S tanley T. P u r t le
**** ***** **. *** **********, Ca 92404
abogrv@r.postjobfree.com
Phone 909-***-****- Cell 909-***-****
P roject M anager / Superintendent
Construction Project Manager, Construction site Manager, Project Superintendent
of Multimillion dollar Project: Estimating, Quality control, Cost control, Scheduling,
Safety Programs, Safety Program Evaluation, Budget up 10 million Dollars, Project
Change orders, Building Permits, Subcontractor contact and Building Dept.
I nspection
QUAL I F I ICAT IO NS
10 Years as residential Project Superintendent. 25 Years in a commercial project
M anager and or Project Superintendent. Civil site work, Public U ti lity, Public
S treet Work, Tilt Wall building, Retail strip Mall, Ground Up Construction, Power
Substation. Working under tight schedule and limited budget. I work well with MS
office, MS Project, Visio, and Timberline. I working Knowledge of Auto cad. OSHA
10, 30, First Aid/CPR, Hazwoper, Confined space entry, LEED. Preparing project
budget up to 10 million dollars. All project Documents and Schedules. Ensuring
compliance to all Federal, State, City Building Code and Regulations.
Employment H istory
8/2012 to Present M oorefield Construction I nc. 600 N. Tustin Ave. Tustin, CA
92705
Contact: Bernard Furlow (P.M.) 714-***-****
P roject Superintendent: for JCP remodel at Manteca, CA. Project had to waves
1and2 Completed will not Restart In tel 2/2013.
6/11 to 7/12 M & A I ndustr ial Concrete I nc. 15765 Santa Ana Ave. Fontana,
CA 92337
Contact: Jesse Diaz (owner) 909-***-****
P roject M anager/Estimator: T ilt Wall Concrete Construction, Catalina Street
Housing, Downey Gateway, Third and Fairfax, Pacific Point and Tree Top. Project
B udget 2k To 10 Mi llion
9/09 to 4/10 C ar r iera I ndustrial Construction I nc. 15 Hammond Suite 303 I rvine CA.
92618
Contact: Fred Carriera (owner) 949-***-****
P roject M anage/Site Superintendent: Sothern California Edison Peker Plant
M aintains Offices in Mi ra Loma, Rancho Cucamonga, Stanton and Downey CA.
P roject Budget Of 4.5 M illion Each
5/08 to 6/09 Woodburn Construction I nc. 653 Glatt Rd. Woodburn OR. 97071
Contact: Mickey Bearded (PM) 503-***-****
P roject Manager/Estimator: M anage all phases of Commercial Ground up and
Retail TI Project Pet mart, Staples and Highland Square Project Budget From 2k to
7 m illion
5/00 to 5/08 B abcock Construction I nc. 8780 19th S treet Alto Loma, Ca 91701
Contact: Pete Babcock (owner) 909-***-****
P roject Manager/General Superintendent: P rovided Project Supervision on a
w ide range of commercial Construction Project including Demolition, Ground up
and Retail TI. Ontario Center Ice Area, Superior Grocery Warehouse, Nordstrom,
Target, Home depot, Robertson May TI, Almont Manufacturing Warehouse, Ontario
Town Center, Westfield Corp. Office 14th and 15 f loors TI, Westfield Mall Santa
A nita TI. Three Mountain view Tire Center and Kmart TI and Serria lake Golf
Corse and Clubhouse and Parking Structure. Project Budget form 2k to 10 million
8/97 to 2/00 W ize Builder I nc. 7645 Lyndale Ave. south Minneapolis, MN 55432
Contact: Joe Wize (CEO) 612-***-****
P roject Superintendent: G round up Candlewood suite Hotel in Two Houston,
One Dallas, One Austin, Texas Project Budget from 4.5 to 7 million
5/95 to 8/97 A DA Construction I nc. 16602 N.23Rd Ave #101. Phoenix, AZ 85023
Contact: (602) ?
P roject Superintendent : Red Roof Inn, Candlewood Suite, Two Apartment
complex AZ and N M. Project Budget from 5million to 25million .
6/88 to 9/95 A merican Constructions I nc. 7620 Hartman Lane, suite 122
T ucson, AZ 85743
Contact: Brand Eigan (520) 297-440
General Superintendent/Project Superintendent: 21 Pizza Hut TI in
CA,AZ,OR and WA. Holiday Inn Express, Comfort Inn, MacDonald’s TI and 250
residential Homes in Tucson, AZ . Project Budget From 2k to 5 million
3/78 to 5/88 M a rlborough Homes
Contact: Sold out to Bramley Homes in 1989
Asst, Superintendent /Superintendent: 500 residential Home th ru Out Sothern
California
E ducation & Certification
Alto Loma H igh Rancho Cucamonga, Ca 91701 Graduated in 1973
Chaffey Collage Rancho Cucamonga, Ca 91701 two Years no
OSHA 10, 30 CPR HAZWOPER LEED Confined Space Entries First Aid
List of References
Pete Babcock 909-***-**** Dave Ma r tin 951-***-****
F red Ca r r iera 714-***-**** Bob Per ry 951-***-****
Kevin Choroomie 818-***-**** Jesse Diaz 909-***-****
Grant Garifius 909-***-**** Steve H acket (909)