Post Job Free
Sign in

Manager Electrical

Location:
Portsmouth, HAM, PO11 9LG, United Kingdom
Salary:
Dependant on position
Posted:
March 02, 2013

Contact this candidate

Resume:

Mr Jack Henstock

Flat * Bucaneer House,** Rails Lane, Hayling Island. PO119LG

Tele: 023******** Mob: 079********

Email: aboj31@r.postjobfree.com

Profile

An experienced and enthusiastic person who has worked in a national and multi-cultural environment. A

dedicated, professional individual whose capable of working long hours in any demanding environment, coupled

with an ability to achieve tight deadlines and targets ensuring high standards and professionalism are maintained at

all times. Equally at home working as part of a team or, when required, unsupervised. A proven track record for

being an adaptable and conscientious worker, who can react quickly and sensibly to new or fluid situations.

Extensive Knowledge of Nokia Flexi Systems from initial Installation to Fault Finding at unit Level

Abel to adapt and learn new systems of operation with the minimum of Fuss.

Willing to learn new operating System no matter what the level and complexity

Most Recent Employment

Babcock October 2011- Present

MBNL Project installation and Commissioning

Parasitic Conversions

Ultrasite Commissioning and Fault Fiding

Huawi Installation

Connection and testing of ATM and Ethernet Systems

Liason and Fault Finding with SOG Team

6 Sector Sites

Mac Transproving

Carillion October 2010-October 2011

Orange Project Install and Commissioning of Flexi Systems

Upgrade of ultrasites

Cabinet Conversions

Hartwood Services December 2009-October 2010

MBNL Project Install and Commissioning of Flexi System

Ultasite Course.

Ultrasite Upgrades and Commissioning

Babcock Services June 2009- December 2009

Commissioner/Installer,Electrician.

Nokia Licenced Commissioner/installer of Flexi system.

Fully accredited on all aspects of Flexi Installs

Jib accredited Electrican (Technician)

Carillion

Installer/Commissioner Dec2008 – June 2009

Installation and commissioning of Nokia Equipment on the MBNL project

EIC LTD Lymington July 2008 – Dec 2008

Contract Supervisor

Site Management of Employed and Sub-contract

Staff

Client liason at site and office levels

On the ground problem solution

Design alteration and implementation

Health and safety

Dartmouth General Contractors Fareham January 2008- July 2008

Electrical Manager

Costing of Tenders

Design of installations

NICEIC Manager

Liason with Clients

On tool problem solving and installation

Mitie Engineering Services (Retail) Ltd Farnham August 2007 – January 2008

My role as Contracts Engineer includes:

Site Management of electrical sub-contractors

Ensuring completion targets dates are met

Liason with Clients

Ensuring Health and Safety guidelines are met

B.Barden Electrical Services Ltd Hampshire February 2006 – Aug 07

Working as an operations manager for a large electrical company, my duties include:

Ensuring all necessary risk assessments are carried out and kept up to date

Maintaining a safe work environment

Ensuring all new and existing plant is assessed and safe to use

Continually improving methods to increase the quality of service we provide to our clients

Ensuring training is provided to members of staff at all times

Project management including costing, ordering & man-management

Installation of electrical, air-conditioning and refrigeration

Designing and implementing new systems to clients requirements

Completion of all relevant certification and following set guidelines to meet requirements of governing bodies

Travelling throughout UK

Supervision of staff including apprentices

NIC

Call-outs as and when required

Ensuring clients contracts are followed and amended as and when needed

ICEE Limited Hampshire Sep 2005 – February 2006

Employed as NICEIC Manager, my duties involved:

Being responsible for the day to day operation of installing and maintaining electrical, air-conditioning

systems

Hands on control of correct installation procedures

Ensuring all NICEIC guidelines are met

Ensuring all relevant certification is completed

Attending review meetings with NICEIC inspector

Ensuring all health & safety guidelines are being adhered to

The design of electrical installations including project management

Installation and testing of communications equipment

Appointed First Aider

Airtech (HVAC) Limited Hampshire July 2004 – August 2005

During my employment as Electrical manager, my day to day duties included:

Carrying out fault finding and repairs

Installation of new electrical systems

Attending emergency call outs

Travel though out UK

Carrying out preventive planned maintenance and reactive maintenance of systems

Complete involvement in designing and implementing new builds

Fire systems installation including follow up maintenance

NICEIC Supervisor

Ensuring all certification is completed correctly

Maintenance of plant equipment

Ensuring all Health & Safety guidelines are adhered to

Powertec (HVAC & Electrical) Limited Hampshire April 1991 – March 2004

For a 13 year period I successfully established my own company, which grew to become a limited company

employing 30 + staff, the main duties of my role as managing Director were:

Complete management of 30 Electricians including apprentices

Contract management

Design and implementation of fire alarm systems, electrical systems, air conditioning and refrigeration.

Ensuring all relevant training is provided to staff

Supervision of administration staff

Project management

Costing management

Maintenance contracting

Emergency call out management and attendance as and when needed

Supervision of Corgi and NICEIC inspections

Ensuring all guidelines from governing bodies are met

Ensuring all electrical guidelines are kept updated

General testing and inspecting of all systems

Qualifications & Training

16th Edition qualified

ONC Electrical engineering

JIB Qualified Technician

Health & Safety Training

Emergency Lighting & Fire Alarm Design

Nokia Licence Holder

C/G traffic Management

Roof Top Awareness

First Aider

Various royal Navy Qualifications

Personal Details

06th October 1954

Date of Birth:

Marital Status: Married

Full clean driving licence – Own transport



Contact this candidate