Post Job Free

Resume

Sign in

Quality Control Project

Location:
New Orleans, LA
Salary:
80k
Posted:
February 26, 2013

Contact this candidate

Resume:

Summary

[Field Supt] with [**+] years’ experience. Extensive background in [Concrete

Plant Management, Concrete Paving, Structural Concrete, Bridge and Pile

Driving operations and Form Systems].

Skills

● Proven ability to manage and schedule

large crews

● Extensive experience with all concrete operations

Quality control

Median computer knowledge with Excel, Word and Power Point

OSHA regulatory compliance

Strong mechanical aptitude

Good communication skills

Direct labor crew training

Equipment problem resolution

Familiar with industry safety equipment

Inventory control practices

Project management skills

Supervisory experience

Solid communication skills

Strong interpersonal skills

Strong team player

Work well under pressure

Strong work ethic

Accomplishments

Always meet or exceed owner expectations.

Excellent reputation for performing quality work at or below budget.

Great success managing budgets well over $10 million.

Extensive experience on Design/Build projects.

Excellent safety record.

Great employee and management relations.

Started as an operator and moved into management.

Experience

Kiewit Co 4/1/12 to

9/1/12

Field Supt

$200 (M) Ghent Transport Project (Ghent, Ky.)

Responsibilities included creating work plans, hazard analysis, quality control,

working within budget, scheduling crews /subs, ordering/scheduling materials, tools

and equipment, train and enforce safety policies and overseeing everyday operations

for 20+ crew members and subs in the construction of the Dual Truck Loading

Building including forming, installing anchor bolts and embeds, pouring, finishing

and curing the building and equipment foundations, floor slabs and other related

concrete work.

Kiewit Co 2011

to 4/1/12

Field Supt

$1.2 (B) Houston Metro Rail Expansion Project (Houston, TX.)

Responsibilities included creating work plans, hazard analysis, quality control,

working within budget, scheduling crews /subs, ordering/scheduling. Materials, tools

and equipment, train and enforce safety polices and overseeing everyday operations

for 30+ crew members and subs in the construction and relocation of underground

utilities in Downtown and East Houston including traffic control, Permits, Directional

Boring operations, concrete and C-sand encasements, installation of drainage,

communication, telephone, power, control and lighting ducts.

Kiewit Co 2010 to

2011

Field Supt

$2.2 (B) West Closure Project (Bell Chase La.)

Responsibilities included creating work plans, hazard analysis, quality control,

scheduling crews /subs, ordering/scheduling materials, tools and equipment, train and

enforce safety polices and overseeing everyday operations for 30+ crew members and

subs in the construction of the 5000 yard + foundation sections, 20-30 foot high wall

sections and driving Pipe pile, H pile and Sheet pile for 80% of the project.

Kiewit Co

Field Supt 2009 to

2010

$600 (M) Inter County Connector Project (Laurel, Md.)

Responsibilities included creating work plans, hazard analysis’s, quality control,

scheduling crews/subs, ordering scheduling materials, tools equipment, train and

enforce safety polices, and overseeing everyday operations of 30 + crew members

in constructing Environmental Protection Devices, temporary and permanent

storm sewer, installation of precast and cast in place manholes, head walls and

concrete structures, construct Gabion walls, build permanent catch basins and

wildlife ponds and drainage devices.

Kiewit Co

Field Supt 2008 to

2009

$700 (m) Biloxi Bay Bridge Project (Biloxi, Ms.)

Responsibilities included creating work plans, hazard analysis’s, quality control,

scheduling crews/subs, ordering scheduling materials, tools equipment, train and enforce

safety polices, and overseeing everyday operations of 30 + crew members and subs in

constructing precast seal slabs offshore for concrete pile caps, cast in place 7 miles of

architectural railing including forming, pouring and point and patch, Install finger joints

(bridge expansion devices), expansion sleeves for railing and bridge drainage devices.

Kiewit Co

Field Supt 2007 to

2008

$1.2 (B) 900 Mega Watt CBEC #4 Power Plant (Council Bluffs, Ia.)

Responsibilities included creating work plans, hazard analysis’s, quality control,

scheduling crews/subs, ordering scheduling materials, tools equipment, train and enforce

safety polices, and overseeing everyday operations of 30 + crew members and subs in

constructing all civil work including Fire lines, Storm drains, Electrical duct banks,

Topping slabs inside the buildings, Equipment foundations, Elevated slabs, Stair wells

and Street Paving.

Kiewit Co

Field Supt 2006 to

2007

$200 (m) Tom Landry Expressway (Dallas, Tx.)

Responsibilities included creating work plans, hazard analysis’s, quality control,

scheduling crews/subs, ordering/scheduling materials, tools equipment, train and enforce

safety polices, and overseeing everyday operations of 15 + crew members and subs in

constructing Bridges, MSE Walls, Dual 20 Ft. Precast C-Span drainage structures and

numerous Rip Rap Drainage slabs.

Kiewit Co

Field Supt 2002 to

2006

$2.2 (B) T-Rex Project (Denver Co.)

Responsibilities included creating work plans, hazard analysis’s, quality control,

scheduling crews/subs, ordering scheduling materials, tools equipment, train and enforce

safety policies, and oversee everyday operations of 30 + crew members/subs in

constructing bridges, caisson walls, MSE walls, moment slabs, Precast and Cast in place

coping, Storm sewer pipe, Precast and cast in place manholes, inlets and head walls,

precast and cast in place sound walls.

Kiewit Co.

Batch Plant Supt 1983 to

2002

Several locations in the Midwest (US) and Northern Ontario, Canada

Responsibilities included creating hazard analysis’s, work plans, scheduling crews,

drivers, Equipment, material deliveries, plant maintenance, monitor quality of

incoming and outgoing materials, site set up, plant mobilization, plant set up,

stockpile materials, overseeing everyday operations and production of 50+ crew

members, establish haul routes, monitor and enforce safety policies and attend

coordination meetings to develop schedules. Some of these plants were capable of

producing 600+ cubic yards an hour continuously. (Concrete Plants: Ross 600, Rex

Model S, Liebherr Mobilmix 2.5 and 3.5)

Education and Training

Spalding High

1978

General

Diploma

Spalding, Ne.,

Grand Island Community College 1979

to1980

Business Management

No Degree

Grand Island, Ne.

Training :

Competent Person

Trench and Shoring Safety

Confined Space

Fall Prevention and Protection

Lock Out Tag Out

Rigging Training

CPR and First Aid

Form Systems (Efco, Simons, Doka, Meva, Patent, etc.

Keywords

Structures Superintendent, Concrete Superintendent, Batch Plant Superintendent

Quality Control Manager



Contact this candidate