Thomas Lipinski
aboh7f@r.postjobfree.com
Cell 678-***-****
Cartersville, GA 30121
VICE PRESIDENT / DIRECTOR / PROJECT MANAGER
CORE COMPETETENCIES:
Ethical Leadership Strategic Alliances
Sales/business development
Safety First Mentality Project management
Estimating
Strategic Market development Mentoring
Scheduling
Revenue growth Code Knowledge/Compliance
Project tracking
Quality Control Project and LOB
financials Construction expertise
SUMMARY OF QUALIFICATIONS :
A grounded, visionary leader with 29 years
in construction and maintenance of power plants including 8
years plus as a line of business leader for two companies .
Construction of 18 power projects, I am well versed in all
project phases including estimating, scheduling, contracts,
staffing, execution, management, start-up, turnover, and
closeout. True hands on management style, can analyze and
correct deficiencies an in-depth working knowledge of most
aspects of a project. Have experience with
companies such as Fluor, Parsons Power,
CNF Constructors, Aalborg Industries and others. Site
positions include: Project Manager, Construction Manager,
General Foreman, Foreman, Boilermaker/ Welder. Have completed
18 new power projects from 19MW to 1200MW in size with fuel
type to include Coal, Natural Gas, Oil, and Biomass.
Safety and quality have been and remain a
key focus.
PROFESSIONAL EXPERIENCE:
Fagen Inc
South
Boston,VA
Corporate Project Manager
2011-2013
Mr. Lipinski held the position of site
project manager for a 50MW biomass powered EPC power project.
He oversaw all portions of the project from driving of piles
and site work up to plant commissioning.
PIC Group, Inc.
Marietta, GA
Vice President, Installation Services/ VP Mechanical Services
2006 - 2011
Mr. Lipinski oversees all aspects of the installation services
division. He has complete P & L responsibility. Mr.
Lipinski started with PIC as Mechanical services VP. This
line of business grew from 8 M to 22M during his leadership.
While managing this line of business, Mr. Lipinski created a
new installation LOB which became another 25+ M line of
business. PIC is currently on the 4th new power project.
All completed projects have been successful. PIC currently
is operating at a .91 RIR. All projects met or exceeded
financial expectations and were completed on or before
schedule completion. Management included up to 700 employees
and yearly man hours in excess of 1,000,000 hours.
Siemens Fossil
Orlando, FL
Site Manager ( PIC Energy Services)
2006 - 2006
Unit 3 and 4 repower project- Tula, Hildago Mexico
Mr. Lipinski managed overall site for Tula units 3 and 4 located in
Tula, MX. Project had in excess of 800 people assigned.
Fluor Construction, Inc.
Apex, NV
Construction Manager
2004 - 2005 .
Mr. Lipinski was Construction Manager for the greenfield erection of
a 1200 MW combined cycle power plant. 4X2 configuration with
7FA's with 2 Aalborg HRSG's.
Certified Power Systems
Sandwich, MA
Senior Project Manager
2004 - 2004
Mr. Lipinski managed multiple projects on
the east coast. Projects included self perform work and
management of subcontractors found in the power plants. He
was involved in projects from the bidding stages through
completion and customer turnover. He was directly involved
with approximately 120,000 self perform man-hours in 2004.
Fluor Constructors
New Florence,
PA
Consortium Construction Manager
2002 - 2003
Seward Repowering Project - 521 MW Dual Unit CFB, New Florence, PA
This project was performed as a partnering arrangement between Duke
Fluor Daniels and Alstom. Mr. Lipinski's major focus was to
provide coordination between the two partners inclusive of
scope, scheduling interfaces and subcontractor oversight. He
arrived on site upon 40% completion. He remained on site
thru turnover of all substantial systems to commissioning.
Overall project cost $700M
Fluor Constructors
Masontown, PA
Construction Manager
2002 - 2002
Fayette Energy Facility 600 MW Gas Fired
Power Plant, Masontown, PA
Upon substantial construction completion of the HRSGs, Mr. Lipinski
joined FCI's team to the project completion. Major focus
included piping completion and plant systems turnover to
commissioning. This project attained commercial operation in
late May - early June 2003. Project cost $400M
Aalborg Industries
Masontown,
PA
Construction Manager
2001 - 2002
Fayette Energy Facility 600 MW Gas Fired Power Plant, Masontown, PA
Ground up construction of 2 x Aalborg design HRSGs -overall project
cost $400M
Murray Energy Facility 1350 MW Gas Fired Power Plant, Dalton, GA
From the foundation to start-up, Mr. Lipinski served as Technical
Advisor for the erection of 4 x Aalborg design HRSGs.
Overall project cost $600M
Highlander Energy Products
Kane, PA
Industrial Division Manager
1997 - 2001
Mr. Lipinski oversaw the industrial division. Work scope included
contracts, estimating, scheduling, construction, safety,
quality control, and customer relations for all capital and
maintenance projects located at refineries, paper mills,
power plants, and manufacturing facilities primarily in the
eastern United States and Caribbean. Project size was $4
million. He was responsible for corporate expansion of
almost two fold (threefold for his division). Some of the
projects included "turnkey" installations that included all
phases of construction, project conception, and feasibility
budgeting through the start-up phases. He was directly
responsible for about 200,000 man-hours a year. Sample
projects included all high energy piping and BOP piping at
the Penulas Power Project (550 MW) located in Puerto Rico,
and a wet end rebuild of #2PM International Paper located in
Erie, Pennsylvania (35,000 man-hours in seven weeks - project
completed on line six hours early).
Parsons Power
Reading, PA
Construction Superintendent
1996 - 1992
Mr. Lipinski's duties included oversight for the
owner (Penelec), contractor coordination, schedules, and cost
tracking for the following projects:
Keystone Generating Station Twin 850 MW Coal Fired Power Plant
Mr. Lipinski performed in-service inspection and repair of high-
pressure steam and feed water systems. Project worth $400,000
Conemaugh Generating Station Twin 850 MW Coal Fired Power Plant
Mr. Lipinski completed Chevron roof replacement for a Buell
precipitation inlet duct. Project worth $2.5M
Homer City Generation Station
Mr. Lipinski designed through completion of a new coal handling
structure. Project worth $350,000
Project Superintendent
Westinghouse Co-Generation Plant,
Sayerville, NJ
165 MW Gas Fired Power Plant - Project worth $300,000
Multiple unit outage involving economizer tube replacement and BOP
piping repairs.
Westinghouse Co-Generation Plant, Bellingham, MA
300 MW Gas Fired Power Plant
Responsibilities included entire mechanical outage on multiple units
and balance of plant piping and equipment. Project worth
$1 million.
Norwalk Generating Station, Norwalk, CT 250 MW Coal Fired Power
Plant (ABB Design)
Mr. Lipinski was responsible for the installation of the urea
injection system on units 1&2, which enabled them to meet
Clean Air Act of 1995. His responsibilities included both
electrical and mechanical labor packages. Project worth $1M
+ material/labor.
Parsons Power (formerly Gilbert-
Commonwealth) Reading, PA
Construction Superintendent
Mr. Lipinski's duties included oversight for the owner (Penelec),
contractor coordination, schedules, and cost tracking for the
following projects
Keystone Generating Station, 850 MW Coal Fired Plant
Partial lower slope replacement. Project worth $2.5M+
Conemaugh Generating Station, 850 MW Coal Fired Plant
Mr. Lipinski performed in-service inspection and repair of high-
pressure steam and feed water systems. Project worth
exceeded $1M.
Keystone Generating Station, 850 MW Coal Fired Plant
Mr. Lipinski performed installation of boiler controls retrofit. His
direct responsibilities included the mechanical portion of
this project. Project worth exceeded $7M.
Conemaugh Generating Station, 850 MW Coal Fired Plant
Mr. Lipinski performed in-service inspection and repair of high-
pressure steam and feed water systems. Project worth
exceeded $1M.
Keystone Generating Station, 850 MW Coal Fired Plant
Mr. Lipinski performed installation of the low nox retrofit (ABB
Design). This project involved 150,000 man-hours of work
performed in a 13-week time frame. Total for outage exceeded
350,000 man-hours. Project worth $15M.
Homer City Generating Station, 650 MW Coal Fired Plant
Mr. Lipinski performed in-service inspection and repair of high-
pressure steam and feed water systems. Labor and materials
exceeded $1M.
BE & K
Lockhaven, PA
Foreman
Hammermill, Lockhaven, PA
Mr. Lipinski was responsible for the installation of process and
steam piping for the recycle fiber plant d-inking process.
Work involved supervision of 25 craft personnel, and the
installation of 15,000 LF large bore pipe and 6,000 LF of
small bore pipe. Project worth $50M
Southern Industrials
Johnsonburg, PA
Piping General Foreman
Williamatte Paper 750M plant expansion
Johnsenburgh,PA
Mr. Lipinski's direct responsibilities included approximately 40,000
LF of large and small bore piping on a 90 MW Black Liquor
Tampella design power boiler, two B&W coal power boilers to a
Siemens turbine, piping for black liquor evaporator, and all
cooling tower pipe. He supervised 125 men on this $750M
project.
CNF Constructors
Albany, NY
Construction Superintendent
1989 - 1992
Fort Orange Cogeneration Plant, Albany, NY
New construction of a 65 MW Del-TAK natural gas fired cogeneration
plant.
Mr. Lipinski duties included pipe take-offs, man hour estimates,
assembly of HRSG, fabrication and erection of all process and
steam piping, supervision of up to 35 men, and start-up of
the boiler. Mechanical construction was finished two months
ahead of schedule on this $50M project.
Ryegate Generating Station, Ryegate, VT
New construction of a 19 MW, Riley designed wood fired power plant.
Mr. Lipinski was directly responsible for the boiler erection
of this $45M project.
Fitchburg Generating Station, Fitchburg, MA
Erection of a 19 MW Riley designed wood fired power plant. Mr.
Lipinski was directly responsible for the boiler erection,
bottom ash handling, truck dumps, and final punch out of
baghouse on this $45M project.
Pyro Power
Supervisor
Mr. Lipinski managed shutdowns in various states for this company.
His duties included pre-outage preparations, the arrangement
of proper tools on site, manpower, stock, scheduling,
estimating all phases of these projects, maintenance of
equipment, and completion of documentation for shutdowns.
His assignments included outages at Kerr McGee 95 MW coal
fired unit in Torona, California, 2 x 42 MW coal fired units
in Rumford, Maine and a Southeast Paper 40 MW cogeneration
plant in Dublin, Georgia.
McBurney Corp.
Boilermaker
Cambria Cogeneration Plant, Ebensburg, PA
Start to finish erection of 2 x 45 MW coal fired fluidized bed power
boilers.
Process Mechanical
Rumford,
ME
Supervisor
1988 - 1989
Erection of 2 x 42 MW coal fired boilers. Mr. Lipinski's duties
included installation of both generating banks and high
pressure piping for the Pyro-Power boilers.
Independent Contractor
Mr. Lipinski specialized in commercial and residential properties in
Massachusetts. He maintained several jobs simultaneously,
employing an average of 25 craft.
Kellogg Rust Construction
North Andover, MA
General Foreman
1984 - 1986
Signal Resco 40MW North Andover, MA
Mr. Lipinski began as a Journeyman Welder/Fitter and was promoted to
General Foreman on this 40 MW trash burner. He was
responsible for over 100 men (including six foremen),
scheduling and estimating work, and purchasing tools and
equipment on this $103M project.
Independent Contractor
Residential building in northeastern Massachusetts.
Oakland Industry
Fabricator/Welder
1981 - 1983
Mr. Lipinski was involved in all phases of job fabrication, machine
shop tooling, pipe fitting, blueprint reading, man-hour
estimating, and fabrication set ups.
Independent Contractor
Residential building subcontractor in northeastern Massachusetts.
EDUCATION: Wescorp Welding Institute, Andover, MA; 400 hour welding course
in 1978
TRAINING/CAPABILITY
OSHA 30 hour Training Certified
MSHA Surface Coal Mine Training Certified (PA)
Well versed in ASME welding codes section 1, IX. B-31-1,3
Set up Highlander Energy quality program, WPS, PQR's, joint committee
reviews
Successfully attained ASME stamps R,S,U
Working knowledge of API codes
Successfully attained/maintained DEP tank program
Familiar with most forms of NDE
OSHA 30 hour course
Experience with union and non union sites throughout the US,
Caribbean, and Mexico
Microsoft Excel, Word, Project, PowerPoint, Visio
Accident Investigation Training (Penelec)
Asbestos, Arsenic Training (Penelec)
Primavera P-6 trained
Primavera Contract Manager trained