NAME Leon Zhou (Liang)

EDUCATION Bachelor in Heating Ventilating and Air Conditioning

Engineering

CONTACT INFORMATION China Textile University, Shanghai China

aboi0o@r.postjobfree.com

Cell Phone: 215-***-****, Work Phone: 610-***-****

QUALIFICATION Professional Engineer (Mechanical HVAC) Registered in

Delaware Association of Professional Engineers of USA

LEED Accredited Professional

Registered Utility Engineer of People's Republic of

China

SUMMARY OF Accumulate more than 20-years rich project experience.

EXPERIENCE Familiar with ASHRAE, NFPA and Chinese local GB codes

and specifications and has plenty of experience in

SKILLS cleanroom design and general HVAC system and utility

system

Familiar with Microsoft Excel for calculation, Word.

Familiar with AutoCAD and Bentley Microstation

jacobs SHANGHAI PROJECTS CO. LTD

March. 2012-present Project: Secret Pharmaceutical client Suzhou Cartridge

Filling Project

Title: Mechanical Lead Engineer

Duties CDR, BOD and Detail Design for a new Insulin

Filling Line Bldg in Suzhou Industrial Park,

China.

The work includes the design of GMP cleanroom

with cleanliness class A, B, C and D, Central

Utility Building, and other miscellaneous

structures.

Dedicated design effort has an emphasis on the

mechanical HVAC and utility system meeting GMP

regulation of SFDA and Chinese GB code.

Project: Take in charge of clean room, HVAC work and

utility work including chiller and hot water

generation station.

Manage, coordinate and review the detail

design work.

Lubrizol Zhuhai Laboratory

Mechanical Lead

CDR, BOD and Detail Design for a new chemical

laboratory of Lubrizol in Zhuhai, China.

The work includes the design of laboratory

HVAC system.

Dedicated design effort has an emphasis on the

mechanical HVAC and utility system meeting

client requirement and Chinese GB code.

Take in charge of laboratory HVAC work and

utility work including chiller and hot water

generation station.

Manage, coordinate and review the detail

design work

jacobs ENGINEERING GROUP CONSHOHOCKEN OFFICE

February 2011-March Project: Power Integrations Office and Lab Relocation

2012 New Jersey USA

Title: HVAC Lead Engineer

Duties: BOD and Detail Design for a new Wafer fab for

the Intelligent Switch retrofitted in an

existing warehouse in New Jersey, USA.

The work includes the design of Fab, Central

Utility Platform, and other miscellaneous

structures.

Dedicated design effort has an emphasis on

cost savings and plant manufacturing and

facility efficiency.

Take in charge of clean room, HVAC work and

utility work including the chiller and boiler

station.

Manage and review the detail design work.

Coordinate with internal team and Communicate

with client.

The major cleanliness classes of the clean

room are 100, 10k@0.5um.

The total clean room size is about 5000ft2

Project: Genzyme Allstone Landing Existing System

Tracking Boston Massachusetts USA

Duties: Existing Utility system valves and instrument

tag site recording work including chilled

water system, condenser water system, hot

water system and steam system.

Project: Merk Primaxin Project USA

Duties: PIMS entries per individual HVAC and Utility

system including air handling units, Exhaust

fans, Constant air volume valves, Variable air

volume valves, Reheating coils, HEPA filters,

Bag-in-bag-out filters.

CH2M HILL Constructors (Shanghai) Co., Ltd.

January 2005- Dec. Title: Senior Mechanical HVAC and Utility Engineer

2010

Duties: Take in charge of Mechanical HVAC and Utility

Basis of Design and Preliminary design. Review

the detail drawing made by local design

institute.

Prepare SOW (Scope of Work), write

specification for mechanical equipment and

package.

Perform technical evaluation of bidding

document from contractor and vendor.

Clarify the RFI (Request for Information) and

designate the SI (Site Information) during

construction.

Project: DSM Zhang Jiang Campus

Title: Lead HVAC engineer and Design manager

Duties: Coordinate the design work by engineers.

The Engineering work includes the conceptual

design of M&E system for the new engineering

plastic and resin LAB area retrofitted in the

existing standard building.

The HVAC and utility system for the LAB area

includes ventilation hood exhaust, environment

general exhaust, lab area pressurization

control, make up air treatment, heat recovery

from the exhaust, chilled water system and

retrofitted chiller station, hot water system

and retrofitted heat exchanger station.

The total size of the lab area is about 2700

m2.

Project: Evergreen Wafer Fab project-Wuhan

Title: Mechanical lead engineer

Duties: Industrial Engineering, Programming, Design

and Services during Construction for a new

Wafer Fab for Photovoltaic battery in Wuhan,

China.

This plant will be part of a larger complex of

facilities dedicated to producing PV battery

products.

The work includes the design of Site work,

Fab, Support Buildings, Central Utility Plant,

and other miscellaneous structures.

Dedicated design effort has an emphasis on

cost savings and plant manufacturing and

facility efficiency.

Take in charge of clean room, HVAC work,

utility work including chiller, boiler

station.

Manage and review the work of subcontractor.

Coordinate with internal team and

subcontractor.

The major cleanliness classes of the clean

room are 10k, 100k@0.3um.

The total clean room size is about 20,000ft2.

Project: Wuhan Tian Ma project-Wuhan

Title: Mechanical lead engineer

Duties: Industrial Engineering, Programming, Design

and Service during Construction for a new

Generation 4.5 FPD Liquid Crystal Display

Factory in Wuhan, China.

The work includes the design of Site work,

Fab, Support Buildings, Central Utility Plant,

Waste Water Treatment Plant, and other

miscellaneous structures.

Dedicated design effort has an emphasis on

cost savings and plant manufacturing and

facility efficiency. Take in charge of clean

room, HVAC work.

Manage and review the work of subcontractor.

Coordinate with internal team and

subcontractor.

The major cleanliness classes of the clean

room are 10, 100, 1k, 10k@0.3um and 1k, 10k

and 100k @0.5um.

The total clean room size is about 500,000ft2.

Also take in charge of service during

construction work of HVAC and utility

discipline on the site of Wuhan Tian Ma

project during the service during construction

period (SDC).

Project: Base of Design (BOD) for Applied Material 1

Giga Watt Thin Film PV (Photovoltaic) Project

Title: Mechanical HVAC and Utility Leader

Duties: There are 3 manufacture buildings in this

project.

The production capacity of each manufacture

building is 333MW per year and each building

area is about more than 800,000ft2.

There are 10,000@0.5um cleanliness class clean

room and huge utility system in this project.

The mechanical HVAC and Utility work include

utility matrix analyze, making the load

calculation, major HVAC and utility equipment

(AHU, MAU, process exhaust fan, chiller,

boiler) selection, Process Flow Diagram (PFD),

Equipment layout, ducts and piping layout and

section.

And the work also includes weekly design

meeting with client of Applied Material and

team members.

Project: Qingdao Tenaris Steel Pipe Co. Ltd.

Duties: There is a retrofit design and construction

work for the office area (2000 m2) of Tenaris

project.

Take in charge of the design coordination work

including CSA, HVAC, utility, plumbing and

fire protection, electrical, LSS and I&C

disciplines.

Project: Caterpillar China Machinery Component Co. Ltd,

EPCM Project,

Hydraulic Pumps and Motors project

Operator Station Facility (OSF) project.

Duties: The manufacture area of the OSF project is

about 32000 m2. General ventilation and air

conditioning system is required in the

manufacture area.

The LEED silver certification also is required

by the client.

Project: Century Display project, Shenzhen, China,

Duties: Industrial Engineering, Programming, Design

and Service during Construction for a new

Generation 5 FPD Liquid Crystal Display

Factory in Shenzhen, China.

This plant will be part of a larger complex of

facilities dedicated to producing complete FPD

products.

The major clean area is about more than

70,000m2 which cleanliness class includes 10,

100, 1000 and 10000@0.3 um. And also it

includes the design of Site work, Fab, Support

Buildings, Central Utility Plant, Waste Water

Treatment Plant, and other miscellaneous

structures.

Dedicated design effort has an emphasis on

cost savings and plant manufacturing and

facility efficiency.

Project: Naxin Real Estate Development, Changzhou,

Jiangsu Province, China,

Duties: Design and services during construction (SDC)

for an 8 inch Wafer Fab.

Programming, master planning, conceptual,

preliminary, and detailed design for a green

field Fab at the Changzhou Hi-Tech Industrial

Park, including SDC during the construction

phase.

Scope involves a multi-discipline effort for

the design of a 1,000,000 ft2 factory with an

115,000 ft2 cleanroom.

Project includes a Fab, support building,

central plant, chemical warehouse, office and

cafeteria, and several ancillary facilities

including a bulk gas plant and site

substation.

SHANGHAI ELECTRONIC ENGINEERING DESIGN & RESEARCH INSTITUTE

April 1995 - Dec Title: HVAC Engineer

2004

Duties: Engaged in the design and construction of the

buildings for electronic and civil use,

several projects had been designed and

constructed by him ever since.

Have a lot of experiences in clean room HVAC

system design.

Several articles were published on the

professional magazine.

SHANGHAI CHEMICAL FIBER DESIGN INSTITUTE

Sept 1991 - March Title: Associated HVAC Engineer

1995

Duties: Take in charge of the Design of HVAC System

for several Chemical Fiber Factories.