Marlyn W. REED
Ferndale, Washington
98248
Phone: 360-***-****/360-305-
0895
Email:
**********@*******.***
summary
** **** ***** ** *** Heavy Construction Industry with
multimillion dollar projects, including power generation
plants, gas turbine peripheral systems, chemical and
petrochemical plant piping, boiler piping fabrication and
inspections with past AWS CWI Certification.
My responsibilities have involved the review of
estimating, engineering, procurement, Plant loading,
safety, fabrication, erection and QA/QC monitoring.
Experience
2009-2012 Heath Tecna
Bellingham, WA
Aircraft Interiors Final Inspector
Final Inspection of production items utilizing
engineering drawings, customer requirements and FAA
specifications
2007-2009 ALSTOM POWER CAIRO, EGYPT
Manufacturing Coordinator
Fabrication of 9 HRSG (Heat Recovery Steam Generator)
2006-2007 Parsons Const. Group Sumner, Washington
Field Engineer
Construction of Weyerhaeuser Plant, chlorine System
.
Project Engineer for a 4 week shut down and expansion on
an Ethanol plant for Pacific Ethanol in Goshen, CA.
Projects: Weyerhaeuser Chlorine Plant, Longview-WA /
Pacific Ethanol, Goshen-CA.
2002-2005 Bachmann Industries Auburn, Maine
Technical Advisor
Technical Advisor
Assist the Contractor with:
Material ID, Erection techniques, review QC inspection
reports, welding inspection, X-rays, review lifting
plans,
Problem solving with respect to Erection, Welding,
scheduling, material tracking and confirm shipping
packages with the schedule.
Site List: Jordan, UAE, Canada, Argentina, Indiana, TN,
Tunisia, Utah, China, Peru.
2001-2002 Alstom-Premco Management Auburn, Maine
Technical Advisor
Responsible for the oversight of the mechanical
contractor (Able Construction) while building a new
control facility above the existing control room, in
operation, managing two steam turbine generators.
Project completed with letter of appreciation from the
client and Site Management.
Projects included: Spurlock Power Station, Kentucky &
Chesterfield Power Station for Dominion Power in
Richfield, Virginia.
2000-2001 Fagan, Inc.
Granite Falls, Minnesota
Field Superintendent
Fabrication and erection of two reactors and associated
piping for the FBS projects at Jayhawk Chemicals.
Supervision of piping department personnel for the
expansion projects. Projects conducted at Jayhawk
Chemicals, Kansas / MCP Exxol, Minnesota.
1997-2000 Kaefer Iso.
Bremen - Germany
Superintendent and Technical Advisor
Installation and Commissioning of Gas Turbine Exhaust
and Air Intake System with various peripheral systems
(Piping and Instrumentation) single as well as combined
cycle turbines.
Projects conducted at: Chile / Brazil / Vietnam / France
/ China
Education
1986 University of Tulsa, Oklahoma
Quality Control Engineering, Systems and Records.
1976 ABS - American Bureau of Ships
Quality Management Apprenticeship Training.
1971-1973 Central Baptist College, Conway-AR
02 Yr. Continuing Education.