Summary
[Field Supt] with [**+] years’ experience. Extensive background in [Concrete
Plant Management, Concrete Paving, Structural Concrete, Bridge and Pile
Driving operations and Form Systems].
Skills
● Proven ability to manage and schedule
large crews
● Extensive experience with all concrete operations
Quality control
●
Median computer knowledge with Excel, Word and Power Point
●
OSHA regulatory compliance
●
Strong mechanical aptitude
●
Good communication skills
●
Direct labor crew training
●
Equipment problem resolution
●
Familiar with industry safety equipment
●
Inventory control practices
●
Project management skills
●
Supervisory experience
●
Solid communication skills
●
Strong interpersonal skills
●
Strong team player
●
Work well under pressure
●
Strong work ethic
●
Accomplishments
Always meet or exceed owner expectations.
●
Excellent reputation for performing quality work at or below budget.
●
Great success managing budgets well over $10 million.
●
Extensive experience on Design/Build projects.
●
Excellent safety record.
●
Great employee and management relations.
●
Started as an operator and moved into management.
●
Experience
Kiewit Co 4/1/12 to
9/1/12
Field Supt
$200 (M) Ghent Transport Project (Ghent, Ky.)
Responsibilities included creating work plans, hazard analysis, quality control,
working within budget, scheduling crews /subs, ordering/scheduling materials, tools
and equipment, train and enforce safety policies and overseeing everyday operations
for 20+ crew members and subs in the construction of the Dual Truck Loading
Building including forming, installing anchor bolts and embeds, pouring, finishing
and curing the building and equipment foundations, floor slabs and other related
concrete work.
Kiewit Co 2011
to 4/1/12
Field Supt
$1.2 (B) Houston Metro Rail Expansion Project (Houston, TX.)
Responsibilities included creating work plans, hazard analysis, quality control,
working within budget, scheduling crews /subs, ordering/scheduling. Materials, tools
and equipment, train and enforce safety polices and overseeing everyday operations
for 30+ crew members and subs in the construction and relocation of underground
utilities in Downtown and East Houston including traffic control, Permits, Directional
Boring operations, concrete and C-sand encasements, installation of drainage,
communication, telephone, power, control and lighting ducts.
Kiewit Co 2010 to
2011
Field Supt
$2.2 (B) West Closure Project (Bell Chase La.)
Responsibilities included creating work plans, hazard analysis, quality control,
scheduling crews /subs, ordering/scheduling materials, tools and equipment, train and
enforce safety polices and overseeing everyday operations for 30+ crew members and
subs in the construction of the 5000 yard + foundation sections, 20-30 foot high wall
sections and driving Pipe pile, H pile and Sheet pile for 80% of the project.
Kiewit Co
Field Supt 2009 to
2010
$600 (M) Inter County Connector Project (Laurel, Md.)
Responsibilities included creating work plans, hazard analysis’s, quality control,
scheduling crews/subs, ordering scheduling materials, tools equipment, train and
enforce safety polices, and overseeing everyday operations of 30 + crew members
in constructing Environmental Protection Devices, temporary and permanent
storm sewer, installation of precast and cast in place manholes, head walls and
concrete structures, construct Gabion walls, build permanent catch basins and
wildlife ponds and drainage devices.
Kiewit Co
Field Supt 2008 to
2009
$700 (m) Biloxi Bay Bridge Project (Biloxi, Ms.)
Responsibilities included creating work plans, hazard analysis’s, quality control,
scheduling crews/subs, ordering scheduling materials, tools equipment, train and enforce
safety polices, and overseeing everyday operations of 30 + crew members and subs in
constructing precast seal slabs offshore for concrete pile caps, cast in place 7 miles of
architectural railing including forming, pouring and point and patch, Install finger joints
(bridge expansion devices), expansion sleeves for railing and bridge drainage devices.
Kiewit Co
Field Supt 2007 to
2008
$1.2 (B) 900 Mega Watt CBEC #4 Power Plant (Council Bluffs, Ia.)
Responsibilities included creating work plans, hazard analysis’s, quality control,
scheduling crews/subs, ordering scheduling materials, tools equipment, train and enforce
safety polices, and overseeing everyday operations of 30 + crew members and subs in
constructing all civil work including Fire lines, Storm drains, Electrical duct banks,
Topping slabs inside the buildings, Equipment foundations, Elevated slabs, Stair wells
and Street Paving.
Kiewit Co
Field Supt 2006 to
2007
$200 (m) Tom Landry Expressway (Dallas, Tx.)
Responsibilities included creating work plans, hazard analysis’s, quality control,
scheduling crews/subs, ordering/scheduling materials, tools equipment, train and enforce
safety polices, and overseeing everyday operations of 15 + crew members and subs in
constructing Bridges, MSE Walls, Dual 20 Ft. Precast C-Span drainage structures and
numerous Rip Rap Drainage slabs.
Kiewit Co
Field Supt 2002 to
2006
$2.2 (B) T-Rex Project (Denver Co.)
Responsibilities included creating work plans, hazard analysis’s, quality control,
scheduling crews/subs, ordering scheduling materials, tools equipment, train and enforce
safety policies, and oversee everyday operations of 30 + crew members/subs in
constructing bridges, caisson walls, MSE walls, moment slabs, Precast and Cast in place
coping, Storm sewer pipe, Precast and cast in place manholes, inlets and head walls,
precast and cast in place sound walls.
Kiewit Co.
Batch Plant Supt 1983 to
2002
Several locations in the Midwest (US) and Northern Ontario, Canada
Responsibilities included creating hazard analysis’s, work plans, scheduling crews,
drivers, Equipment, material deliveries, plant maintenance, monitor quality of
incoming and outgoing materials, site set up, plant mobilization, plant set up,
stockpile materials, overseeing everyday operations and production of 50+ crew
members, establish haul routes, monitor and enforce safety policies and attend
coordination meetings to develop schedules. Some of these plants were capable of
producing 600+ cubic yards an hour continuously. (Concrete Plants: Ross 600, Rex
Model S, Liebherr Mobilmix 2.5 and 3.5)
Education and Training
Spalding High
1978
General
Diploma
Spalding, Ne.,
Grand Island Community College 1979
to1980
Business Management
No Degree
Grand Island, Ne.
Training :
Competent Person
Trench and Shoring Safety
Confined Space
Fall Prevention and Protection
Lock Out Tag Out
Rigging Training
CPR and First Aid
Form Systems (Efco, Simons, Doka, Meva, Patent, etc.
Keywords
Structures Superintendent, Concrete Superintendent, Batch Plant Superintendent
Quality Control Manager