Post Job Free

Resume

Sign in

Engineer Plant

Location:
Vadodara, GJ, 390022, India
Salary:
USD 8500 Per Month
Posted:
February 20, 2013

Contact this candidate

Resume:

Ashok.L.Patel

**,*******

Nagar,

New VIP Road,

Vadodara.India.

+912*********/+919*********

mail id: aboe7p@r.postjobfree.com

aboe7p@r.postjobfree.com

aboe7p@r.postjobfree.com

Personal Details :

Marital Status : Married

Birth Date : 1st February 1958 Age : 54 Yrs.

Passport No : K 6049981 valid up to: 18/07/2022.

Nationality : Indian

Educational Qualification:

Diploma in Mechanical Engineering (April 1977 With First Class - 64 %) from

M.S.University, Baroda.

Additional Qualification: Boiler Proficiency Engineer.

Experience:

. Total +30 years of experience in the field of construction, pre-

commissioning, commissioning, start up, operation up to PTR(Peformance

Test Run) & maintenance in utility, offsite & process plant activities

in LNG,oil & gas processing plant, petrochemical, chemical plant.

? Having Task supervisor permit license to raise the all type of work

permits in live areas in LNG & GAS Processing facilities.

? Attended construction awareness training and passed its

comprehensive examination.

Construction phase nature of Job:

Inspection of Static / Rotating equipments orientation,

alignment, elevation, Piping, hydro test, piping supports etc.

Pre-commissioning & Commissioning /Operation Phase:

. Preparation of PMC &Commissioning Method Statement procedure like -

Air blowing, Water flushing, Air freeing, N2 purging, chemical

cleaning & loading,steam blowing, Catalyst loading, Lub. oil

flushing, system Dry out, prepare & close out punch list.

. Tie-in work & hook up for commissioning related for the service

system.

. Operation test procedure, System, Subsystem boundary limit, P&ID Mark

up, Test Pack Review, PTW(Permit to work) system, SIMOP & Hazid

activities.

. Monitor, Assisting & witnessing of Pre-commissioning & commissioning

activities.

Nature of Job:

Commissioning, Operation

* Air Compressor Packages:-Reciprocating, Centrifugal & Rotary of Atlas

Copco, Elliot, Demag, Kobelco, Cameron & Chicago make.

* Water Injection & utility facilities

* Refrigeration & Process Compressor Packages: -Reciprocating,

Centrifugal & Rotary of Carrier, York, Frick, Atlas Copco, Kobelco,

Nuevo Pignone & Mycom Make.

* Utility Boiler(HHP) & HRSG Boilers HP&MP Pr. Water tube Gas & Oil

Fired MACCHI, DELTAK,CERRY & Thermax make.(62Bar~15Bar) capacity

from 140 ~ 260T/Hr.

* Gas Turbine Packages of Thomson, GE& Rolls Royce of 30MW,60 MW frame

V & Turbo Expander Mafi Trenchmake.

* Water treatment Packages :- R.O. D.M. Plant, Desalinated & Potable

water of Anderson, Metito, Salcon, Ion exchange & Wipro make.

* Flare System: High Pr, MP, Low Pr, Low-Low Pr & Acid Gas.

* Effluent Treatment Plant of Ion Exchange & Ionics, Salcon UEM Make.

* Tank Farm Terminal Area- Propane, Butane, LNG &Condensate, Chemical

storage Tanks.

OVERSEAS EXPERIENCE

1) YLNG Upstream Gas project CPU II,YEMEN (Safer exploration &

production oil company ) as Process Commissioning Engineer

Production: (420 MMSCFD Capacity) Methane, LPG & C5+

From 03 March 2012 to 04 July 2012 .

Nature of Job: Pre-commissioning, Commissioning& Operation of

Process :

- Dehydration unit, Glycol & Hot oil System, Liquefaction &

Fractionation

( De-ethanizer, Debutanizer &Turbo expander,Regeneration

Gas compressor).

- Export Residue Gas Compressor Gas Turbine driven 25 MW GE Make

Mark V control.

Utilities like :

Instrument air, Utility Air, Water treatment package(RO), Firewater

Deluge system, HP flare(Warm & Cold). Power generation 3 Nos. Gas

Turbine driven 3.8 MW Each of Solar Make.

Pre-commissioning& commissioning activities: Air blowing,

water flushing, Nitrogen leak testing, OTP, Chemical & catalyst

loading, Hot oil & Regeneration Gas Heater, system start up &

Operation of Units.

2) SNAMPROGETTI SpA .Italy (Eni Group) Saipem as

Superintendent Utility Offsite

From 01 Nov.2008 to 30 June 2009

(I) Saudi Aramco (Gas Oil Separation Plant) Khurais site, Saudi Arabia (KUC

Project) Production: Crude Oil & Gas (1264 MBOD & 278 MMSCFD

Capacities)

From 4th November 1998 to 25th February 2001

(II) Asab Gas Plant & Condensate Pipe Line Project ADNOC, Abu

Dhabi, U.A.E.

(III) PETRONAS Gas Berhad, Malaysia, (GPP 5 & 6 Project)

Production: Condensate & Gas (Propane, Butane, Methane, Ethane) 800

MMSCFD

Nature of job: Pre-commissioning, Commissioning & Operation activities in

Utilities, Offsite & process plants.

Additionally:

Preparation of Method statement, System mark up P & ID, tests Pack Review&

PTW (Permit to work System as Approval authority)

Equipment Handle:

?Inst. Air Compressor with Air Dryer Packages of Atlas COPCO, Cameron- USA

- Centrifugal & Screw Compressors 3000 M3/Hr. each capacity of 5 Nos.

?HRSG Boiler & Aux. Boilers Gas Fired Water Tube - 50 Bar, 40 T/hr,100

T/hr& 140 T/hs. capacity of Deltak & Machhi & Cerrey, Italy Make, Run by 28

MW Gas Turbine exhaust.

? Steam Turbine 2 Nos. 6.23 MW & 4.46MW.Capacity run to drive Vapour

Recovery & Make up Gas Compressor of Nuevo Pig none, Italy make

? Gas Turbine packages 5 Nos. 30 MW each of GE makes.

?Nitrogen Air Separation, Membrane type &PSA type with Liquid Storage for

back up of Linde,ISG & Air Product Make 260 M3/Hr. capacity.

?Water Treatment Packages Anderson, Metito.

Filter Packages - Metito, U.A.E Make

R. O. & D.M Plant - Anderson & Metito - 60, 120 & 12 M3/Hr.

capacity

?Fire Water System includes Deluge, Sprinkling & Foam

Fire Water Pumps, Motor & Diesel Engine Driven.900M3/Hr capacity.

?Refrigeration Propane Gas Compressors Centrifugal & Screw Type for Recover

& Cool-down Propane, Butane &Condensate 600TR,900TR & 2600 TR Capacity.

Offsite includes:

? Tank farm terminal Storage tank Propane, Butane &Condensate

? High pressure, Low Pressure, Low Low Pressure & Acid Gas Flare System.

?Waste Water & Sour Water Stripping System of Ionics, Italy Make.

?Heavy Duty Pump Packages: BFW Pumps Steam Turbine Driven, Dresser Rand

Byron & Jackson, Sulzer

? Propane, Butane & Condensate Transfer Pumps Nuovo

Pignone & Byron Jackson Make

3. CHIYODA CORPORATION Ltd. Japan

As PMC supervisor (Commissioning) from 01/09/2007 to

03/04/2008

(I) Qatar LNG Gas Project (QGX II Train 4 & 5)

Raslaffan, QATAR.

(II) CHIYODA FOSTER WHEELER & CO. OMAN LNG Train- 3 QALHAT

project, OMAN.

From 4/12/2004 to 26/11/2005

Production: LNG, Propane, Butane, Ethane.

Nature of job: Pre-commissioning, Commissioning & Operation

activities in Utilities, Offsites & process plants.

Preparation of Method statement, Mark up P & ID, tests Pack Review,

Punch points.

* Inst. Air compressor (centrifugal type) of ELLIOT, USA make

12000M3/hr capacity with DELAIR, USA dryer package.

* Air separation unit of AIR PRODUCT, USA make 1250M3/hr capacity

with N2 storage backup.

* Power generation 2 nos. Gas Turbine Unit 40MW each of GE. NUOVO

PIGNONE, ITALY make.

* Fire Fighting system Ring type, Sprinkling, Foam, Deluge type

fully auto with 2 nos. Emergency diesel pump & motor driven

900M3/hr each capacity.

* Propane & mix refrigeration gas turbine driven 30MW/70MW Gas

compressor packages of NUOVO PIGNONE, ITALY make for

Liquefactions Unit of LNG product.

* Heat transfer fluid (Thermia B Hot oil) unit of 458T/hr flow &

158/212 Deg.C IN/OUT temp. Control heater unit for Fractionation

& AGRU unit. Dehydration unit & Refrigeration Unit.

* AGRU Unit & Dehydration Unit for Removing Acid Gas, Moisture &

Mercury Removal.

* HP/LP Fuel gas system for Gas turbine & heater operation system.

* Sea cooling water system packages include RAKE BAR, Rotary drum

screen & pumps packages 3 nos. of 12500M3/hr each capacity of

EBARA, JAPAN make.

* Flare system: Wet-warm, Dry Gas, Acid Gas, hydrocarbon & drain

flare.

4. JGC Middle East FZE in DOLPHIN ENERGY GAS Project, QATAR

(2100MMSCFD Gas, Propane, Ethane, Condensate) as Shift

Superintendent Utility/Offsite.

(From 20/05/2006 to 10/06/2007)

Nature of Job: Commissioning & Operation of Utility & Offsite.

Additionally: PTW (Permit to work system Approval authority),

SIMOP & Hazid activities.

* Instrument Air Compressors Multistage Centrifugal 3 Nos. of 6720 M3/Hr

each Capacity of KOBELCO make with Air Dryer package of DEL

AIR Make.

* Nitrogen Generation Plant Of Air product, USA with Liq.N2 storage

Back up of 1060 NM3/hr capacity.

* Desalinated & Sea Water System with Chemical Dosing Injection system

.

* DM Water Plant of Salcon Make 200 M3/Hr each capacity of 2 No. Train.

* Tempered Cooling water System of 15000 M3/Hr Capacity for cooling

process/utility equipments.

* HHP (Utility ) Boiler Macchi make 4 Nos. Gas Fired, Water Tube 45

Bar, 223 T/Hr each capacity.

* Steam Turbine unit 3 Nos. for Power Generation of 35 MW each of

Siemens Make.

* 6 Nos. HRSG of EGC turbine exhaust of 40 T/Hr each capacity of Macchi

make.

* 6 Nos. Gas Turbine packages of Rolls Royce 30 MW each to run Export

Gas Compressor.

* 6 Nos. HRSG of EGC turbine exhaust of 40 T/Hr each capacity of Macchi

make.

* Potable Water Package unit of 60 M3/Hr Capacity with Refrigeration

chiller for Drinking Water.

* Fire Water Ring system includes Deluge, Sprinkling, Foam maintain by

3 No Diesel driven pumps of 1370 M3/Hr. each capacity.

Off Site Includes :

HP, MP & LP flare system with drain system, Off Spec, storage

& Other storage Tankages Areas. Waste Water Treatment Area.

Sea water Inlet/Outfall.

5. Canar Trading and Contracting Company, Kuwait (30/04/94 to

15/11/94)

Position: Mechanical Supervisor

Maintenance contract in MEW (Ministry of Electricity and Water)

Nature of job:

( Maintenance in the main line of water, oil, and gas line

( Maintenance of pumps & air compressors (reciprocating & screw)

( Shutdown job done in JULY to August '94 in Petrochemical

Industry Company in Kuwait

( Maintenance of all types of mechanical valves

LOCAL EXPERIENCE

1) CAIIRN ENERGY Ltd, Barmer, Rajasthan, as Consultant Commissioning

for MPT Project.

(Mangala Processing Terminal) From 15 /09 2009 to14/09 2010.

Production: Oil/Gas Exploration.

Nature of Job: Pre-commissioning, Commissioning &

Operation of Utilities like

- 5 Nos. High pr. Dual fired (Gas/Diesel) Thermax Boiler

45 Bar, 115 T/Hr. Each capacity.

-4 Nos. 12 MW Each steam Turbine Generation of Triveni

Engg.make

- Water Treatment Packages like PSF,R.O & DM Plant

Wipro make 68 M3/Hr. Capacity

-10 Nos.BFW, Water Injection & Power Fluid Pump

packages Steam Turbine Driven of Dresser Rand, Elliot & Nuevo

Pignone make.

- Fire water Pump 4 Nos. 900 M3/hr. capacity Diesel

Driven of Mather Platt make.

- HP, LP Flare system.

2) Solaris Biochemical (Bilt Chemicals, THAPAR Group) Baroda

Position: UTILITY Engineer ( 12July-2003 to 21 December-2004).

Product: Citric Acid

Nature of Job: Operation & Maint. Of Utilities High pressure Boiler

3 Nos 50 Bar,40T/hr each Water tube Oil Fired, R.O.Plant, D.M.Water

Plant, Raw water & Fire water System, Instrument & Process Air

Compressors, Steam Turbine driven Turbo Air Compressor & other

equipments.

3) Torrent Gujarat Biotech Ltd., Baroda

(7 March 95 - 31 October '98)

Position: Executive (Utility) (Sr. Engineer)

Nature of job:

Commissioning, operation & maintenance activities of Utilities.

( Process Air centrifugal compressor 3 nos. of 10500 M3/hr

each capacity

( Instrument Reciprocating air compressors 3 nos. 700 M3/hr each

capacity.

. York Refrigeration centrifugal compressors 5 nos. of 700 TR. each

capacity .

( Refrigeration, Screw Comp. of 3 Nos. 200 TR. Frick Co. USA.(-12 c

& -40 c Brine System)

( Water Treatment plant of 200 M3/Hr capacity of Thermax.

( Reverse osmosis plant of 5 M3/Hr capacity of ION Exchange

( Duel fired steam Boiler 3 Nos. of 10 T/ hr capacity Of Thermax

make.

( Effluent Treatment plant 600 m3/day of UEM make

( All types of pumps, blowers, agitators & other equipments

* Procurement & maintain spare parts of the equipments

( Prepare & maintain preventive & shut down maintenance & equipment

history.

4) M/S. Reliance Industries Ltd. [Petrochemical Complex] Hazira, Surat.

Position: Asst. Engineer. (19th April, 1990 to 27th April, 1994)

EC.No.5359

Nature of job: Maintenance & commissioning activities in MEG, CPP, PVC,

VCM & HDPE plant

( Gas turbine packages 2 no's of 30 MW capacity of M/S Thomason

International, Netherlands.

( Air compressor packages like - Elliot, Sulzer & Hitachi Make

Centrifugal Compressor 6000 M3/Hr. capacity.

( Refrigeration compressor packages like -Kirlosker, York & Carrier.

[Reciprocating, centrifugal & screw compressor] 120 TR, 700 TR & 300

TR capacity.

( All types of heat exchangers like shell & tube type, plate type,

Finfan cooler.

( Knowledge of condition monitoring: Vibration & its analysis by

Bentley Nevada.

( All types of valves like

( Motorized & pneumatic gate valve, globe valve, 2 way valve &

rotary valves.

5) M/s. Baroda Rayon Corporation Ltd, Udhana, Surat. [Nylon Division].

Production: Nylon, Polyester filament Yarn.

Position: Asst. Foreman (10th June, 1981 to 18th April, 1990)

Nature of job: Utility operation & maintenance deptt. In Refrigeration

& Air condition plant, Dowtherm oil heater (Hot oil), Nitrogen plant,

Boiler & Polymerization plant Maintenance.

( All types of pumps [with &without mech. seal]

( Refrigeration centrifugal compressor 3 Nos. 600 TR capacity of

Voltas (carrier)

( Refrigeration reciprocating compressor 3 Nos. 120 TR capacity of

Voltas make

( All types of valves, dryers, blowers agitators, heat exchangers

&other equipment

( Inst. Air Compressor 4 nos. 600 M3/HR each capacity of IR make.

6) M/s. Raymon Glues & Chemicals, Borsad Road, Vasad.

Position: Engineer. (1st November, 1979 to 9th June, 1981)

Production: Gelatine, Ocean, Glues, DCP.

Nature of job:

Maintenance of; All types of pumps, Refrigeration & Air compressors,

Boiler, Agitators, Dryers, Centrifuge, Heat Exchangers & Other

equipments in the plant.

7) M/s. Industrial Engineers, Borsad Road Vasad.

(Sister Concern of Raymon Glues & Chemicals Ltd.)

Position: Maintenance Engineer (10th October, 1977 to 31st October,

1979)

Nature of job:Maintenance of;

(All types of pumps

( Refrigeration & Air compressors, Boiler, Agitators, Dryers,

centrifuge, heat

exchangers & other equipments in the plant.

I hope that I would be granted an opportunity to be work in your

organization.

Thanking you.

Yours faithfully,

(A. L. PATEL)



Contact this candidate