MANOJ KUMAR S D
**, ****** ********, ********, **- N2L 5E5, CANADA
abofeq@r.postjobfree.com http://www.linkedin.com/in/manojkumarsd
EDUCATION
Master of Management Sciences, Faculty of Engineering Sep. 2011 – Aug. 2012
University of Waterloo CANADA
Specializing in Operations Research, Supply Chain, Production & Inventory Management, Statistical Data Analysis
Bachelor of Engineering in Production Engineering Aug. 2007 – May 2011
Anna University INDIA
Specializing in Manufacturing Process and Designs, Production Planning, Resource Management, Project Management
PROFESSIONAL WORK EXPERIENCE
Project Lead – University of Waterloo CANADA May 2012 – Oct. 2012
Successfully performed a simulation (Excel VBA & Simul8) on community access bicycle by increasing the maximum usage of
bicycles
Simulated average number of rejected customer per day and average arrivals (or departures) from all nodes per day
Multiple configurations of inventory control policies were simulated and compared
Graduate Project - University of Waterloo CANADA Jan. 2012 – Apr. 2012
Demonstrated linear programming model of aggregation and disaggregation of parts for aggregate and disaggregate
production planning
Incorporated different methods for grouping of parts or items
Presented an interpretation of linear programming aggregation with respect to aggregation of products and inventory;
followed by disaggregation addressed with fixed weight disaggregation and optimal disaggregation
Research Engineer – Anna University INDIA Oct. 2010 – Apr. 2011
Designed (AutoCAD & Pro-E), developed and executed manufacturing and welding methods for phosphor bronze metal
Procured good quality phosphor bronze material and supporting materials by negotiating price with different suppliers
Using Taguchi's DOE (Minitab) approach, practically conducted experiments on mechanical properties of the weld and
performed analysis for robustness of the process parameters
Engineering Intern – Abhi Burnishing tools INDIA Jun. 2010 – Sept. 2010
Successfully implemented 5S methodology for the tools and improved the productivity and work efficiency by reducing wastes
Modified the route sheet by introducing Tool Characteristic Table to identify the profitable product
Enhancement of existing OEE from 74% to 78% by increasing the availability and performance percentage
Lead kaizen in packaging to protect the cutting edge of the tools by avoiding customer complaints
Optimized and improved each worker skills after assessing by grade point evaluation technique
Engineering Intern – Bull Machines Pvt Ltd INDIA May 2010 – Jun. 2010
Significantly reduced the disposal cost through root cause analysis (5 Whys) by saving $2000 per annum
Responsible for weekly updates from the shop floor and reported using “A3”
Good understanding of material requirements planning (MRP) on how to plan and procure material
Graduate Teaching Assistant - University of Waterloo CANADA Jan. 2012 – Aug. 2012
Course 1: Managing New Product and Process; Course 2: Engineering Economics
Provided personal academic support and mentored groups of students
Prepared class notes and other related documents as required for an effective learning environment
COMPUTER SKILLS
Highly proficient with Microsoft Word, PowerPoint, Excel (XL STAT, Macros(Intermediate), Pivot Tables), Visio, Access
Skillful with Math & Scientific tools (LINDO, Minitab 16, Simul8)
Two years of experience in using design softwares (AutoCAD, Pro-E Wildfire 4.0, UniGraphics NX5, Solid Works 2012)
REFERENCES
References available upon request