Quintanilla Salinas
Place of birth: Monterrey,Nuevo León,México
Current address: William Backer #130, Colinas de San Jerónimo, Monterrey, Nuevo León, México.
Phone number: Home: +52-81-831***** Cellular phone: +52-81-809*****
E-mail: ****.***********@*****.***
Education
Master of Engineering – Industrial Engineering
Texas A&M University 2011, College Station, United States
B.S. Mechatronics Engineering
ITESM Campus Monterrey 2005
Exchange program :
Ecole Nationale Supérieure d’Arts et Métiers (ENSAM). Paris, France
Student Interchange in mechanical and industrial engineering (2005)
Professional experience
QUALTIA ALIMENTOS OPERACIONES Food Products and Processing
San Nicolas de Los Garza,Mexico
Procurement and Purchasing Manager – Ingredients and Packaging. (2012 – to date)
*Include recently acquired plants in the Qualtia Procurement System (3 new plants)
*Increase in credit terms with main suppliers
*Cost reductions (350 KUSD)
* Implementation of paperless purchasing authorization system
Procurement Leader – Ingredients and Packaging (2009 - 2010)
Procurement of raw materials (ingredients and packaging) for 3 Qualtia's production plants. Price and delivery conditions negociation. Leading projects to increase efficiency in material flow.
* Implementation of Delivery Kanban (PULL SYSTEM) with suppliers that represent 40% of the total purchase at Monterrey Plant
* 60% inventory reduction in materials supplied by Kanban *60% cycle time reduction at product reception at the warehouse
* Implementation of supply of formulations by kanban obtaining an 95% WIP inventory reduction from 12 hours to 30 min
XIGNUX CORPORATIVO S.A. DE C.V.
Lean Manufacturing Specialist (2008 - 2009)
Consulting in Lean Manufacturing Projects in XIGNUX Divisions
BYDSA (Snack food manufacturer and distributor): 65% reduction of cycle time in traditional channel salesmen daily product loading.
Implementation of one piece flow process
VOLTRAK (Electrical engineering services) 27% reduction in cycle time in rehabilitations of power transformers in AHMSA
30% reduction of installation time of power transformers (180 MVA) at AHMSA (Fenix Project)
Xignux Leadership Program. (2006 -2007)
XIGNUX two year program for young professionals with rotations in four projects in different divisions of the group.
ARNECOM INSTRUMENTOS, Monterrey, N.L.
Implementation of automatic changeover system in surface mount welding lines for Toyota Tacoma and Tundra and GMT-900 instrument panels
Reduction of 65% in changeover times
Increase of 7% in total plant capacity
Kanban cycle increase, achieving 75% WIP inventory reduction.
july-december 2007
PROLEC-GE, Monterrey, N.L.
Implementation of TPS methodology to increase capacity of residential transformer tanks forming welding and painting lines.
60% reduction in WIP
50% reduction in Manufacturing cycle time
January - June 2007
GE COMMERCIAL TRANSFORMER, Shreveport, Louisiana
Validation of critical supplier in product specifications and delivery. Consulting the supplier's manufacturing and logistics operations.
Reduction of 90% in defects from the critical supplier
400% increase in on-time deliveries
July - December 2006
VIAKABLE - CONDUCTORES MONTERREY, Monterrey, N.L.
Reduction of PVC overconsumption in flexible cable extrusion lines
60KUSD savings per year
January- June 2006