Contact:
Praveen Kumar Dhagay Voice : +91-849**-*****
Email: aboclv@r.postjobfree.com
Professional Summary
V More than 16 years of experience in application maintenance, PLM/CAD
Support (L1/L2) & new product implementation for FMGC, chip manufacturer
& aerospace industry.
V Currently working for TATA Consultancy Services as associate consultant
since 11.9 years
V Expertise in using OOTB Team center utilities of FMGC and Chip
manufacturer.
V Worked 9 years for Procter and Gamble project on behalf of TCS in CAD/PLM
for various business units viz., Feminine care, Family care & Baby care.
V Great exposure in supporting diverse and complex engineering application
projects in India, USA, China, Germany & Netherland.
V Project Management experience includes proposal submission, project
initiation, project scope documents, project planning, metrics, work/task
allocation, risk management, quality compliance and delegation, setting
up and reaching delivery targets as per customer standards.
V Significant interaction with vendors, manufacturing and cross-functional
teams in the USA, JAPAN, CHINA, GERMANY, CANADA, NETHERLAND and INDIA
right from the process of Concept design to Product Launch.
V Assessing the customer feedback, evaluating areas of improvements &
providing critical feedback to the associates on improvements and
achieving higher customer satisfaction matrices.
V Leading & monitoring the performance of team members to ensure efficiency
in operations and meeting of individual & group targets.
V Well adaptive towards corporate culture and behavior & ability to work
under pressure.
Education Summary
Degree and Date Institute Major and
Specialization
Bachelor of Sri Venkatswara University Mechanical - CAD/PLM
Engineering - Tirupathi, Andhra
(May 1995) Pradesh, India
Technology Experience
PLM Products Tc 8.3, GDS (P&G PLM tool),
CAD Tools NX 7.5, Solid Edge V20, Pro/Engineer 2000i2,
AutoCAD 2000
Methods TCS project billing and financing cycles
Domain Experience PLM/CAD
Employment Summary
Dates Organization Role
Dec 2000 till date TATA Consultancy Services Project Manager
Limited
Jan 2000 to Nov AIM Infotech Design Engineer
2000
April 1996 to Dec Montage Manufacturers Design Engineer
1999
Experience Profile - Key Projects
ASML IT4E Oct 2011 to till
date
Customer: ASML, Netherland
Project Location: Hyderabad
Description: Teamcenter and NX Production Support (L1 &L2)
Role: Project Manager - Offshore
Responsibilities:
V Maintain the PLM organizational structure within Teamcenter software for
all user accounts, groups, roles and administration.
V Substantial hands on technical experience with Teamcenter foundation,
release management, document management, visualization, UPM and TIBCO
interface.
V Administer Teamcenter work flows.
V Product Structure management (PSE)
V Revision Rules
V L1 & L2 support to Teamcenter business user in solving issues pertaining
to OOTB (Out of the BOX) and ASML customer specific utilities.
V L1 & L2 support for NX business users in solving issues related to
Modeling, Drafting, Sheet metal, assemblies & check mate.
V Leading the team and team leads in supporting Tc PLM tool and NX
Software.
V Proficiency in Multi-site concept
V Supporting business users and ensuring OTD & meeting quality metrics.
V Analyzing and providing Root Cause Analysis of the issues for end users
V Preparation of Test Plans and Test case Documents
V Testing of Tc/ NX (Out of The Box and customizations).
Retail & CPG Vertical, EIS, TCS Feb 2008 to Aug
2011
Customer: Procter & Gamble (Engineering), USA
Project Location: Cincinnati, OH, USA
Description: Project Lead for Design improvements, CAD Documentation and
Managing client PLM (GDS) tool.
Role: Project Manager - Onsite
Responsibilities:
V Requirement gathering, Prototype design and Vendor management
V Managing design and development activities with various teams comprising
of design, suppliers, customers and other key stake holders.
V Design changes through Engineering change management.
V Work independently with P&G qualified suppliers, Global Process
development Facility (Cincinnati), Supplier management, to generate
detailed specifications for design and development.
V Work independently with cross functional teams located at US, Canada,
Japan, China, Germany and India to iteratively plan, analyze, design,
simulate, verify, document and release drawings of components and
assemblies pertaining to various productions lines.
V Owning design activities such as concept generation, design finalization,
release of drawings, ordering parts from suppliers, building of units,
Evaluation/Reliability testing and fixing until the product completes Pre-
pilot phase.
V Single point of Contact (SPOC) for Fem care projects across the plants
V Worked as a SPOC on need basis for other BU's like Family care, Baby care
and Beauty care.
V Participate in Key technical reviews and obtain key stakeholders
approvals.
V Collaborate with multi-site teams and lead design activities such as
> Design coordination using TCS Onsite/offshore teams
> Coordinate design validation activities with model shop and
Global Process Development Facility.
V Optimize Design, Development and Documentation cost across the BU's
V Software's used Solid EDGE V20, Client PLM tool GDS (Global Design
System)
Retail & CPG Vertical, EIS, TCS May 2006 - Jan
2008
Customer: Procter & Gamble (Engineering), USA
Project Location: Hyderabad
Description: Owing designing/documentation projects from various
Geographies and Business units of P&G.
Role: Project Manager - Offshore
Responsibilities:
V Design and Development.
> Establish/maintain plans that describes or reference the design
and development activities and define responsibility for
implementation. Periodically update the plan as the design and
development progresses and get the plan reviewed and approved by
key stakeholders.
V Design Input Management
> Establish/maintain procedures to ensure that the design
requirements relating to TCS deliverables are appropriate and
address the intended use. Implement a mechanism for addressing
incomplete, ambiguous or conflicting requirements. Document and
Review design inputs requirements and get approvals from
designated stakeholders(s)
V Design output Management
> Establish/maintain procedure for defining and documenting design
output in terms that allows an adequate evaluation of
conformance to design input requirements. Ensure that design
output procedures shall contain or make reference to acceptance
criteria and shall ensure that those design outputs that are
essential for the proper functioning of the production lines are
identified. Ensure that the design output shall be documented,
reviewed, and approved before release.
V Design review coordination
> Establish/maintain procedures to ensure that formal documented
reviews of the design results are planned and conducted at
appropriate stages of design and development. Ensure
documentation of review deliverables.
V Design Verification coordination
> Establish/maintain procedures for verifying the product design.
Confirm that the design output meets the design input
requirements. Ensure documentation of the results of the design
verification.
V Design Validation coordination
> Establish/maintain procedures that enable offshore support for
validating the design. Associate with onsite team in carrying
out validation activities. Ensure documentation of the results
of the design validation.
V Design Transfer
> Provide support in implementing customer specific procedures to
correctly translate product design into production
specifications.
Actively participated in Hyderabad Delivery Center's strategic initiatives.
Drive growth in the Product Design Engineering Services Business at TCS
Hyderabad by pursuing leads with Business development Managers. Typical
account management activities include:
> Planning, monitoring and control; Risk management; Quality
Management; Onsite-Offshore co-ordination; Team Management;
Delivery Management' Seek active collaboration from internal
functions/Practices/SME's; People management which included
manpower planning, recruitment, training, resource allocation,
performance appraisal etc; Infrastructure planning activities;
Profit/Loss analysis for projects.
> Team size and composition: 12 associates. Other stakeholders
included SMEs, Centers of Excellence, Quality, Human Resource
and Finance.
> Offered need based support for customer visits and follow up on
next steps
> Software's used Solid EDGE V18, GDS External
.
Retail & CPG Vertical, EIS, TCS Sep 2005 to Apr
2006
Customer: Procter & Gamble (Engineering), China
Project Location: China
Description: Engineering site support for Design, Construction and
Fabrication of Final Knife Module.
Role: Project Lead - Onsite
Responsibilities:
V Work with internal and external customers to determine customer needs
and translate these needs to system /subsystem requirements.
V Work both independently in a self-directed manner and collaboratively
with cross functional teams and project core team (P&G Engineers,
manufacturing, quality, testing etc) to generate design concepts and
prototypes, perform design evaluations and drive execution of product
and process validation plans and testing.
V Manage design and development activities with various teams comprising
of design, work shop, suppliers, customers and other key stake
holders.
V Worked with manufacturing engineering and suppliers to ensure designs
are manufactured per the blue prints.
V Demonstrated strong organizational skills to lead all aspects of the
project functions including scope definition, budgeting and
contingency planning.
V Own design activities such as concept generation, design finalization,
release of drawings, ordering parts from suppliers, building of units,
Evaluation/Reliability testing and fixing until the product completes
Pre-pilot phase.
V Participate in Key technical reviews and obtain key stakeholders
approvals.
V Coordinate design validation activities with model shop
V Optimize Design, Development and Documentation.
V Software's used Solid EDGE V16, GDS External & Auto CAD.
Retail & CPG Vertical, EIS, TCS Sep 2003 to Aug
2005
Customer: Procter & Gamble (Engineering), USA
Project Location: Hyderabad
Description: BCO Integration project.
Role: Team Member / Team Lead
Responsibilities:
V Work with internal and external customers to determine customer needs
and translate these needs to system /subsystem requirements.
V Design improvement and CAD documentation of production lines to
incorporate Binary Change Over.
V 3D CAD Modeling and Drafting of all the design affected Components.
V Meta Data entry for Parts and Assemblies using Global Design System
External, a client supplied tool
V Reviewing and Quality checking of all the Models, Drafts and
Assemblies as per the scope of the project.
V Delivery of improved design per the scope definition/statement of
work.
V Worked with manufacturing engineering and suppliers to ensure designs
are manufactured per the blue prints.
V Participate in Key technical reviews and obtain key stakeholders
approvals.
V Software's used Solid EDGE, GDS External & Auto CAD.
Technical Support Engineer - EIS, TCS Dec 2000 to Aug
2003
Customer: Multi clients, India
Project Location: Hyderabad
Description: Unigraphics post sales technical support.
Role: Support Executive
Responsibilities:
V Post sales technical support for Unigraphics users in Hyderabad
V Software installation and up-gradation.
V Unigraphics training to new clients.
V Correspondence between the TCS sales team and clients
V Monitoring customer accounts
V Providing data and reports to help the sales team
V Keeping track of sales targets
V Answering phone calls and scheduling diaries.
V Software used Unigraphics
AIM InfoTech Jan 2000 to Nov
2000
Customer: Lokesh machine Tools, India
Project Location: Hyderabad
Description: Redraw of Feed box assembly, Milling Head, Head stock Assembly
Role: Design Engineer
Responsibilities:
V Scope study and understanding expectations.
V Project Scheduling and Team building
V Task allocation to Team Members.
V Quality check and On-time delivery
V Monitoring project status and conducting weekly team meeting
V Participate in Key technical reviews and obtain key stakeholders
approvals Monitoring customer accounts
V CAD tools used Pro-Engineer 2000i2 and Auto CAD.
Montage Manufacturers Apr 1996 to Dec 1999
Customer: LPSC, DRRL and DRDO
Project Location: Hyderabad
Description: Redraw of legacy drawings and writing manufacturing codes for
CNC machines.
Role: Design Engineer
Responsibilities:
V Conversion of Legacy drawing to AutoCAD.
V Generating the Process Plan for shop floor.
V Generating G and M code for CNC Milling Wire EDM and RAM EDM machines
using Surf CAM and OptiCAM software's.
V Hands on experience on CNC Milling machines Viz., FP4A, FP3NC, and
FP7NC with controllers as SINUMERICK, GRUNDIG, and FANUC e.t.c.
V Hands on experience on CNC Wire EDM Machines Viz., ROBOFIL 230, and
SODICK and CHINA Wire Cut machines.
V Hands on experience on CNC RAM EDM Machines Viz., ROBOFORM 20, and
SODICK EDM machines.
V Production, Planning & Controlling of Tool Room Activities.
V Quality Control Activities. Viz., Stage inspection of Components on
the Manufacturing machines.
V Software's used Surf CAM 3.5, Opti-CAM and Auto CAD
Trainings
Course Description Course Type Date of
Completion
Six sigma Awareness Web Based 8/14/2012
Training
Project Communications Management Simulation Web Based 6/11/2010
Training
Ethics and Professional Knowledge Web Based 6/9/2010
Training
Project Human Resources Management Simulation Web Based 2/13/2010
Training
Planning and Identifying Project Risk Web Based 10/26/2009
Training
Web Based 10/21/2009
Training
Budgeting and Controlling Costs
Performing Quality Assurance and Control Web Based 10/21/2009
Training
Project Time Management Web Based 10/14/2009
Training
Project Integration: Executing and Completing a Web Based 10/11/2009
Project Training
Planning Project Scope Web Based 10/11/2009
Training
Initiating a Project and Preparing the Project Web Based 10/11/2009
Plan Training
Leadership Bench - Understanding the numbers Instructor-Led 12/19/2007
that drive Business
Performance Management Instructor-Led 1/11/2007
Project Scheduling Web Based 10/18/2009
Training